For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 110-281 — Bypass

Code of Ordinances of the City of McKinney, Texas (Codified through Ordinance No. 2022-12-145, enacted December 20, 2022 (Supp. No. 37 archive; publisher-stale)) · McKinney Code of Ordinances § 110-281

Corpus is an independent public-information project, not the official City of McKinney website. Stable reference: corpuslaw.us/code/7d8b2b84-fd10-4e21-b401-8aca3f8c1d64

Sec. 110-281. - Bypass.

(a) Permitted bypasses. An industrial user may allow any bypass to occur which does not cause pretreatment standards or requirements to be violated, but only if it also is for essential maintenance to ensure efficient operation. These bypasses are not subject to the provisions of subsections (b) and (c) of this section. (b) Notice. (1) If an industrial user knows in advance of the need for a bypass, it shall submit prior notice to the control authority, if possible at least ten days before the date of the bypass. (2) An industrial user shall submit oral notice of an unanticipated bypass that exceeds applicable pretreatment standards to the control authority within 24 hours from the time the industrial user becomes aware of the bypass. A written submission shall also be provided within five days of the time the industrial user becomes aware of the bypass. The written submission shall contain a description of the bypass and its cause; the duration of the bypass, including exact dates and times, and, if the bypass has not been corrected, the anticipated time it is expected to continue; and steps taken or planned to reduce, eliminate, and prevent reoccurrence of the bypass. The control authority may waive the written report on a case-by-case basis if the oral report has been received within 24 hours. (c) Prohibition of bypass. (1) Bypass is prohibited and the control authority may take enforcement action against an industrial user for a bypass, unless: a. Bypass was unavoidable to prevent loss of life, personal injury or severe property damage; b. There were no feasible alternatives to the bypass, such as the use of auxiliary treatment facilities, retention of untreated wastes, or maintenance during normal periods of equipment down time. This condition is not satisfied if adequate back-up equipment should have been installed in the exercise of reasonable engineering judgment to prevent a bypass which occurred during normal periods of equipment downtime or preventative maintenance; and c. The industrial user submitted notices as required under subsection (b) of this section. (2) The control authority may approve an anticipated bypass, after considering its adverse effects, if the control authority determines that it will meet the three conditions in subsection (c)(1) of this section.

(Code 1982, § 31-143; Ord. No. 92-07-19, § 28, 7-7-1992)

Ask a question about McKinney law

Corpus searches the McKinney sections it holds and shows the ones that match, with their citations. Free, no sign-in.