§ 106-185 — Wastewater discharge permit issuance process
Code of Ordinances, City of McAllen, Texas (through Ord. 2026-83 adopted 2026-08-24) · McAllen Code of Ordinances § 106-185
Corpus is an independent public-information project, not the official City of McAllen website. Stable reference: corpuslaw.us/code/fdcab2b7-baba-45b8-9948-a198ba9d909a
§ 106-185: Wastewater discharge permit issuance process.
(a) Wastewater discharge permit duration. A wastewater discharge permit shall be issued for a specified time period, not to exceed five years from the effective date of the permit. A wastewater discharge permit may be issued for a period less than five years, at the discretion of the general manager. Each wastewater discharge permit will indicate a specific date upon which it will expire. (b) Wastewater discharge permit contents. A wastewater discharge permit shall include such conditions as are deemed reasonably necessary by the general manager to prevent pass through or interference, protect the quality of the water body receiving the treatment plant's effluent, protect worker health and safety, facilitate sludge management and disposal, and protect against damage to the POTW. (1) Wastewater discharge permits must contain: a. A statement that indicates wastewater discharge permit issuance date, effective date and the duration, which in no event shall exceed five years; b. A statement that the wastewater discharge permit is nontransferable without prior notification to the control authority in accordance with subsection (e) of this section, and provisions for furnishing the new owner or operator with a copy of the existing wastewater discharge permit; c. Effluent limits based on applicable pretreatment standards include best management practices (BMPs); d. Self-monitoring, sampling, reporting, notification, and record-keeping requirements including BMPs. These requirements shall include an identification of pollutants to be monitored, sampling location, sampling frequency, and sample type based on federal, state, and local law; and e. A statement of applicable civil and criminal penalties for violation of pretreatment standards and requirements, and any applicable compliance schedule. Such schedule may not extend the time for compliance beyond that required by applicable federal, state, or local law. f. Requirements to control slug discharge, if determined by the general manager to be necessary. The general manager shall evaluate within one year of being designated as a significant industrial user (SIU), whether each such SIU needs a plan or other action to control slug discharge. (2) Wastewater discharge permits may contain, but need not be limited to, the following conditions: a. Limits on the average and/or maximum rate of discharge, time of discharge, and/or requirements for flow regulation and equalization; b. Requirements for the installation of BMPs pretreatment technology, pollution control, or construction of appropriate containment devices, designed to reduce, eliminate, or prevent the introduction of pollutants into the treatment works; c. Requirements for the development and implementation of spill control plans or other special conditions including management practices necessary to adequately prevent accidental, unanticipated, or non-routine discharges. The review of such plans and operating procedures and the issuance of the waste discharge permit will in no way relieve the user from the responsibility of modifying the facility as necessary to produce an effluent acceptable to the control authority under the provisions of this division; d. Development and implementation of waste minimization plans to reduce the amount of pollutants discharged to the POTW; e. The unit charge or schedule of user charges and fees for the management of the wastewater discharged to the POTW; f. Requirements for installation and maintenance of inspection and sampling facilities and equipment; g. A statement that compliance with the wastewater discharge permit does not relieve the permittee of responsibility for compliance with all applicable federal and state pretreatment standards, including those which become effective during the term of the wastewater discharge permit; h. Compliance schedules; i. Other conditions as deemed appropriate by the general manager to ensure compliance with this division, and state and federal laws, rules, and regulations; j. An agreement by the user that such user shall be responsible for maintenance of the facilities in operating condition at the user's sole expense; that the user shall pay all charges and surcharges applicable to pretreatment or the treatment of waste by the city; and that the user will comply with all the reporting requirements of the city; (c) (Reserved) (d) Wastewater discharge permit modification. The general manager may modify a wastewater discharge permit for good cause, including, but not limited to, the following reasons: (1) To incorporate any new or revised federal, state, or local pretreatment standards or requirements; (2) To address significant alterations or additions to the user's operation, processes, or wastewater volume or character since the time of wastewater discharge permit issuance; (3) A change in the POTW that requires either a temporary or permanent reduction or elimination of the authorized discharge; (4) Information indicating that the permitted discharge poses a threat to POTW, POTW personnel, or the receiving waters; (5) Violation of any terms or conditions of the wastewater discharge permit; (6) Misrepresentations or failure to fully disclose all relevant facts in the wastewater discharge permit application or in any required reporting; (7) Revision of or a grant of variance from categorical pretreatment standards pursuant to 40 CFR 403.13; (8) To correct typographical or other errors in the wastewater discharge permit; or (9) To reflect a transfer of the facility ownership or operation to a new owner or operator. The existing permit holder shall be informed of any proposed changes in the permit at least 30 days prior to the effective date of the requirement of any such change. (e) Wastewater discharge permit transfer. Wastewater discharge permits may be transferred to a new owner or operator only if the permittee gives at least 30 days' advance notice to the general manager and the general manager approves the wastewater discharge permit transfer. The notice to the general manager must include a written certification by the new owner or operator which: (1) States that the new owner and/or operator has no immediate intent to change the facility's operations and processes; (2) Identifies the specific date on which the transfer is to occur; and (3) Acknowledges full responsibility for complying with the existing wastewater discharge permit. Failure to provide advance notice of a transfer renders the wastewater discharge permit void as of the date of facility transfer. (f) Wastewater discharge permit revocation. The general manager may revoke a wastewater discharge permit for good cause, including, but not limited to, the following reasons: (1) Failure to notify the general manager of significant changes to the wastewater prior to the changed discharge; (2) Failure to provide prior notification to the general manager of changed conditions pursuant to subsection 106-186(f) of this division; (3) Misrepresentation or failure to fully disclose all relevant facts in the wastewater discharge permit application; (4) Falsifying self-monitoring reports and certification statements in accordance with 40 CFR § 403.8 (f)(1)(vi)(B); (5) Tampering with monitoring equipment; (6) Refusing to allow the control authority's timely access to the facility premises and records; (7) Failure to meet effluent limitations; (8) Failure to pay fines; (9) Failure to pay sewer charges; (10) Failure to meet compliance schedules; (11) Failure to complete a wastewater survey or the wastewater discharge permit application; (12) Failure to provide advance notice of the transfer of business ownership of a permitted facility; or (13) Violation of any pretreatment standard or requirement, or any terms of the wastewater discharge permit or this division. Wastewater discharge permits shall be voidable upon cessation of operations or transfer of business ownership. All wastewater discharge permits issued to a particular user are void upon the issuance of a new wastewater discharge permit to that user. (g) Wastewater discharge permit reissuance. A user with an expiring wastewater discharge permit shall apply for wastewater discharge permit reissuance by submitting a complete permit application, in accordance with subsection 106-184(e) of this division, a minimum of 90 days prior to the expiration of the user's existing wastewater discharge permit. (h) Regulation of waste received from other jurisdictions. (1) If another municipality, or user located within another municipality, contributes wastewater to the POTW, [the] general manager shall enter into an inter-municipal agreement with the contributing municipality. (2) Prior to entering into an agreement, the general manager shall request the following information from the contributing municipality: a. A description of the quality and volume of wastewater discharged to the POTW by the contributing municipality; b. An inventory of all users located within the contributing municipality that are discharging to the POTW; and c. Such other information as the general manager may deem necessary. (3) An inter-municipal agreement, as required by subsection (h)(1), above, shall contain the following conditions: a. A requirement for the contributing municipality to adopt a sewer use ordinance which is at least as stringent as this division and local limits which are at least as stringent as those set out in subsection 106-182(d) of this division. The requirement shall specify that such ordinance and limits must be revised as necessary to reflect changes made to the city's ordinance or local limits; b. A requirement for the contributing municipality to submit a revised user inventory on at least an annual basis; c. A provision specifying which pretreatment implementation activities, including wastewater discharge permit issuance, inspection and sampling, and enforcement, will be conducted by the contributing municipality; which of these activities will be conducted by the general manager; and which of these activities will be conducted jointly by the contributing municipality and the general manager; d. A requirement for the contributing municipality to provide the general manager with access to all information that the contributing municipality obtains as part of its pretreatment activities; e. Limits on the nature, quality, and volume of the contributing municipality's wastewater at the point where it discharges to the POTW; f. Requirements for monitoring the contributing municipality's discharge; g. A provision ensuring the general manager access to the facilities of users located within the contributing municipality's jurisdictional boundaries for the purpose of inspection, sampling, and any other duties deemed necessary by the general manager; and h. A provision specifying remedies available for breach of the terms of the inter-municipal agreement.
( Ordinance 2010-32 , § I, adopted 5/24/2010 ; Ordinance 2020-04 , § I, adopted 1/27/2020 )
Ask a question about McAllen law
Corpus searches the McAllen sections it holds and shows the ones that match, with their citations. Free, no sign-in.