(A) Protected stream systems and vegetative buffers shall be managed to enhance and maximize the unique value of these resources. Management includes specific limitations on alteration of the natural conditions of these resources. The following practices and activities are restricted within the vegetative buffer: 1. Clearing of any existing vegetation; 2. Soil disturbance by grading, stripping, or other practices; 3. Filling or dumping; 4. Use, storage, or application of herbicides. (B) The following structures, practices, and activities are permitted in the vegetative buffer, with specific design or maintenance features: 1. Roads, bridges, sidewalks, and utilities: a. These facilities may be constructed if such are required by the City; access to the property would be hindered or compromised because of the property's location; or if conditions specific to the land require it. In any of these instances the ESD Director may administratively grant approval or deny the request for the construction of said structure/s. In the event of denial by the ESD Director the issue may be appealed to the Planning and Zoning Commission whose decision shall be final. b. The right-of-way should be the minimum width needed to allow for maintenance access and installation. c. The angle of the crossing shall be as near to perpendicular as allowed by the ESD Director. In the event of denial by the ESD Director the issue may be appealed to the Planning and Zoning Commission whose decision shall be final. d. Every effort shall be made to minimize the number of road crossings within each subdivision and no more than one (1) road crossing is allowed for every one thousand two hundred (1,200) feet of buffer. 2. Stormwater Management: a. These facilities may be constructed if such are required by the City, the facilities are necessary for flood control or significantly improves water quality or habitat in the stream. In any of these instances the ESD Director may administratively grant approval or deny the request for the construction of said structure/s. In the event of denial by the ESD Director the issue may be appealed to the Planning and Zoning Commission whose decision shall be final. b. When constructing stormwater management facilities "best management practices" shall be observed (i.e., BMPs). The area cleared will be limited to the area required for construction and adequate maintenance access as outlined in the most recent edition of City of Laredo Stormwater Management Ordinance. c. Material dredged or otherwise removed (during construction or maintenance) from a stormwater management facility shall be stored outside the buffer. 3. Stream restoration projects approved by the ESD Director are permitted within the vegetative buffer. 4. Water quality monitoring and stream gauging are permitted within the vegetative buffer as approved by the ESD Director. 5. Individual trees within the buffer that are in danger of falling, causing damage to dwellings or other structures, or causing blockage of the stream, may be removed. Other tree cutting techniques approved by the ESD Director may be undertaken within the vegetative buffer under the advice and guidance of the Tree Board if necessary to preserve the riparian forest from extensive pest infestation and disease infestation. 6. Selective clearing for health and safety purposes is allowed as determined by the Fire Chief and/or the Health Department Director. (C) The Final Plat and all right-of-way plans shall clearly show the extent of any vegetative buffer on the subject property. (D) All protected vegetative buffer areas and stream systems shall run with the land and continue in perpetuity. Protected vegetative buffer areas and stream systems may be dedicated to the public by separate instrument (which must be submitted to the City Engineer for approval and recorded in the land records) unless the protected vegetative buffer area and stream system is dedicated to the public on the face of an approved plat. If the owner of the property desires to keep the stream system and buffer private, there shall be a covenant (which must be submitted to the City Engineer for approval and recorded in the land records) restricting the use of the stream system and buffer to uses set forth herein, and the owner must ensure that the stream system and buffer shall be maintained by the owner, his heirs successors and assigns for so long as the stream system and buffer remain private. (E) The ESD shall inspect the buffer annually and immediately following severe storms for evidence of sediment deposition, erosion, or concentrated flow channels. Corrective actions shall be taken to ensure the integrity and functions of the vegetative buffer. (F) The City of Laredo will maintain all vegetative buffer and stream systems that are created pursuant to Section 24-58.3 and have been dedicated to the public.

Ask a question about Laredo law

Corpus searches the Laredo sections it holds and shows the ones that match, with their citations. Free, no sign-in.