§ 1.602 — Permitted temporary uses and structures
Code of the City of Mesquite, Texas (Supp. No. 71: codified through Ordinance No. 5259, enacted July 20, 2026) · Mesquite City Code, App. C, pt. 1, § 1.602
Corpus is an independent public-information project, not the official City of Mesquite website. Stable reference: corpuslaw.us/code/fe6fffb0-1282-4221-a12d-80776305ba92
1.602 - Permitted temporary uses and structures.
A. Temporary construction office. The location of a temporary office may be permitted on a site for which a building permit has been issued. Such office permit may be issued for no more than one (1) year, but may be extended if the builder maintains active and continuous construction on the site. Temporary construction office shall mean office and/or storage space related to construction activities. B. Temporary residential sales office. A residential real estate sales office, located on a platted lot, may be permitted within a subdivision for which building permits have been issued and may be located either in a model home, in a temporary building, or in a portable trailer. Such office permit may be issued for no more than one (1) year, but may be extended if the builder maintains active and continuous construction within the subdivision and a minimum of ten (10) lots in the subdivision remain unsold. Such sales office shall be used for sales in the subject subdivision only and not for sales in any other subdivision. C. Temporary batch plants and temporary material stockpile sites. 1. Permit Required. a. Temporary Use Permit (TUP). (1) A Temporary Use Permit may be issued to a contractor, or other person, for a temporary concrete or asphalt batch plant or for a site to be used to temporarily stockpile material (such as fill material, soil, rock, etc.) when there is active and continuous off-site construction requiring concrete or asphalt. (2) A Temporary Use Permit may only be issued for an initial term of 1-year or less. (3) A Temporary Use Permit is required prior to seeking a Conditional Use Permit. b. Conditional Use Permit (CUP). (1) A Conditional Use Permit may be issued for a temporary concrete or asphalt batch plant or for a site to be used to temporarily stockpile material to be used on another construction site (such as fill material, soil, rock, etc.) when used by a contractor, or other person, for a period of more than 1-year, when there is active and continuous construction requiring concrete or asphalt. (2) A Temporary Use Permit is required prior to seeking a Conditional Use Permit. (3) Conditional Use Permits are granted and regulated in accordance with Section 5.300. 2. Term. a. Temporary Use Permit (TUP)—Term. (1) A Temporary Use Permit may be issued for any specified time period of 1-year or less. (2) An extension to the initial term may be granted by the City Engineer, as long as the initial time period added together with the extension time period is a total term of 18-months or less. b. Conditional Use Permit (CUP)—Term. A Conditional Use Permit may be issued for any term in accordance with Section 5.300. 3. Application. a. Temporary Use Permit (TUP). (1) An initial application for a Temporary Use Permit for a temporary batch plant or a temporary material stockpile site shall be submitted to the Engineering Division, along with the associated fee, and considered by the City Engineer, or his or her designee, for administrative approval. (2) To request an extension, prior to the expiration of the initial term, an application for an extension to the Temporary Use Permit shall be submitted to the Engineering Division, along with the associated fee, and considered by the City Engineer, or his or her designee, for administrative approval. (3) The application for a Temporary Use Permit shall include: (1) a copy of the approved State permit for such operation, (2) truck routes for delivering materials to the batch plant site and delivery of the finished material (concrete or asphalt or stockpiled material) to the construction project site, (3) stormwater pollution prevention plan (SWPPP), (4) dust control measures to be implemented on the site to prevent dust from the site impacting surrounding properties, (5) estimation on the number of truck loads and cubic yards of material that will be delivered to the site and taken from the site to the construction project, (6) listing of the expected time frame the site will be used, and (7) associated application fee. b. Conditional Use Permit (CUP). An application for a Conditional Use Permit for a temporary batch plant or a temporary material stockpile site shall be submitted in accordance with Section 5.300. 4. Fee. Unless otherwise authorized, each application for a Temporary Use Permit, any request for an extension to the initial term, or a Conditional Use Permit must be accompanied by the required fee(s) as set in the City of Mesquite Comprehensive Fee Schedule. 5. Requirements. The following requirements apply to both a Temporary Use Permit and a Conditional Use Permit. a. Distance requirement. Temporary batch plants, including all associated stockpiles and equipment, and temporary material stockpile sites shall be located at least 500 feet from any occupied residential lot, and shall not be used for construction at any other location than the project for which it is permitted. b. Restoration of the site after temporary use is completed. After the temporary use is completed, the sites shall be returned to the original conditions and grades, including restoration of vegetative ground cover. c. Discontinuance of temporary use. The temporary use shall be abandoned or discontinued for a minimum of six (6) months before a new Temporary Use Permit or Conditional Use Permit may be granted. d. Removal of the temporary use after construction project completion. The permitted batch plant or temporary material stockpile site may not remain more than thirty (30) days following the completion of the identified construction project. e. Construction activity limited. The construction activity or project identified for which the Temporary Use Permit or Conditional Use Permit is associated shall be for projects partially or fully within the city limits of Mesquite or a publicly designated regional project, as determined by the City Engineer, or his or her designee. f. Notification by applicant to surrounding area property owners. Prior to approval and issuance of any new Temporary Use Permit, or prior to a public hearing for a new Conditional Use Permit for a temporary batch plant or a temporary material stockpile site, the Applicant shall send notice to all property owners within 1,000 feet of the proposed site. Said notice shall be delivered by U.S. mail and shall include a description of the TUP or CUP being requested, any proposed conditions by City staff, the site location, and the time period for the initial issuance of the TUP or CUP (if applicable). Said notice shall also contain the contact information for City staff, the City Council member in whose district the site is proposed to be located, the Mayor, and the Applicant. Production of the notice, mailing, and the associated costs shall be the responsibility of the Applicant. 6. Action by the City Engineer—Temporary Use Permit. a. The City Engineer, or his or her designee, must evaluate the application for an initial Temporary Use Permit or any application for an extension to the initial term, and other required submittals pursuant to the approval standards of this sub-section and may take any of the following actions regarding the application for the Temporary Use Permit or request for extension: (1) Approval; (2) Approval with modifications; (3) Denial. b. The City Engineer, or his or her designee, may require that the Temporary Use Permit be: (1) Revocable; (2) Effective for a specified time period (but for no more than a 1-year initial term or a total of 18-months or less with an extension); (3) Non-transferable; or (4) Subject to one or more conditions. 7. Approval standards. A permit may be granted for a temporary batch plant or a temporary material stockpile site when the City Engineer, or his or her designee, (in the case of a Temporary Use Permit) or the City Council (in the case of a Conditional Use Permit) finds: a. The City roads to be used to deliver material to the site and take material from the site to the construction project are structurally adequate to accommodate the expected truck traffic from and to the site without significant deterioration; and b. The operation of the temporary batch plant or the temporary stockpile site will not result in the deterioration of public infrastructure; and c. No new public infrastructure or improvements to existing public infrastructure will be required for the operation of the temporary batch plant or temporary material stockpile site; and d. The proposed truck route for the temporary permitted use will generally not utilize local streets; and e. Dust control measures and other measures to minimize health or environmental impacts, based on industry standards, identified in the application are adequate as determined by the City Engineer; and f. In order to grant a Conditional Use Permit (CUP), the City Council shall review and find all of the above and shall also take into consideration the review criteria for a CUP as identified in Section 5.300. D. Temporary outdoor sales. Temporary outdoor sales events may be permitted as set out below. 1. Sidewalk/truckload sales: Special outdoor sales of short duration, such as sidewalk or truckload sales, shall be permitted on the site of a lawful business, by that business or by a nonprofit/charitable organization, provided that no more than four (4) sales of no more than four (4) days each shall be held at a location during a calendar year. No permit shall be required for outdoor sales in accordance with this section, unless compliance with 1.601E regarding use of shared parking is required. 2. Christmas tree sales lots: The outdoor sales of Christmas trees may be permitted for a period of not more than thirty (30) days. The sale of firewood shall be permitted in conjunction with a Christmas tree sales lot. Sales lots located on undeveloped property shall provide adequate off-street parking, loading and electrical connection. Sales lots on developed sites which comply with the requirements for incidental outdoor display shall not require a permit under this section. 3. Other outdoor sales: All other temporary outdoor sales events may be classified as special events and permitted under the regulations set out in Chapter 8, Article XIV, "Special Events and Parades," of the Mesquite City Code, as amended. E. Mobile medical and public health services. Mobile medical and public health services may be permitted when conducted from a self-contained unit, whether a vehicle or trailer, or from a temporary building, if the following criteria are met: 1. Definitions: For the purposes of this Section, the term "mobile medical services" shall mean blood banks, screening for early detection of cancers, or care to the elderly or poor, conducted on a non-profit basis only, but not including veterinary services. The term "public health services" shall mean the provision of out-patient preventive care, diagnosis or treatment of minor medical conditions and auxiliary functions conducted by governmental agencies, but not including hospital trusts or hospital districts, to protect the general health and welfare, or to promote and maintain wellness and readiness of governmental employees and their families. 2. Permits: a. Mobile medical services conducted from a self-contained unit for a period of one (1) week or less at a site shall not require a permit. Permits may be approved for periods exceeding one (1) week, but not exceeding thirty (30) days, at locations within a nonresidential district or at a public facility, such as a school, library, fire station or church in a residential district. Mobile medical services shall not be conducted from a temporary building. b. Public health services conducted from a self-contained unit shall not require a permit. Except in the event of public emergencies, a unit shall not remain at a location for a period exceeding one (1) week. A permit and temporary certificate-of-occupancy may be approved for conducting public health services from a temporary building for up to three (3) years and is subject to renewal upon expiration as provided in this Section. 3. Site requirements for temporary buildings: Temporary buildings for conducting public health services shall be located on public property occupied by a permanent structure with a valid certificate-of-occupancy exclusively for medical purposes. The temporary building and disposition on the site shall comply with applicable codes for setbacks, parking, circulation, electrical and utility connections, accessibility, drainage and fire protection. 4. Exterior appearance: Metal exterior siding shall be prohibited on all facades of a temporary building. A permit and temporary certificate-of-occupancy shall not be renewed after the initial three-year period without complying with ordinances for exterior masonry. In lieu of complying with such ordinances, trees and foundation landscaping shall be installed to break the view of the temporary building from public streets and substantially conceal any skirting at the base of the temporary building. F. Temporary storage vaults. The temporary placement of a storage vault shall be permitted on the site of a lawfully zoned business in any nonresidential zoning district, except the O-Office district, subject to the following conditions and requirements. The permanent placement of storage vaults shall be permitted where their placement is in compliance with the regulations governing outdoor storage. 1. Definition: For the purposes of this section, the term "storage vault" shall mean a vault, unit or device designed and used specifically for storage, which is constructed of solid steel or metal construction and which is no larger than eight and one-half (8½) feet in width, twenty-two (22) feet in length, or nine (9) feet in height. This section shall not authorize the placement of trailers, trailers with wheels removed, export/shipping containers, or any other device designed and/or intended for transportation purposes or any modification of such device. 2. Permits: The following types of temporary permits may be issued for storage vaults as indicated below. No permit is required when such vault complies with the regulations for outdoor storage. a. Sixty-day permits: The building official may issue a total of two (2) sixty-day permits to a business during a calendar year to allow the placement of a storage vault, subject to compliance with the conditions and requirements stated below. Such permits may be combined to create one (1) one hundred twenty-day permit period. b. Construction permit: The building official may issue a permit for the placement of a storage vault upon issuance of a permit for the construction or expansion of a permanent building or a permit for the repair/rehabilitation of a business which has had extensive damage. When a building permit has been issued, the use of a storage vault may be authorized for the period of active construction on the site. 3. Required conditions: Storage vaults permitted pursuant to this section shall comply with the following requirements. a. Location: Storage vaults shall be located in an interior side or rear yard and on an improved surface of concrete or asphalt. No vault shall be permitted in a location which is nearer to a public street than the main building. No vault shall be placed so as to obstruct or eliminate any drive, fire lane, or required parking or loading space. b. Electrical: No electrical connections or any source of energy (such as self-contained power plants/generators) shall be permitted. c. Number: A maximum of one (1) vault per business shall be permitted, except in the following situations where vaults shall be permitted as stated. (1) Shopping centers/multitenant buildings: On a shopping center or multitenant building site, the maximum number of vaults which may be permitted shall be one (1) vault for each twenty-five thousand (25,000) square feet of gross floor area in the shopping center. A vault must be located behind or beside the business for which it is permitted and not behind or beside any other business. (2) Large businesses: Businesses in excess of fifty thousand (50,000) square feet, whether freestanding or located in a shopping center, shall be permitted a maximum of two (2) vaults. 4. Signage: No signage or advertising shall be permitted on a vault other than identification of the leasing firm, limited to name and telephone number, one (1) time per side, using letters no larger than three-inch. 5. Screening: A solid six-foot high wood screening fence shall be provided around the vaults and shall be removed at the end of the permit period. Such screening shall not be required on the side of a vault which is against a building or when the vault is generally not visible from the surrounding streets and parking lots.
(Ord. No. 2654, 2-5-90; Ord. No. 3020, 3-6-95; Ord. No. 3027, § 1, 4-17-95; Ord. No. 4217, § 1, 7-2-12; Ord. No. 4708, § 2(Exh. C(I., II.)), 9-3-19; Ord. No. 4788, § 2(Exh. A), 6-15-20; Ord. No. 5061, § 8(Exh. G), 9-5-23)
Ask a question about Mesquite law
Corpus searches the Mesquite sections it holds and shows the ones that match, with their citations. Free, no sign-in.