§ 24-57.4 — DESIGN STANDARDS FOR STREAM BUFFERS
Code of Ordinances, City of Laredo, Texas (Supp. No. 23, Update 3: codified through Ordinance No. 2026-O-92, adopted May 4, 2026) · Laredo Land Development Code § 24-57.4
Corpus is an independent public-information project, not the official City of Laredo website. Stable reference: corpuslaw.us/code/f8d41b88-f9ee-45a4-bada-ddc9124d0762
Section 24-57.4 - DESIGN STANDARDS FOR STREAM BUFFERS
(A) The width for vegetative buffers shall depend on the order of the stream being developed. First and second order streams that are to be protected shall have a buffer originating from OHWM extending fifty (50) feet on either side of the stream. (B) The required width of a buffer for a third order stream will be fifty (50) feet on both sides measured from the OHWM twenty-five (25) feet shall be added for each level of increase in stream order. For example, a fourth order stream shall have a seventy-five (75) feet buffer, a fifth order stream should have a one hundred-foot buffer, etc. (C) For the Rio Grande, the boundary of the buffer zone shall be the one hundred (100) year flood plain or two hundred (200) feet from the OHWM of the watercourse, which ever is less. (D) Permanent boundary signs approved by the ESD Director shall be installed after construction has been completed. (E) The following are the exceptions: 1. Regardless of the stream order, the maximum width of the buffer, excluding the Rio Grande is one hundred (100) feet from the OHWM. 2. All development shall comply with the City's Floodplain Management Ordinance (2002-O-164) and Stormwater Management Ordinance (99-O-186) 3. The width of the buffer on each side of the stream may be adjusted (both width and length) as long as the total square footage of the buffer remains the same for the stream order but in no event shall the buffer be less than twenty-five (25) feet on any side. 4. The twenty-five (25) feet of buffer immediately adjacent to the OHWM, containing undisturbed native vegetation, is restricted to permitted road, utility crossings, stormwater management facilities and recreational facilities approved by the City. The remainder of the buffer, also containing native vegetation, is restricted to utility rights-of-way, designated biking/hiking paths, stormwater management facilities, and recreational facilities by the City.
Ask a question about Laredo law
Corpus searches the Laredo sections it holds and shows the ones that match, with their citations. Free, no sign-in.