For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 94-33 — Registration and construction permits

Code of Ordinances, City of McAllen, Texas (through Ord. 2026-83 adopted 2026-08-24) · McAllen Code of Ordinances § 94-33

Corpus is an independent public-information project, not the official City of McAllen website. Stable reference: corpuslaw.us/code/4e446327-80d2-48a5-847b-9ea5f14b33cb

§ 94-33: Registration and construction permits.

(a) Registration certificate. In order to protect the public health, safety and welfare, all public utility installation constructors, including public utility companies and all other users using or desiring to use the rights-of-way of city must register with the city. Registration and permits will be issued in the name of the person who will own the facilities. Registration shall include: (1) The name of the ultimate user of the right-of-way; (2) The name, address and telephone number of the person or persons who will be contact person(s) for the installer and owner of the public utility facility user; (3) The name, address and telephone number of any contractor or subcontractor who will be working in the right-of-way on behalf of the user, to the extent such information is known and available at the time of registration and, if not known at that time, said information shall be provided as soon as practical following registration; (4) The name(s) and telephone number of an emergency contact who shall be available 24 hours a day. (b) Construction permits. (1) No person, entity, user or proposed user shall perform any construction or installation of facilities in the rights-of-way without first obtaining a construction permit, except as provided herein, if such construction or installation will require the breaking of pavement and/or the closure of a traffic lane for a period of time greater than four hours. For purposes of this subsection, the phrase "construction or installation of facilities" does not include the installation of facilities necessary to initiate service to a customer's property or the repair or maintenance of existing facilities, unless such repair or maintenance requires the breaking of pavement or the closure of a traffic lane for a period of time greater than four hours. a. Emergency responses related to the repair or replacement of existing facilities or the restoration of existing utility service to customers that would otherwise require a permit but for the emergency nature of that work may be undertaken without first obtaining a permit; however, the city's engineering department should be notified, verbally or in writing, as soon as possible after receipt of notice of the emergency, additionally, the user should provide a reasonably detailed description of the work performed in the right-of-way before the close of business the next business day following any construction related to an emergency response, such description to include a reasonably detailed description of the work performed in the right-of-way. An updated map of any facilities that were moved, repaired or constructed shall be submitted to the city within 60 days following such emergency work. (2) The permit shall state to whom it is issued, location of work, location of facilities, and estimated dates and times work is to take place and any other special, reasonable conditions set out by the city engineer or his/her designee. (3) The person requesting a permit will provide the city engineer or his/her designee with the following: a. The proposed, approximate location and route of all facilities to be constructed or installed and the applicant's plan for right-of-way construction; b. Engineering plans which will be on a scale acceptable to the city engineering department, but in no event larger than one inch equals 50 feet unless otherwise approved by the engineering department; c. Description of the location of all right-of-way and utility easements which applicant plans to use; d. Description of all known existing public utilities in the area of applicant's proposed route; e. Detail of what applicant proposes to install, such as pipe size, number of interducts, valves, etc.; f. Detail of plans to remove and replace asphalt, concrete in street to City of McAllen standards; g. Drawings of any bores, trenches, handholes, manholes, switch gear, transformers, pedestals, etc., including depth; h. Handhole and/or manhole typical of type of manholes and/or handholes applicant plans to use or access; i. Complete legend of drawings submitted by applicant which may be provided by reference to previously submitted documents; j. Four sets of engineering plans; k. If known at the time application is made, and if not, within a reasonable time thereafter and not later than 24 hours prior to the start of construction, the name, address and telephone numbers of the contractor who will perform the actual construction, including the name and telephone number of an individual with the contractor who will be available at all times during construction; provided, however, that such information will not be necessary to make the application administratively complete. l. The construction and installation methods to be employed for the protection of existing structures, fixtures, and facilities within or adjacent to the right-of-way, and the estimated dates and times work will occur, all of which (methods, dates, times, etc.) are subject to approval of the city engineer or his/her designee; and m. Proof of insurance or net worth as required. n. A nonrefundable application fee of $350.00, unless the applicant has an existing franchise or other contractual agreement that establishes the fee to be paid for the use of the city's rights-of-way or is otherwise exempt from the payment of such fee by applicable law. The permit application must also be signed by a representative of the owner of the facilities to be constructed. Upon the receipt of all necessary information and necessary documentation the city engineer may issue the permit; provided, however, the city specifically reserves the right to deny access to any user where, in the judgment of the city, the use or proposed use of the rights-of-way are inconsistent with and/or unreasonably impair the public use of the rights-of-way. In the event that the city engineer denies any permit, the applicant will be informed of the basis for such denial and, if applicable, the conditions under which the work might be permitted. (4) All construction and installation in the right-of-way shall be in accordance with the permit for the facilities. The city engineer or his/her designee shall be provided access to the work and to such further information as he or she may reasonably require to ensure compliance with the permit. (5) A copy of the construction permit and approved engineering plans shall be maintained at the construction site and made available for inspection by the city engineer or his/her designee at all times when construction or installation work is occurring. (6) All construction or installation work authorized by permit must be completed in the time specified in the construction permit. If the work cannot be completed in the specified time periods, the permittee may request an extension from the city engineer or his/her designee. The request for extension should be submitted to the city engineer prior to the expiration of the specified time period and, if such extension is so requested, construction or installation work authorized by the initial permit may be continued during the time period that the city engineer is considering the request for an extension. (7) Insurance and bonds. a. An applicant must provide proof of liability insurance in the amount of $1,000,000.00 as approved by the city's legal department. Such requirements may be waived by the city engineer or his/her designee, if the applicant provides acceptable evidence of self-insurance backed by assets equal to but not less than a net worth in the amount of at least $1,000,000.00 as approved by the city engineer or his/her designee and the director of financial services or his/her designee. b. The coverage must be on an "occurrence" basis and must include coverage for personal injury, contractual liability, premises liability, medical damages, underground, explosion and collapse hazards. c. Each policy must include a cancellation provision in which the insurance company is required to notify the city in writing not fewer than 30 days before canceling, refusing to renew, or reducing policy limits. d. The applicant shall file the required original certificate of insurance prior to any commencement of work. The certificate shall state the policy number; name of insurance company, name and address of the agent or authorized representative of the insurance company; name, address and telephone number of the insured; policy expiration date; and specific coverage amounts. e. Applicant shall file a surety bond from a surety company authorized to do business in the State of Texas in the amount of $15,000.00 to guarantee the restoration of the right-of-way in the event the applicant leaves a job site in the right-of-way unfinished, incomplete, unsafe or otherwise not restored according to city specifications, unless the applicant has an existing franchise or other contractual agreement that establishes the fee to be paid by the user for the use of the city's rights-of-way or is otherwise exempt from the payment of such a surety by applicable law. This requirement may be waived or modified upon a showing of good cause. Such good cause may include, but is not necessarily limited to, a showing of sufficient financial responsibility to adequately protect the city in an amount at least equal to the bond requirement. (8) A request for a permit must be submitted at least seven working days before the commencement of work proposed in the request, unless waived by the city engineer or his/her designee or exempted pursuant to subsection (b)(1)a. of this section for emergency responses. (9) Request for permits will be approved or disapproved by the city engineer or his/her designee within a reasonable time of receiving all the necessary information. The city engineer or his/her designee will use his/her best efforts to approve or disapprove a request for permit as soon as possible. Should a user need expedited approval of a permit, that fact should be made known to the city engineer at the time the request for permit is filed with the city. (10) The engineering department may require a pre-construction meeting with the permittee and their construction contractor.

( Ordinance 2002-03 , § 1, adopted 1/14/2002 )

Ask a question about McAllen law

Corpus searches the McAllen sections it holds and shows the ones that match, with their citations. Free, no sign-in.