§ 94-34: Construction standards.

(a) For any work requiring the issuance of a permit, the engineering department must be notified 24 hours in advance that construction is ready to proceed by either the right-of-way user, their contractor or representative. (b) All construction shall be in conformance with all city codes and applicable local, state and federal laws. (c) For any work requiring the issuance of a permit, three feet by three feet informational signs stating the identify of the person doing the work, telephone number and permittee's identity and telephone number shall be placed at the location where construction is to occur 24 hours prior to the beginning of work in the right-of-way and shall continue to be posted at the location during the entire time the work is occurring. (d) Erosion control measure (i.e. silt fence) and advance warning signs, markers, cones and barricades must be in place before work begins. Plans must be approved at least 24 hours prior to construction. (e) Permittee may be required to show proof of EPA approved plans relating to stormwater and erosion when applicable or a letter stating they are not required to obtain such plans. (f) Except for emergency responses described in subsection (b)(1)a. of section 94-33, no lane closure on major thoroughfares will be allowed between 7:30 a.m. and 5:30 p.m. unless the engineering department grants prior approval. Arrow boards will be required on lane closures, with all barricades, advance warning signs and 36-inch reflector cones placed according to the specifications of the engineering department. (g) Without affecting the legal relationship between a permittee and it's contractors, permittees are responsible for the workmanship and any damages by all contractors or subcontractors. A responsible representative of the permittee will be available to the engineering department at all times during construction. (h) Permittee shall be responsible for stormwater management erosion control that complies with city, state and federal guidelines. Requirements shall include, but not be limited to, silt fencing around any excavation that will be left overnight, silt fencing in erosion areas until reasonable vegetation is established, barricade fencing around open holes, and high erosion areas will require wire-backed silt fencing. (i) Permittee or contractor or subcontractor will notify the engineering department and the effected utility immediately of any damage to other utilities, either city or privately owned. (j) Except as otherwise required by an emergency situation or condition, when a street or sidewalk cut is required, prior approval must be obtained from the engineering department and all requirements of the engineering department shall be followed. Repair of all street and sidewalk removals must be made promptly to avoid safety hazards to vehicle and pedestrian traffic. Trench plates may be required by the engineering department. (k) Newly installed facilities must not interfere with other existing public utilities, in particular gravity-dependent facilities. (l) Underground utilities must be installed at a minimum depths as specified by the engineering department, which minimum depth shall be consistent with applicable laws, rules, regulations and other safety codes. (m) The permittee will be responsible for verifying the location both horizontal and vertical of all potentially affected facilities prior to any excavation or boring. All directional boring shall have locator place bore marks and depths while bore is in progress. Locator shall place mark at each stem with paint dot and depth at least every other stem. (n) Except for emergency responses described in subsection (b)(1)a. of this section, the working hours in the rights-of-way shall be 7:00 a.m. to 7:00 p.m., Monday through Friday. Work that needs to be performed during hours other than those set out above shall be performed only with the approval of the city engineering department which approval shall not be unreasonably withheld. Requests to perform work outside the above-described working hours should be, to the extent reasonably possible, requested least 24 hours in advance. Any inspections outside the hours described above shall be at the expense of the permittee. (o) Contractors working for permittee are responsible for obtaining line locates from all affected public utilities prior to any excavation. (p) Placement of all manholes and/or manholes must be approved in advance by the engineering department. (q) Unless otherwise required by law, no underground installation or other work activities may be initiated when it is reasonably foreseeable that weather conditions will prohibit proper restoration of disturbed areas in a timely manner. The city engineer or his/her designee may waive the preceding requirement on a case by case basis, with conditions appropriate to the circumstances. (r) While any portion of the streets or public ways are open, reasonable barriers, lights at night and other warnings shall be utilized for the safety of the users of the streets or public ways in compliance with applicable government regulations requiring and pertaining to such barriers or as reasonably requested by the city engineer or his/her designee. (s) For all work in the streets or public ways which may disturb the normal flow of vehicular or pedestrian traffic, roadway closure or partial closure practices, as delineated in the Texas Manual of Uniform Traffic Control Devices or comparable manual and in the standards established by the city engineer or his/her designee shall be used and an alternate traffic routing plan shall be submitted to the engineering department prior to change in traffic flow. (t) With the prior approval of the engineering department, users of the rights-of-way may trim trees upon and overhanging the streets so as to prevent the branches of such trees from coming into contact with facilities. No trimming shall be performed in the streets or public ways without previously informing the engineering department. Except in emergencies all trimming of trees on public property shall have the advance approval of the city engineer or his/her designee and all trimming of trees on private property shall require notice to the property owner. Users of the public rights-of-way shall use reasonable efforts to avoid or minimize the disturbance of trees, shrubs, and ground cover properly within the public rights-of-way. (u) Throughout the period of construction or reconstruction, the city shall be given notice a reasonable time before the commencement of construction or reconstruction in any block (meaning an area typically bounded by four streets) preferably not less than three business days before such commencement. The city shall be given a monthly estimated schedule of construction or reconstruction areas and planned street disturbances. (v) All users of the public's rights-of-way shall endeavor to provide advance notice, appropriate to the circumstances, prior to entry whenever desiring to enter or cross any private property within the city or work in abutting streets or rights-of-ways. Work performed in an emergency in easements or rights-of-way is exempted from this subsection.

( Ordinance 2002-03 , § 1, adopted 1/14/2002 )