§ 7-605 — Oil or gas well permit required
Code of Ordinances of the City of Lewisville, Texas (Supp. No. 34: codified through Ordinance No. 0854-26-ORD, adopted July 6, 2026) · Lewisville City Code § 7-605
Corpus is an independent public-information project, not the official City of Lewisville website. Stable reference: corpuslaw.us/code/72c3ec62-acb3-4a2a-8165-f11b0eb40578
Sec. 7-605. - Oil or gas well permit required.
(a) A person wanting to engage in and operate in oil or gas production activities shall apply for and obtain an oil or gas well permit from the city. It shall be unlawful for any person acting either for himself or acting as agent, employee, independent contractor, or servant for any person to drill any well, assist in any way in the site preparation, reworking, fracturing or operation of any such well or to conduct any activity related to the production of oil or gas without first obtaining an oil or gas well permit issued by the city in accordance with this article. Such activities include, but are not limited to reworking, initial site preparation, drilling, operation, construction of rigs or tank batteries, fracturing and pressurizing. A permit shall be required for seismic surveys. (b) The operator must apply for and obtain an oil or gas well permit for the drilling, redrilling, deepening, reentering, activating or converting of each well. (c) An oil or gas well permit shall not constitute authority for the reentering and drilling of an existing or abandoned well. An operator shall obtain a new oil or gas well permit in accordance with the provisions of this article if the operator is reentering and drilling an abandoned well. (d) When an oil or gas well permit has been issued to the operator for the drilling, redrilling, deepening, reentering, activating or converting of a well, such oil or gas well permit shall constitute sufficient authority for drilling, operation, production gathering or production maintenance, repair, reworking, testing, plugging and abandonment of the well and/or any other activity associated with mineral exploration at the site of such well, provided, however, that a new or supplemental permit shall be obtained before such well may be reworked for purposes of redrilling, deepening or converting such well to a depth or use other than that set forth in the then current permit for such well. (e) Any person who intends to rework a permitted well using a drilling rig, to fracture stimulate a permitted well after initial completion or to conduct seismic surveys or other exploration activities shall give written notice to the oil and gas inspector no less than 15 days before the activities begin. The notice must identify where the activities will be conducted and must describe the activities in detail, including whether explosive charges will be used, the duration of the activities and the time the activities will be conducted. The notice must also provide the address and 24-hour phone number of the person conducting the activities. A sign will also be posted on the property giving the public notice of the activities, including the name, address and 24-hour phone number of the person conducting the activities. Information on the sign shall be legible from the nearest roadway. The following requirements shall apply to all fracture stimulation operations performed on a well within 800 feet of residence protected use: (1) At least 48 hours before operations are commenced, the operator shall post a sign at the entrance of the well site advising the public of the date the operations will commence; (2) "Flowback" operations to recover fluids used during fracture stimulation shall be exempt from work hour restrictions, but shall be subject to compliance with noise restrictions contained in this article; (3) A watchman shall be required at all times during such operations; and (4) At no time shall the well be allowed to flow or vent directly to the atmosphere without first directing the flow through separation equipment or into a portable tank. (f) An oil or gas well permit shall automatically terminate, unless extended, if drilling is not commenced within 180 days from the date of the issuance of the oil or gas well permit. Drilling must commence within 180 days from the date of the issuance of the oil or gas well permit in order to maintain the validity of the oil or gas well permit. An oil or gas well permit may be extended by the oil and gas inspector for an additional 180 days upon request by the operator and proof that the engineering site plan for the requested oil or gas well permit for such location has not changed. (g) The oil or gas well permits required by this article are in addition to and are not in lieu of any permit which may be required by any other provision of this Code or by any other governmental agency. (h) No additional oil or gas well permit or filing fees shall be required for: (1) Any wells, existing, previously permitted or approved by the city, within the corporate limits of the city on the effective date of this article; or (2) Any wells which drilling has commenced on the effective date of this article; or (3) Any wells in existence or on any wells on which drilling has commenced on land annexed into the city after the effective date of this article; or (4) Any well that was planned for the land before the 90th day before the effective date of its annexation and one or more licenses, certificates, permits, approvals, or other forms of authorization by a governmental entity were required by law for such well and the completed application for the initial authorization was filed before the date the annexation proceedings were instituted. (i) No oil or gas well permit shall be issued for any well to be drilled within any floodway as defined by the most current FEMA map, without the prior consent of the city council. (j) Oil and gas well permits may be issued on property located in a floodplain, provided that all water and drilling materials must be in steel containers except for the concrete pad. No reserve pits shall be allowed in the floodplain. An engineer's certificate shall be provided showing no negative impact on water flow in the floodplain. (k) No oil or gas well permit shall be issued for any well to be drilled on city owned property without the prior consent of the city council. (l) By acceptance of any oil or gas well permit issued pursuant to this article, the operator expressly stipulates and agrees to be bound by and comply with the provisions of this article. The terms of this article shall be deemed to be incorporated in any oil or gas well permit issued pursuant to this article with the same force and effect as if this article was set forth verbatim in such oil or gas well permit.
(Ord. No. 3673-05-2009, § 1, 5-4-09)
Ask a question about Lewisville law
Corpus searches the Lewisville sections it holds and shows the ones that match, with their citations. Free, no sign-in.
