App. D — PERMIT FEES
Code of Ordinances, City of Laredo, Texas (Supp. No. 23, Update 3: codified through Ordinance No. 2026-O-92, adopted May 4, 2026) · Laredo Land Development Code, App. D
Corpus is an independent public-information project, not the official City of Laredo website. Stable reference: corpuslaw.us/code/ab0bcb49-e091-47c9-8736-59fbd8313805
APPENDIX D - PERMIT FEES
(1) Building Fees (a) The fees for permits required by Section 24-16.1 of this code shall be as follows: BUILDING PERMIT FEES Total Valuation | Fee $1,000.00 and less | No fee, unless inspection required, in which case a $15.00 fee for each inspection shall be charged $1,001.00 to $50,000.00 | $15.00 for the first $1,000.00 plus $5.00 for each additional thousand or fraction thereof, to and including $50,000.00 $50,001.00 to $100,000.00 | $260.00 for the first $50,000.00 plus $4.00 for each additional thousand or fraction thereof, to and include $100,000.00 $100,001.00 to $500,000.00 | $460.00 for the first 100,000.00 $500,000.00 plus $3.00 for each additional thousand or fraction thereof, to and including $500,000.00, $500,001.00 to $1,000,000.00 | $1,660.00 for the first $500,000.00 plus $2.00 for each additional thousand or fraction thereof, to and including $1,000,000.00 $1,000,001.00 and above | $2,000.00 for the first $1,000,000.00 plus $0.50 for each additional thousand or fraction thereof MOVING FEE For the moving of any building or structure, the fee shall be $100.00. DEMOLITION FEE For the demolition of any building or structures, the fee shall be: 0 up to 100,000 cu. ft. .....$50.00 100,000 cu. ft. and over .....$050/1,000 cu. ft. PENALTIES Where work for which a permit is required by this code is started or proceeded prior to obtaining said permit, the fees herein specified shall be doubled, but the payment of such double fee shall not relieve any persons from fully complying with the requirements of this code in the execution of the work nor from any other penalties prescribed herein. TECHNOLOGY FEE To provide for new plan review systems to aid in overall department efficiency, the fees shall be: Commercial: $100,000.00 or less .....$150.00 Greater than $100,000.00 .....$300.00 Residential: All Projects .....$20.00 PLAN-CHECKING FEES When the valuation of the proposed construction exceeds $1,000.00 and a plan is required to be submitted a non-refundable plan-checking fee shall be paid to the Building Official at the time of submitting plans and specifications for checking. Said plan-checking fee shall be equal to one-half of the permits of as set forth in up to a maximum of $1,500.00. Such plan-checking fee is in addition to the building permit fee. (2) Electrical Fees. (a) The fees for permits required by Section 24-20.1 of this chapter shall be as follows: (1) Basic fee .....$20.00 (2) In addition to the basic fee, there shall be charged the following fees per item: ..... Circuits, each .....3.00 Light fixtures, receptacles, each .....0.30 Motors 1 h.p., and smaller, each .....2.00 Motors over 1 h.p. to and include 5 h.p, each .....4.00 Motors 5 to 10 h.p, each .....5.00 Motors 10 to 25 h.p, each .....6.00 Motors over 25 h.p, each .....15.00 Services up to 60 amperes, each .....3.00 Services 61 to 100 amperes, each .....4.00 Services 101 to 200 amperes, each .....5.00 Services 201 to 400 amperes, each .....8.00 Services over 400 amperes, each .....18.00 Services, each additional meter, each .....3.00 Appliances (range, hot water heater, dryers, dishwashers, disposals, etc.), each .....3.00 Equipment - X-Ray machine, each .....15.00 Equipment - Moving picture projector, each .....15.00 Equipment - Welding machine (transformer type), each .....4.00 Equipment - Gasoline pump, each .....5.00 Equipment - Elevators, each .....15.00 Equipment - Others, each .....4.00 Signs, minimum, each .....4.00 Signs, more than 2 transformers, each .....4.00 Per transformer, each .....3.00 (3) Reinspection fee, each .....10.00 (4) Investigation fee, each .....10.00 (5) Technology fee, each .....10.00 (3) Plumbing Permits: (a) Permits fees shall be charged and collected for plumbing work, extensions or repairs as follows: PLUMBING PERMIT FEES Permit Fees: For issuing permits .....$20.00 Plus the following when provided: For each Plumbing Fixtures, Floor Drain or Trap (including Water and Drainage Piping) .....$ 3.00 For each House Sewer .....$6.00 For each House Sewer having to be replaced or repaired .....$6.00 For each Cesspool .....$6.00 For each Septic Tank and seepage Pit or drainfield .....$15.00 For installation, alteration or repair of water piping and/or water equipment .....$6.00 For repair or alteration of drainage or Vent piping .....$6.00 For vacuum breaker or backflow protective devices installed subsequent to the installation of the piping or equipment served: One to Five .....$3.00 Over five, each .....$2.00 (b) The plumbing inspector shall charge an additional ten dollars ($10.00) for each inspection after the first inspection requiring an additional trip to a location. (c) A technology fee in the amount of $10.00 will be assessed to every residential permit to provide for new plan review systems to aid in overall department efficiency. (4) Mechanical Permits: Permits for mechanical work required under Subsection 24-15(3) shall be as follows: MECHANICAL PERMIT FEES Initial Fee: For issuing each permit .....$20.00 Technology fee .....$10.00 Additional Fees: Fee for inspecting heating, venting, duct work, air-conditioning and refrigeration systems shall be $20.00 for the first $1,000.00, or fraction thereof, of valuation of the installation plus $3.00 for each additional $1,000.00 or fraction thereof. Fee for inspecting repairs, alteration and addition to an existing system shall be $10.00 plus $3.00 for each $1,000.00 or fraction thereof. Fee for inspecting boilers (based upon Btu input): 33,000 Btu (1 BHp) to 165,000 (5 BHp) .....$10.00 165,001 Btu (5 BHp) to 330,000 (10 BHp) .....$15.00 330,001 Btu (10 BHp) to 1,165,000 (52 BHp) .....$20.00 1,165,001 Btu (52 BHp) to 3,300,000 (98 Bhp) .....$30.00 Over 3,300,000 Btu .....$40.00 FEE FOR REINSPECTION: In case it becomes necessary to make a reinspection of heating, ventilation, air conditioning or refrigeration system, or boiler installation, of such equipment shall be paid a reinspection fee of $10.00. TEMPORARY OPERATION INSPECTION FEE: When preliminary inspection is requested for purpose of permitting temporary operation of a heating, ventilating, refrigeration, or air conditioning system, or portion thereof, a fee of $10.00 shall be paid by the contractor requesting such preliminary inspection. If the system is not approved for temporary operation on the first preliminary inspection, the usual reinspection fee shall be charged for each subsequent preliminary inspection of such purpose. Self contained units less than two tons. In buildings, except one and two family dwelling, where self-contained air conditioning units of less than two tons are to be installed, the fee charge shall be that for the total cost of all units combined.
(Ord. No. 2021-O-164, § 2, 9-7-21)
Ask a question about Laredo law
Corpus searches the Laredo sections it holds and shows the ones that match, with their citations. Free, no sign-in.