§ 90-307 — Permitted use; application and fees
Code of Ordinances of the City of McKinney, Texas (Codified through Ordinance No. 2022-12-145, enacted December 20, 2022 (Supp. No. 37 archive; publisher-stale)) · McKinney Code of Ordinances § 90-307
Corpus is an independent public-information project, not the official City of McKinney website. Stable reference: corpuslaw.us/code/3fd3535e-48d9-4457-95e0-5c74de92401f
Sec. 90-307. - Permitted use; application and fees.
(a) Permitted use. Collocation of network nodes, and the placement of transport facilities and node support poles, meeting the parameters set forth in section 90309 below and in applicable law, shall be a permitted use. No zoning or land use review shall apply, subject to the requirements in section 90-309. (b) Permit required. No person shall place a network node, transport facility, or node support pole in the public right-of-way, without first filing a permit application and obtaining a permit therefore, except as otherwise provided in this article. (c) Permit application. All permit applications filed pursuant to this article shall be on a form, paper or electronic, provided by the city. The applicant may designate portions of its application materials that it reasonably believes contain proprietary or confidential information as "proprietary" or "confidential" by clearly marking each page of such materials accordingly. (d) Application requirements. The permit application shall be made by the network provider or its duly authorized representative and shall contain the following: (1) The applicant's name, address, telephone number, e-mail address, and signatures. (2) The names, addresses, telephone numbers, and e-mail addresses of all consultants, if any, acting on behalf of the applicant with respect to the filing of the application. (3) The applicant shall disclose if the applicant proposes that the facilities will be located in: a historic district; within 300 feet of public art; near a historic site, or a structure or landmark recognized as historic by the city, state or federal government; within a municipal park; within a residential district; or in an area that has undergrounding requirements. (4) The applicant shall provide detailed drawings in an electronic form and format acceptable to the city, with calculations and dimensions that show strict conformity to the size, distance and spacing limitations in this article. (5) The applicant requesting a permit shall provide the city with documentation in the format specified by the city. (6) The applicant shall provide analysis indicating that the proposed facilities will not cause any interference with city public safety radio system, traffic signal light system, or other city safety communications components, and city SCADA systems. (7) The applicant must provide the specific address for all facilities that will be located on a pole. Addresses are determined by the city. The applicant shall provide a dated aerial photograph of the overall site depicting the site's relation to major streets and highways and poles. For any application requesting a new pole, photos are required showing the before and after conditions. (8) The applicant must ascertain, in consultation with the city, whether any other authorizations from the city will be required in order for the proposed installation to be made and completed. For all applications for the installation or construction of wireless facilities, including network nodes and node support poles, if any such additional authorizations are required, the applicant is responsible for providing all of the information necessary for the city to review and act on the additional authorizations. Such additional authorizations that must be included with the application shall include, but not be limited to, executed agreement(s) with the city for attachment to service poles. (9) A site specific non-ionizing electromagnetic radiation (NIER) report for the network node equipment type and model being installed at the site that is endorsed by a radiofrequency engineer licensed in the State of Texas, including a certification that the network node complies with all radiation and electromagnetic standards shall be submitted to the city within 90 days after installation of the facilities. The report shall specify approach distances to the general public and occupational workers at the ground and antenna centerline levels. The report shall include instructions regarding powering off the equipment or contact information for a person who can power off the equipment. No significant changes to the power, location, RF emission patterns and/or emitting frequencies may be made without prior notification and approval by the city. However, non-substantive changes, for example, in-kind replacements of transmitters of the same frequency, radiation patterns and power are permitted. The city retains the right to independently verify the RF patterns as installed. (10) Completeness. The application is not complete unless it contains all information required by this section, requested on the application form, and required by any supplemental list of required documentation provided by the city with the application form. (e) Exceptions. (1) No application, permit or fee is required of network providers for: a. Routine maintenance that does not require excavation or the closing of all or part of any sidewalks or vehicular lanes in a public right-of-way; b. Replacing or upgrading facilities that are substantially similar in size or smaller; and that do not require excavation or the closing of all or part of any sidewalks or vehicular lanes in a public right-of-way; or c. The installation, placement, maintenance, operation, or replacement of micro network nodes or similar structures that are strung on cables between existing poles or node support poles, in compliance with the National Electric Safety Code. If, however, traffic will be affected by the installation, placement, maintenance or replacement of a micro network node or similar structure, a traffic control plan is required. (2) Substantially similar shall mean all of the following, collectively: a. The new or upgraded facility, including the antenna or other equipment element, will not be more than ten percent larger than the existing facility and does not result in the node exceeding the size limitations in section 90-309; or the extension of facilities less than six feet from a tower; or the new or upgraded pole will not be more than ten percent higher than the existing pole, provided that the increase may not result in the pole exceeding the applicable height limitations prescribed by this article and V.T.C.A., Local Government Code ch. 284, as may be further amended; or, increasing the size of ground equipment cabinets by ten percent in height or volume; and b. The replacement or upgrade does not include replacement of an existing pole; and c. The replacement or upgrade does not defeat existing concealment elements of a pole; and d. The determination of whether a replacement or upgrade is substantially similar is made by measuring from the dimensions of the facilities as approved by the city. (3) Although no application, permit or fee is required, the city requires advance notice of the work described above and approval of the pole's owner for that specific address. Work under this section must still meet all other requirements in this article. (f) Information updates. Any amendment to information contained in a permit application shall be submitted in writing to the city within 30 days after the change necessitating the amendment. (g) Application fees. (1) Network node. Payment: (i) of not less than the one-time fee as specified in appendix A of the Code of Ordinances, which amount may be amended from time to time by ordinance, for a single up-front application that includes up to, but not more than, five network nodes, with an additional fee as specified in appendix A of the Code of Ordinances, which amount may be amended from time to time by ordinance, for each additional network node beyond five; or (ii) a fee established by the city based on the city's actual, direct and reasonable costs incurred in granting or processing an application as specified in appendix A of the Code of Ordinances, which amount may be amended from time to time by ordinance; or (iii) a fee agreed upon by the city and a permittee in a master agreement. (2) Node support pole. Payment: (i) of not less than a one-time fee as specified in appendix A of the Code of Ordinances, which amount may be amended from time to time by ordinance, for each node support pole addressed in an application that includes a new pole; or (ii) a fee established by the city based on the city's actual, direct and reasonable costs incurred in granting or processing an application as specified in appendix A of the Code of Ordinances, which amount may be amended from time to time by ordinance; or (iii) a fee agreed upon by the city and a permittee in a master agreement. (3) The City of McKinney reserves the right to require an applicant to pay the fees and costs of any consultant retained by the city to assist in the review of plans, applications, reports, inspections, and/or testing. (h) Design manual. In addition to the application requirements above, the application must conform with the design guideline requirements as specified in the city's small wireless facilities design manual, as amended, and are incorporated herein by this reference.
(Ord. No. 2020-07-051, § 3, 7-21-2020)
Ask a question about McKinney law
Corpus searches the McKinney sections it holds and shows the ones that match, with their citations. Free, no sign-in.
