§ 39.07.045: Delay of improvements.
a. Generally. In addition to the applicable required procedures in Division 7.1, Purpose, Applicability, and Common Review Procedures, the following shall apply to Delays. b. Purpose. Delay of water, wastewater, or paving may be requested, subject to the requirements of this Section. The purpose of a Delay of Improvements is to allow the subdivider to postpone the installation of infrastructure required in Section 39.04.005, Street Network and Design, Section 39.04.012, Public Water Systems, and Section 39.04.013, Public Wastewater Systems, specifically as such Sections relate to extending new or improving existing water or wastewater lines or streets. A Delay of Improvements request may only be considered concurrently with a Preliminary Plat. In the event a Preliminary Plat is not required, a Waiver of Improvements request may be considered concurrently with a Final Plat or Replat. The subdivider shall include as part of the Plat application the reason(s) they should be eligible for a Delay in accordance with this Section. Failure to submit such information shall render the Plat application incomplete. c. Eligibility. A subdivider may only request a Delay of Improvements for: 1. A property that will be served by infrastructure that the City has listed in the most recently approved Capital Improvement Plan adopted with the City's most recently adopted budget, to install, extend, or improve the infrastructure within two years from the time of platting; or 2. Paving, if it is shown that compliance would be impractical (for example, installation of paving would not be connected to any adjacent paving on any side and therefore would be rendered useless, the street(s) in the proposed development would create elevation differences with adjacent City street projects and would have to be torn out and/or replaced by the City upon completing City projects, or other similar circumstances as determined by the City Engineer). The subdivider must provide the reasons why compliance is impractical; and 3. Negative impact. Granting of the delay would not otherwise negatively impact the design of the subdivision or the ability to subdivide adjacent sites in the future. d. Fee-in-lieu. 1. Fee required. If the subdivider receives approval of the Delay of Improvements, he or she shall pay a fee-in-lieu of installing the required water, wastewater, or street paving prior to the City's acceptance of the subdivision. The fee-in-lieu shall be the cost of designing and installing the required improvements, based on a cost estimate that the subdivider shall provide to the City Engineer. The cost estimate shall be sealed by the subdivider's engineer of record and approved by the City. 2. Use of fees. The City shall only use fees collected herein for the construction of water or wastewater facilities or paved streets that directly benefit the subject property. 3. Deposits. All fees-in-lieu of installation shall be deposited in a fund referenced to the subdivision to which it relates. e. Installation guarantee alternative. 1. Installation guarantee alternative. If the subdivider receives approval of the Delay of Improvements request and will install improvements within two years of Plat approval, he or she shall provide an installation guarantee in the form of a letter of credit or bond for the amount of the improvement(s) and in a form approved by the City Attorney. 2. Calling the installation guarantee. If the subdivider does not install, or the City does not accept, the infrastructure that is the subject of the Delay of Improvements within two years after approval of the Delay of Improvements, then the City Engineer may request the installation guarantee from the guarantor so that the delayed improvements may be paid for and installed. f. Specific decision criteria. In determining whether to approve or deny a request for Delay of Improvements, the applicable review bodies shall consider the applicable common decision criteria in Section 39.07.006, Common Decision Criteria, and the following: 1. Eligibility. The subject property is eligible for a Delay of Improvements based on the provisions in Subsection c., Eligibility, above. 2. Strict application. Strict application of the installation requirement requested to be delayed renders platting of the subject property unfeasible. 3. Minimum necessary. The Delay of Improvements requested is the minimum necessary that will make possible platting of the subject property. 4. Negative impact. Granting of the Delay of Improvements would not otherwise negatively impact the design of the subdivision or the ability to subdivide adjacent sites in the future. g. Affirmative findings. In order to approve a request for Delay of Improvements, the final decision-making body shall make affirmative findings on all of the applicable decision criteria. h. Appeal. Any party aggrieved by or alleging error in the final decision of a Delay of Improvements request may appeal to the City Council.
( Ordinance 2023-O0054 adopted 5/9/2023 ; Ordinance 2024-O0110 adopted 8/27/2024 )
Ask a question about Lubbock law
Corpus searches the Lubbock sections it holds and shows the ones that match, with their citations. Free, no sign-in.