§ 39.07.046: Parallel construction alternative.

a. Generally. In addition to the applicable required procedures in Division 7.1, Purpose, Applicability, and Common Review Procedures, the following shall apply to the Parallel Construction Alternative. b. Purpose. Parallel construction of water, wastewater, or paving may be requested, subject to the requirements of this Section. The purpose of a Parallel Construction Altenative is to allow more efficient construction of infrastructure installation required in Section 39.04.005, Street Network and Design, Section 39.04.012, Public Water Systems, and Section 39.04.013, Public Wastewater Systems, specifically as such Sections relate to extending new or improving existing water or wastewater lines or streets. A Parallel Construction Alternative request may only be considered concurrently with a Preliminary Plat, or Final Plat, or Replat. The subdivider shall include as part of the Plat application the reason(s) they should be eligible for the Alternative in accordance with this Section. Failure to submit such information shall render the Plat application incomplete. c. Eligibility. A subdivider may only request the Parallel Construction Alternative for: 1. A Plat application that was filed on or after October 1, 2023; 2. Plats that contain only commercial tracts, multi-family, office, and industrial tracts, and only contain four tracts or less; and 3. Granting of the Parallel Construction Alternative would not otherwise negatively impact the design of the subdivision or the ability to subdivide adjacent sites in the future. d. Bond-in-lieu of required improvements. 1. Installation guarantee. If the subdivider receives approval of the Parallel Construction Alternative request, he or she shall provide an installation guarantee in the form of a letter of credit or bond for the amount of the improvement(s) and in a form approved by the City Attorney. The letter of credit or bond must be received and accepted by the City prior to issuance of Building Permit. 2. Calling the installation guarantee. If the subdivider does not install, or the City does not accept, the infrastructure that is the subject of the Parallel Construction Alternative within two years after approval of the Final Plat recording date, then the City Engineer may request the installation guarantee from the guarantor so that the improvements may be paid for and installed. An extension may be granted at the discretion of the City Engineer. e. Specific decision criteria. In determining whether to approve or deny a request for Parallel Construction Alternative,, the applicable review bodies shall consider the applicable common decision criteria in Section 39.07.006, Common Decision Criteria, and the following: 1. Eligibility. The subject property is eligible for a Parallel Construction Alternative based on the provisions in Subsection c., Eligibility, above. 2. Negative impact. Granting of the Parallel Construction Alternative would not otherwise negatively impact the design of the subdivision or the ability to subdivide adjacent sites in the future. f. Affirmative findings. In order to approve a request for the Parallel Construction Alternative, the City Engineer shall make affirmative findings on all of the applicable decision criteria. g. Building permit. If a request for the Parallel Construction Alternative is granted, a building permit may be issued prior to the infrastructure being accepted by the City. If at any time the subdivider abandons work on infrastructure required in Section 39.04.005, Street Network and Design, Section 39.04.012, Public Water Systems, and Section 39.04.013, Public Wastewater Systems, requests for Building Permit Inspections will be denied until the subdivider resumes work on infrastructure. Under no circumstances shall a Temporary or Final Certificate of Occupancy be granted until such time as all infrastructure required in Section 39.04.005, Street Network and Design, Section 39.04.012, Public Water Systems, and Section 39.04.013, Public Wastewater Systems has been accepted by the City. h. Appeal. Any party aggrieved by or alleging error in the final decision of a Parallel Construction Alternative request may appeal to the Planning and Zoning Commission.

( Ordinance 2024-O0108 adopted 8/27/2024 ; Ordinance 2025-O0095 adopted 8/18/2025 )