For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 1.704 — Other telecommunications facilities - conditional use permit required

Code of the City of Mesquite, Texas (Supp. No. 71: codified through Ordinance No. 5259, enacted July 20, 2026) · Mesquite City Code, App. C, pt. 1, § 1.704

Corpus is an independent public-information project, not the official City of Mesquite website. Stable reference: corpuslaw.us/code/3823e3f6-c23a-46a8-bdbb-6676c675735a

1.704 - Other telecommunications facilities - conditional use permit required.

Any telecommunications facility which does not meet the conditions and requirements of 1.702 or 1.703 may be requested and approved in any zoning district as a conditional use permit subject to the following requirements and considerations. A. General provisions. The following provisions shall govern the approval of conditional use permits for telecommunications facilities. 1. Procedures: Submission, processing and review of requests for approval of a conditional use permit for a telecommunications facility shall be in accordance with 5.300. 2. Conditions of approval: In granting approval of a conditional use permit, the council may impose additional stipulations and conditions to the extent that the council concludes that such conditions are necessary to minimize any adverse effect of the proposed tower on adjoining properties. 3. Modification of standards: All facilities shall comply with the requirements set out in 1.703; provided however, that the city council may approve modification of the locational and development standards as part of the review and approval of a conditional use permit upon a determination that the modified conditions do not create adverse impacts on the adjacent properties. Proposed modification shall be specified in the required notices as part of the requested approval. When modifying such standards the council shall specify the allowed modification in its approval. B. Submission requirements. Application for a conditional use permit for a telecommunications facility shall include the following materials and information. 1. Site plan: A scaled site plan clearly indicating the location, type, and height of the proposed tower, on-site land uses and zoning, adjacent land uses and zoning, adjacent roadways, proposed means of access, setbacks from property lines, elevation drawings of the proposed tower and any other structures, topography, parking, landscaping, and fencing, including locations and materials to be used. 2. Legal description: Legal description of the parent tract and the leased parcel (if applicable). 3. Inventory of existing sites: Each applicant shall provide an inventory of its existing telecommunications facilities or sites approved for facilities, that are either within the City of Mesquite or within ¼ mile of the border thereof, including specific information about the location, height, and design of each tower. The city may share such information with other applicants for the purpose of measuring separations between facilities and for the purpose of encouraging co-location. 4. Setbacks from residential: The setback distance between the proposed tower and the nearest residential district or use. 5. Separation distances: The separation distance from other towers. 6. Compliance: A description of compliance with applicable state and federal laws, including appropriate documentation, if requested. 7. Collocation statement: A notarized statement by the applicant as to whether construction of the tower will accommodate collocation of additional antennas for future users. 8. Unavailable site statement: A statement regarding the efforts to locate a site which complies with the requirements set out in 1.703, and regarding why such sites are not used. 9. Alternatives: A description of the suitability of the use of existing towers, other structures or alterative technology not requiring the use of towers or structures to provide the services to be provided through the use of the proposed new tower. 10. System requirements: A description of the analysis/evaluation of system coverage and/or capacity which necessitates the requested location, generally including propagation or similar maps; and indicating the likely location of known additional towers needed to meet system coverage or capacity needs for the provider. C. Review criteria. In addition to any standards for consideration of conditional use permits pursuant to 5.300, the following factors shall be considered in determining whether to approve a request. 1. Preferred locations: Approval of sites should be considered based on the following preferences regarding location. a. On existing structures such as buildings or other communications towers. b. In locations where the existing topography, vegetation, buildings, or other structures provide the greatest amount of screening. c. In nonresidential districts. d. On towers providing for collocation with multiple users. e. In locations providing the maximum separation distance from residential and the separation distance from residential and the maximum separation between towers. 2. Review items: In reviewing an application for conditional use permit, the following items shall be reviewed as a basis for determining appropriateness and locational preference. a. The height of the proposed tower. b. The proximity to residential districts and uses. c. The nature of uses on adjacent and nearby properties, surrounding topography, and surrounding tree coverage and vegetation. d. The design of the proposed tower characteristics which have the effect of reducing or eliminating visual obtrusiveness, such as monopole construction, neutral colors, screening and buffering. e. The proposed ingress and egress to the site. 3. Availability of alternatives: The applicant shall demonstrate that no reasonable alternative that does not require the use of a new tower or structure can accommodate the proposed antenna. The commission and council may request information necessary to demonstrate that reasonable alternatives do not exist. Information submitted may consist of any of the following: a. No existing towers or structures are located within the geographic area which meets the applicant's engineering requirements. b. Existing towers or structures are not of sufficient height to meet the applicant's engineering requirements; or existing towers or structures do not have sufficient structural strength to support the applicant's proposed antenna and related equipment. c. The applicant's proposed antenna would cause electromagnetic interference with the antenna on the existing towers or structures, or the existing antennas would cause interference with the proposed antenna. d. The fees, costs, or contractual provisions required by the owner in order to share an existing tower or structure or to adapt an existing tower or structure for sharing are unreasonable. Costs exceeding new tower development are presumed to be unreasonable. e. The applicant demonstrates that there are other limiting factors that render existing towers and structures unsuitable.

(Ord. No. 3153, § 1(B), 5-5-97)

Ask a question about Mesquite law

Corpus searches the Mesquite sections it holds and shows the ones that match, with their citations. Free, no sign-in.