For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 11-12-10 — Stormwater requirements for new developments and redevelopments

Municipal Code of the City of Midland, Texas (Supp. No. 1, Update 2: codified through Ordinance No. 10709, enacted February 10, 2026) · Midland Municipal Code § 11-12-10

Corpus is an independent public-information project, not the official City of Midland website. Stable reference: corpuslaw.us/code/72126e4c-ed2d-4d15-9a21-a100e216f6e9

Sec. 11-12-10. - Stormwater requirements for new developments and redevelopments.

(A) The requirements of this Section shall apply to all developments and redevelopments within the corporate limits that are equal to or greater than one acre, unless one of the following exceptions applies to the development or redevelopment: 1. Redevelopment or expansion results in no net increase in impervious area; 2. Development and redevelopment decreases predevelopment runoff volumes as defined in Storm Drainage Design Manual; or 3. Any new development or redevelopment project has or will have permit coverage under the Texas Pollutant Discharge Elimination System Industrial Stormwater Permit issued by the Texas Commission on Environmental Quality (TCEQ). (B) The purpose of this Section is to establish a set of water quality and quantity policies for the regulation of stormwater runoff to minimize increases in stormwater runoff rates and volumes, soil erosion, and nonpoint source pollution. (C) Developers shall follow the standards for stormwater runoff control established in the City of Midland Storm Drainage Design Manual, Midland Master Drainage Plan, applicable procedures in the building regulations and planning and development ordinances. (D) The City of Midland may enforce the provisions of this Section through either the subdivision process or the building permit process, as applicable to the type of project proposed. (E) Maintenance of structural stormwater controls (structural BMPs). Developments that include a structural stormwater control practice, such as a detention basin or other constructed feature intended to provide stormwater runoff quality or quantity improvements, are required to provide for maintenance of the structural practice and for City access for inspection and corrective actions. 1. A drainage and stormwater easement shall be provided by the property owner for facility inspections and maintenance. The easement shall be dedicated to the City of Midland by plat or by separate instrument. This easement shall be in a form approved by the City of Midland, and will be accepted and recorded by the City of Midland in the official records of the county in which the property is located. 2. All structural stormwater controls shall be maintained by the property owner or, if applicable, the homeowner's association unless the city agrees to assume maintenance. Any agreement for city maintenance will be made a part of the drainage and stormwater easement. 3. Authorized representatives of the Stormwater Administrator may conduct inspections of the structural stormwater control. 4. Deficiencies in maintenance and operation of a structural stormwater control shall be remedied by the property owner or, if applicable, the homeowner's association.

(Ordinance 9513, sec. 1, adopted 12/15/15)

Ask a question about Midland law

Corpus searches the Midland sections it holds and shows the ones that match, with their citations. Free, no sign-in.