Sec. 31-138.3. - Connection fees for temporary construction meters.

Temporary construction meters (residential and commercial). Before requesting a temporary construction meter, a plumbing permit must be obtained from the building department. The utilities department will approve the sizing of the temporary construction meter(s) based on required flow rate submitted by customer or customer representative at the time of the request for the development. In addition, for commercial meters, an appropriate backflow preventer must be registered with the utilities department and then installed by the customer at the location. For commercial locations, if a plat approval has not been issued, then the request for a temporary construction meter will be forwarded to the utilities department for review and approval in order to ensure that the bacteriological and pressure tests are in compliance. The person desiring such meter shall first make an application and payment of fees (water availability, deposit, meter and meter installation) with the utilities department under sections 31-138.1 and 31-141. The meter will be read and billed for water only during this period based on the current rates Temporary construction meters shall be allowed for no longer than six (6) months for residential and no longer than nine (9) months for commercial construction. During these time frames, if a certificate of occupancy (CO) from the building department is obtained, the temporary construction meter would become a permanent meter and all costs of services will be added to the bill (sewer, garbage, federal/state mandates, stormwater, tax and any other fees approved by city council). The meter shall be installed, read and finally removed, if needed, by utilities' employees only. It is illegal to remove or replace the meter by any person other than a utilities department employee and is subject to an illegal connection fee as established under [sub]section 31-133(e).

(Ord. No. 2016-O-086, 8-1-16)