For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 90-309 — Network nodes in the public right-of-way; maximum height; other requirements

Code of Ordinances of the City of McKinney, Texas (Codified through Ordinance No. 2022-12-145, enacted December 20, 2022 (Supp. No. 37 archive; publisher-stale)) · McKinney Code of Ordinances § 90-309

Corpus is an independent public-information project, not the official City of McKinney website. Stable reference: corpuslaw.us/code/252101d6-34b3-44a1-ad6c-7d041529b1be

Sec. 90-309. - Network nodes in the public right-of-way; maximum height; other requirements.

(a) Maximum size of permitted use. Permitted use network nodes, including without limitation, network nodes, transport facilities, or node support poles in the public right-of-way shall be subject to the following size limitations: (1) Each antenna that does not have exposed elements and is attached to an existing structure or pole: a. Must be located inside an enclosure of not more than six cubic feet in volume; b. May not exceed a height of three feet above the existing structure or pole; and c. May not protrude from the outer circumference of the existing structure or pole by more than two feet; (2) If an antenna has exposed elements and is attached to an existing structure or pole, the antenna and all of the antenna's exposed elements: a. Must fit within an imaginary enclosure of not more than six cubic feet; b. May not exceed a height of three feet above the existing structure or pole; and c. May not protrude from the outer circumference of the existing structure or pole by more than two feet; d. Must be mounted flush with the pole near the top; (3) The cumulative size of other wireless equipment associated with the network node attached to an existing structure or pole may not: a. Be more than 28 cubic feet in volume; or b. Protrude from the outer circumference of the existing structure or pole by more than two feet; c. Attachments on all poles shall be at least 12 feet above grade, and if a network node attachment is projecting toward the street, the attachment shall be installed no less than 16 feet above the ground. (4) Ground-based enclosures, separate from the pole, may not be higher than three feet six inches from grade, wider than three feet six inches, or deeper than three feet six inches; (5) Pole-mounted enclosures may not be taller than five feet; and (6) The following types of associated ancillary equipment are not included in the calculation of equipment volume: a. Electric meters; b. Concealment elements; c. Telecommunications demarcation boxes; d. Ground equipment; e. Power transfer switches; f. Cut-off switches; and g. Vertical cable runs for the connection of power and other services. (7) Equipment attached to node support poles may not protrude from the outer edge of the node support pole by more than two feet; (8) Equipment attached to a utility pole must be installed in accordance with the National Electrical Safety Code, subject to applicable codes, and the utility pole owner's construction standards; (9) A network provider shall ensure that each new, modified, or replacement utility pole or node support pole installed in a public right-of-way in relation to which the network provider received approval of a permit application does not exceed the lesser of: a. Ten feet in height above the tallest existing utility pole located within 500 linear feet of the new pole in the same public right-of-way; b. Or 55 feet above ground level. (10) A network provider shall comply with all applicable FCC, state, and local codes, provisions, or regulations that concern public safety. Network node facilities must not result in human exposure to radio frequency radiation in excess of applicable safety standards specified in 47 CFR § 1.1307(b), or as specifically amended by the FCC. After transmitter and antenna system optimization, but prior to unattended operations of the facility, the wireless provider or its representative must conduct on-site post-installation RF emissions testing to demonstrate actual compliance with the FCC OET Bulletin 65 RF emissions safety rules for general population/uncontrolled RF exposure in all sectors. For this testing, the transmitter shall be operating at maximum operating power, and the testing shall occur outwards to a distance where the RF emissions no longer exceed the uncontrolled/general population limit. The wireless provider or its representative shall submit documentation of this testing to the city within 90 days after installation of the facility. The wireless provider or its representative shall also conduct RF emissions testing annually and submit documentation of this testing to the city. In addition, the city retains the right to independently verify the RF emissions testing; (11) Exceptions. A network provider may construct, modify, or maintain in a public right-of-way a network node or node support pole that exceeds the height or distance limitations prescribed by this article only if the city approves the construction, modification, or maintenance of such network node or node support pole subject to all applicable zoning or land use regulations and applicable codes. (b) Undergrounding provisions. A network provider shall comply with nondiscriminatory undergrounding requirements, including city ordinances, zoning regulations, state law, private deed restrictions, and other public or private restrictions, that prohibit installing aboveground structures in a public right-of-way without first obtaining zoning or land use approval. This requirement or restriction shall not be interpreted to prohibit a network provider from replacing an existing structure. (c) Concealment. Facilities shall be concealed or enclosed as much as reasonably possible in an equipment box, cabinet, or other unit that may include ventilation openings. External cables and wires hanging off a pole shall be sheathed or enclosed in a conduit, so that wires are protected and are either not visible or visually minimized. Guy wires, anchors, pedestals, boxes, and other above grade facilities shall not fully or partially encroach within, over or above a sidewalk area. (d) Historic areas and historic districts. Stealth or concealment of facilities and poles shall be required by the city in historic districts, and within 300 feet of a historic site or structure or historic landmark recognized by the city, state or federal government. Subject to the permit application approval time frames in section 90-308, a network provider must obtain advance approval from the city before collocating new network nodes or installing new node support poles in any areas zoned or designated as a historic district. Such installations shall be subject to the design and aesthetic standards of such areas. (e) Design districts, and regional employment centers. Stealth or concealment of facilities and poles shall be required by the city in design districts and regional employment centers. Subject to the permit application approval time frames in section 90-308, a network provider must obtain advance approval from the city before collocating new network nodes or installing new node support poles in any areas zoned or designated as a design district or regional employment center. Such installations shall be subject to the design and aesthetic standards of such areas. (f) Installation in parks and residential areas. A network provider may not install a new node support pole in a public right-of-way without the city's discretionary, nondiscriminatory, written consent of the director of the city department of public works or his or her respective designated representative, if the public right-of-way is located in a park or is adjacent to a street or thoroughfare that is 1) not more than 50 feet wide; and 2) adjacent to single family residential lots or other multifamily residences or undeveloped land that is designated for residential use by zoning or deed restrictions. A network provider shall comply with private deed restrictions and other private restrictions when installing network nodes in parks and residential areas. It is specifically understood and agreed that a network provider generally is not allowed or authorized to install network nodes in public parks. In addition, a network provider is prohibited from installing a network node on an existing pole in a public right-of-way without written consent from the city council if the public right-of-way is located in or adjacent to a street or thoroughfare that is adjacent to a public park or single family residential lots or other multifamily residences or undeveloped land that is designated for residential use by zoning or deed restrictions. A network provider installing a network node or a node support pole in a public right-of-way shall also comply with private deed restrictions and other private restrictions in the area that apply to those facilities. (g) Zoning. A network provider seeking to construct, replace or modify a pole or node in the public right-of-way that exceeds the height or size limits contained in this section, shall be subject to applicable zoning requirements.

(Ord. No. 2020-07-051, § 3, 7-21-2020)

Ask a question about McKinney law

Corpus searches the McKinney sections it holds and shows the ones that match, with their citations. Free, no sign-in.