§ 11-12-8 — Construction activity
Municipal Code of the City of Midland, Texas (Supp. No. 1, Update 2: codified through Ordinance No. 10709, enacted February 10, 2026) · Midland Municipal Code § 11-12-8
Corpus is an independent public-information project, not the official City of Midland website. Stable reference: corpuslaw.us/code/fa45f10b-a6c3-4884-bb55-03102988d5b8
Sec. 11-12-8. - Construction activity.
(A) This Chapter regulates construction activity for which TCEQ requires TPDES General Permit for Construction Stormwater coverage for small sites of at least one acre but less than five acres and large sites of five or more acres. (B) When required by TCEQ, operators of construction activities shall obtain TPDES permit coverage for the discharge of stormwater and eligible non-stormwater discharges from the construction activity. Operators shall comply with the requirements, effluent limitations, certifications, notice, inspections, and all other applicable conditions of said permit. (C) All plans for construction activity that are required by a city ordinance to be submitted for review shall include an erosion control plan drawing. (D) All operators of a construction activity shall submit to the City of Midland a signed copy of its notice of intent (NOI) and/or construction site notice (CSN), as applicable under the TPDES General Permit for Construction Stormwater. The NOI and/or CSN shall be submitted at least seven days prior to commencing construction activities and shall be posted at the construction site in accordance with TPDES General Permit for Construction Stormwater requirements. (E) Qualified personnel (provided by the operator of the construction activity) shall inspect all areas of the construction site that might discharge soil, wastes and other pollutants. All erosion and sediment control measures and other management practices shall be observed in order to ensure they are operating correctly and are effective. The operator of the construction activity shall maintain, repair, or replace controls and management practices, as appropriate. At a minimum, controls and management practices shall be cleaned and repaired or replaced as needed when capacity is reduced by 50 percent. (F) The City of Midland may inspect a construction activity for compliance with its SWP3 and the TPDES General Permit for Construction Stormwater. Notice of deficiencies will be provided in writing, and the Stormwater Administrator will give a reasonable amount of time, not to exceed ten days, to implement the necessary corrective actions. (G) The City of Midland may deny approval of any building permit, subdivision plat, site development plan, inspection, or any other approval necessary to commence or continue construction or to assume occupancy on the grounds that the controls and management practices described in the erosion control plan drawing reviewed by the City of Midland or observed on a site inspection by the City of Midland are determined by the Stormwater Administrator to not be sufficient to minimize the discharge of soil, waste, and other pollutants associated with construction activity to the extent practicable.
(Ordinance 9513, sec. 1, adopted 12/15/15)
Ask a question about Midland law
Corpus searches the Midland sections it holds and shows the ones that match, with their citations. Free, no sign-in.