§ 106-186: Reporting requirements.
(a) Preliminary reporting requirements. (1) Any industrial user, categorical user or significant industrial user of the POTW shall be required within 30 days of request from the control authority to answer and reply to a sewer quality questionnaire form (Form 15: Preliminary Investigation Report for Potential Industrial Users) as promulgated by the general manager. The purposes of the requirement for the form shall be to determine the quality of the sewer effluent being discharged from any such user into the POTW for determination of compliance with the provisions of this division or for a determination of whether pretreatment approval should be requested from the control authority. (2) Should any user fail to reply in a satisfactory fashion to the questionnaire, such failure to respond shall be considered a violation of the provisions of this division and subject any such person to the enforcement provisions of this division. The request to answer such questionnaire shall be evidenced by the deposit of such questionnaire to the user at its billing address as shown on the records of the public utility. (3) In addition to the enforcement provisions as provided for in this division, the control authority, upon failure of any user to satisfactorily answer the questionnaire as provided in this section, may cause the waste being discharged from such user to be tested and the costs therefore shall then be payable by the user to the city. Should such user fail to pay such costs upon 30-days' notice from the city, this shall be considered as a failure to pay a city utility bill and utility service may be cut off by the city upon the failure to make such payment. (b) Baseline monitoring reports. (1) Within either 180 days after the effective date of a categorical pretreatment standard, or the final administrative decision on a category determination under 40 CFR 403.6(a)(4), whichever is later, existing industrial users currently discharging to or scheduled to discharge to the POTW shall submit to the general manager a report which contains the information listed in subsection (b)(2), below. At least 90 days prior to commencement of their discharge, new sources, and sources that will become categorical users subsequent to the promulgation of an applicable categorical standard, shall submit to the general manager a report which contains the information listed in subsection (b)(2), below. (2) Users described above shall submit the information set forth below. a. Identifying information. The name and address of the facility, including the name of the operator and owner. b. Environmental permits. A list of any environmental control permits held by or for the facility. c. Description of operations. A brief description of the nature, average rate of production, and standard industrial classifications of the operation(s) carried out by such user. This description should include a schematic process diagram which indicates points of discharge to the POTW from the regulated processes. d. Flow measurement. Information showing the measured or estimated average daily and maximum daily flow, in gallons per day, to the POTW from regulated process streams and other streams. If combined wastestream formula applies, provide sufficient information to allow combined wastestream formula to be determined set out in 40 CFR 403.6(e). New sources must estimate flows. e. Measurement of pollutants. 1. The categorical pretreatment standards applicable to each regulated process and any new categorically regulated processes for existing sources. Where the standard requires compliance with a BMP or pollution prevention alternative, the user shall submit documentation as required by the general manager or the applicable standard to determine compliance with the standard. 2. The results of sampling and analysis identifying the nature and concentration, and/or mass, where required by the standard or by the general manager, of regulated pollutants in the discharge from each regulated process. Instantaneous, daily maximum, and long-term average concentrations, or mass, where required, shall be reported. The sample shall be representative of daily operations and shall be analyzed in accordance with procedures set out in subsection (k) of this section. The frequency of monitoring for the reports of this section shall be prescribed in the applicable pretreatment standard. New sources must estimate concentrations. 3. The user shall take a minimum of one representative sample to compile that data necessary to comply with the requirements of this paragraph. 4. Samples should be taken immediately downstream from pretreatment facilities if such exist or immediately downstream from the regulated process if no pretreatment exists. If other wastewaters are mixed with the regulated wastewater prior to pretreatment the user should measure the flows and concentrations necessary to allow use of the combined wastestream formula in 40 CFR 403.6(e) to evaluate compliance with the pretreatment standards. Where an alternate concentration or mass limit has been calculated in accordance with 40 CFR 403.6(e) this adjusted limit along with supporting data shall be submitted to the general manager. 5. The general manager may allow the submission of a baseline report which utilizes only historical data so long as the data provides information sufficient to determine the need for industrial pretreatment measures. 6. The baseline report shall indicate the time, date and place of sampling and methods of analysis, and shall certify that such sampling and analysis is representative of normal work cycles and expected pollutant discharges to the POTW. 7. Sampling must be performed in accordance with procedures set out in subsections (k) (analytical requirements) and (l) (sample collection) of this section. f. Certification. A statement, reviewed by the user's authorized representative and certified by a qualified professional, indicating whether pretreatment standards are being met on a consistent basis, and, if not, whether additional operation and maintenance (O and M) and/or additional pretreatment is required to meet the pretreatment standards and requirements. g. Compliance schedule. If additional pretreatment and/or O and M will be required to meet the pretreatment standards, the shortest schedule by which the user will provide such additional pretreatment and/or O and M must be provided. The completion date in this schedule shall not be later than the compliance date established for the applicable pretreatment standard. A compliance schedule pursuant to this section must meet the requirements set out in subsection (c) of this section. h. Signature and certification. All baseline monitoring reports must be signed and certified in accordance with subsection 106-184(f) of this division. (c) Compliance schedule progress reports. The following conditions shall apply to the compliance schedule required by subsection (b)(2)g. of this section: (1) The schedule shall contain progress increments in the form of dates for the commencement and completion of major events leading to the construction and operation of additional pretreatment including BMPs required for the user to meet the applicable pretreatment standards (such events include, but are not limited to, hiring an engineer, completing preliminary and final plans, executing contracts for major components, commencing and completing construction, and beginning and conducting routine operation); (2) No increment referred to above shall exceed nine months; (3) The user shall submit a progress report to the general manager no later than 14 days following each date in the schedule and the final date of compliance including, as a minimum, whether or not it complied with the increment of progress, the reason for any delay, and, if appropriate, the steps being taken by the user to return to the established schedule; and (4) In no event shall more than nine months elapse between such progress reports to the general manager. (d) Reports on compliance with categorical pretreatment standard deadline. Within 90 days following the date for final compliance with applicable categorical pretreatment standards established in 40 CFR Part 403.6(b), or in the case of a new source following commencement of the introduction of wastewater into the POTW, any user subject to such pretreatment standards and requirements shall submit to the general manager a report containing the concentration and flow information described in subsection [(b)(2)d, e.] of this section. In cases where the pretreatment standard requires compliance with a best management practice (BMP) or pollution prevention alternative, the user must submit documentation required by the general manager or the pretreatment standard necessary to determine the compliance status of the user. For users subject to equivalent mass or concentration limits established in accordance with the procedures in 40 CFR 403.6(c), this report shall contain a reasonable measure of the user's long-term production rate. For all other users subject to categorical pretreatment standards expressed in terms of allowable pollutant discharge per unit of production (or other measure of operation), this report shall include the user's actual production during the appropriate sampling period. All compliance reports must be signed and certified in accordance with subsection 106-184(f) of this division. (e) Periodic compliance reports. (1) All significant industrial users subject to national categorical pretreatment standards, and other non-categorical significant industrial users as identified by the general manager shall during the months of June and December, unless required more frequently by the general manager, submit a report indicating the nature and concentration of any regulated pollutants at the appropriate sampling location in the discharge which are limited by pretreatment standards. In cases where the pretreatment standard requires compliance with a best management practice (BMP) or pollution prevention alternative, the user must submit documentation required by the general manager or the pretreatment standard necessary to determine the compliance status of the user. In addition, this report shall include a record of measured or estimated average and maximum daily flows and data obtained through appropriate sampling and analysis performed during the reporting period. At the discretion of the general manager and in consideration of such factors as local high or low flow rates, holidays, budget cycles, etc., the general manager may agree to alter the months during which reports under this subsection are to be submitted. At the general manager's discretion, sampling and analysis may be performed by the control authority in lieu of industrial monitoring. All periodic compliance reports must be signed and certified in accordance with subsection 106-184(f) of this division. (2) The general manager may impose mass limitations on users which are using dilution, if otherwise allowable, to meet applicable pretreatment standards or requirements, or in other cases where the imposition of mass limitations are appropriate. In such cases, the report required by subsection (e)(1) of this section shall indicate the mass of pollutants regulated by national categorical pretreatment standards in the effluent of the user. These reports shall contain the results of sampling and analysis of the discharge, including the flow and the nature and concentration, or production and mass where requested by the general manager, of pollutants contained therein which are limited by the applicable national categorical pretreatment standards. (3) All wastewater samples must be representative of the user's discharge. Wastewater monitoring and flow measurement facilities shall be properly operated, kept clean, and maintained in good working order at all times. The failure of a user to keep its monitoring facility in good working order shall not be grounds for the user to claim that sample results are unrepresentative of its discharge. (4) If a user subject to the reporting requirement in this section monitors any pollutant more frequently than required by the general manager, using the procedures prescribed in subsections 106-186(k) (analytical requirements) and 106-186(l) (sample collection) of this section, the results of this monitoring shall be included in the report. (f) Reports of changed conditions. Each user must notify the control authority or the general manager of any planned substantial change in the volume or character of pollution in their discharges at least 30 days before the change. (1) The general manager may require the user to submit such information as may be deemed necessary to evaluate the changed condition, including the submission of a wastewater discharge permit application under subsection 106-184(e) of this division. (2) The general manager will determine whether a new permit, a revision of an existing permit, or no permit change is required in response to the changed condition. (g) Reports of potential problems. (1) In the case of any discharge, including, but not limited to, accidental discharges, discharges of a non-routine, episodic nature, a non-customary batch discharge, or a slug load, that may cause potential problems for the POTW, the user shall immediately telephone and notify the control authority of the incident. This notification shall include the location of the discharge, type of waste, concentration and volume, if known, and corrective actions taken by the user. Significant industrial users are required to notify the general manager immediately of any changes at its facility affecting the potential for a slug discharge. (2) Within five days following such discharge, the user shall, unless waived by the general manager, submit a detailed written report describing the cause(s) of the discharge and the measures to be taken by the user to prevent similar future occurrences. Such notification shall not relieve the user of any expense, loss, damage, or other liability which may be incurred as a result of damage to the POTW, natural resources, or any other damage to person or property; nor shall such notification relieve the user of any fines, penalties, or other liability which may be imposed pursuant to this division. (3) A notice shall be permanently posted on the user's bulletin board or other prominent place advising employees who to call in the event of a discharge as described in subsection (g)(1), above. Employers shall ensure that all employees, who may cause such a discharge to occur, are advised of the emergency notification procedure. (h) Reports from unpermitted users. (1) Any industrial user of the POTW shall be required within 30 days of request from the general manager to answer and reply to a sewer quality questionnaire form (Form 15: Preliminary Investigation Report for Potential Industrial Users) as promulgated by the control authority. The purposes of the requirement for the form shall be to determine the quality of the sewer effluent being discharged from any such user into the POTW for determination of compliance with the provisions of this division or for a determination of whether pretreatment approval should be requested from the general manager. (2) Should any user fail to reply in a satisfactory fashion to the questionnaire, such failure to respond shall be considered a violation of the provisions of this division and subject any such person to the enforcement provisions of this division. The request to answer such questionnaire from the general manager shall be evidenced by the deposit of such questionnaire to the user at its billing address as shown on the records of the public utility. (3) In addition to the enforcement provisions as provided for in this division, the general manager, upon failure of any user to satisfactorily answer the questionnaire as provided in this section, may cause the waste being discharged from such user to be tested and the costs therefore shall then be payable by the user to the city. Should such user fail to pay such costs upon 30-days' notice from the city, this shall be considered as a failure to pay a city utility bill and utility service may be cut off by the city upon the failure to make such payment. (i) Notice of violation/repeat sampling and reporting. Pursuant to 40 CFR, Part 403.12 (g)(2), if sampling performed by a user indicates a violation, the user must notify the control authority within 24 hours of becoming aware of the violation. The user shall also repeat the sampling and analysis and submit the results of the repeat analysis to the control authority within 30 days after becoming aware of the violation, unless the control authority informs the user otherwise. The user is not required to resample if the control authority monitors at the user's facility at least once a month, or if the control authority samples between the user's initial sampling and when the user receives the results of this sampling. (1) Where the control authority has performed the sampling and analysis in lieu of the industrial user, the control authority must perform the repeat sampling and analysis unless it notifies the user of the violation and requires the user to perform the repeat analysis. Re-sampling is not required if: a. The control authority performs sampling at the industrial user at a frequency of at least once per month; or b. The control authority performs sampling at the user between the time when the initial sampling was conducted and the time when the user or the control authority receives the results of this sampling. (j) Notification of the discharge of hazardous waste. (1) Any user who commences the discharge of hazardous waste shall notify the POTW, the EPA Regional Waste Management Division Director, and state hazardous waste authorities, in writing, of any discharge into the POTW of a substance which, if otherwise disposed of, would be a hazardous waste under 40 CFR Part 261. Such notification must include the name of the hazardous waste as set forth in 40 CFR Part 261, the EPA hazardous waste number, and the type of discharge (continuous, batch, or other). The notification must take place no later than 180 days after the discharge and in accordance with other requirements in 40 CFR 403.12 (p). (2) This provision does not create a right to discharge any substance not otherwise permitted to be discharged by this division, a permit issued thereunder, or any applicable federal or state law. (k) Analytical requirements. All pollutant analyses, including sampling techniques, to be submitted as part of a wastewater discharge permit application or report shall be performed in accordance with the techniques prescribed in 40 CFR Part 136, unless otherwise specified in an applicable categorical pretreatment standard. If 40 CFR Part 136 does not contain sampling or analytical techniques for the pollutant in question, or where the EPA determines that the Part 136 sampling and analytical techniques are inappropriate for the pollutant in question, sampling and analyses shall be performed by using validated analytical methods or any other applicable sampling and analytical procedures, including procedures suggested by the general manager or other parties approved by EPA. The laboratories used by the industrial users must be accredited according to 30 TAC Part 1 Chapter 25 Subchapter A. (l) Sample collection. Samples collected to satisfy reporting requirements must be based on data obtained through appropriate sampling and analysis performed during the period covered by the report, based on data that is representative of conditions occurring during the reporting period. (1) Except as indicated in subsection (l), (2) and (3) below, the user must collect wastewater samples using 24-hour flow-proportional composite sampling techniques, unless time-proportional composite sampling or grab sampling is authorized by the general manager. Where time-proportional composite sampling or grab sampling is authorized by the control authority, the samples must be representative of the discharge. Using protocols (including appropriate preservation) specified in 40 CFR Part 136 and appropriate EPA guidance, multiple grab samples collected during a 24-hour period may be composited prior to the analysis as follows: for cyanide, total phenols, and sulfides the samples may be composited in the laboratory or in the field; for volatile organics and oil and grease, the samples may be composited in the laboratory. Composite samples for other parameters unaffected by the compositing procedures as documented in approved EPA methodologies may be authorized by the control authority, as appropriate. In addition, grab samples may be required to show compliance with instantaneous limits. (2) Samples for oil and grease, temperature, pH, cyanide, total phenols, sulfides, and volatile organic compounds must be obtained using grab collection techniques. (3) For sampling required in support of baseline monitoring and 90-day compliance reports required in subsections (b) and (d) of this section [40 CFR 403.12(b) and (d)], a minimum of four grab samples must be used for pH, cyanide, total phenols, oil and grease, sulfide and volatile organic compounds for facilities for which historical sampling data do not exist; for facilities for which historical sampling data are available, the general manager may authorize a lower minimum. For the reports required by subsection (e) of this section (40 CFR 403.12(e) and 403.12(h)), the industrial user is required to collect the number of grab samples necessary to assess and assure compliance by with applicable pretreatment standards and requirements. (4) Industrial users can split the samples collected by the control authority for their own analysis. Industrial users shall follow approved sampling and analysis procedures as listed in 40 CFR Part 136. However the results of the sample analyzed by the control authority will supersede as long as appropriate QA/QC procedures were followed. (5) Sampling must be taken within 24-hour period, however, the sample should only be collected during the portion of the 24-hour period that the user is discharging form the regulated process and/or pretreatment unit (as long as regulated process wastewater is flowing through the pretreatment unit). During parts of the day when there is no discharge of process wastewater, standing water shall not be disproportionately sampled and analyzed as it would not be representative of the discharge. The control authority will require documentation of the site-specific circumstances to allow any alternate sampling techniques that are representative of the discharge. (m) Timing. Written reports will be deemed to have been submitted on the date postmarked. For reports which are not mailed, postage prepaid, into a mail facility serviced by the United States Postal Service, the date of receipt of the report shall govern. (n) Record keeping. Industrial users subject to the reporting requirements of this section (106-186) shall retain these reports and the information resulting from any required monitoring activities for a minimum of three years. Records shall include the date, exact place, method, and time of sampling, and the name of the person(s) taking the samples; the dates analyses were performed; who performed the analyses; the analytical techniques or methods used; and the results of such analyses. These records shall remain available to the control authority for a period of at least three years, for inspection and copying. This period shall be automatically extended for the duration of any litigation concerning the user or the city, or where the user has been specifically notified of a longer retention period by the control authority.
( Ordinance 2010-32 , § I, adopted 5/24/2010 ; Ordinance 2020-04 , § I, adopted 1/27/2020 )
Ask a question about McAllen law
Corpus searches the McAllen sections it holds and shows the ones that match, with their citations. Free, no sign-in.