For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 10-3-67 — Basis of extension

Code of Ordinances, City of Odessa, Texas (Includes legislation through Ord. No. 2026-22 adopted August 11, 2026) · Odessa City Code § 10-3-67

Corpus is an independent public-information project, not the official City of Odessa website. Stable reference: corpuslaw.us/code/8a9ee5c1-e646-4828-b1bb-946322568790

§ 10-3-67: Basis of extension.

(a) Basis of extension inside city limits. (1) Where extensions of water and sanitary sewer systems are required to serve property inside the city limits, as now adopted or as hereinafter amended by annexation, which is to be subdivided or platted for development by a developer as defined in section 10-3-62 above, water and sanitary sewer facilities may be extended to such properties on the following basis and in accordance with minimum standards and procedures described below: (2) Platting required. Water and sewer service from the city shall not be available to any lot, tract or plot of land, or any part thereof, unless and until a plan, plat or replat of such lot, tract or plot of land has conformed to the platting requirements of the city, has been approved by the city planning and zoning commission, and has been filed for record with the county clerk of Ector or Midland County, Texas, as appropriate. (3) Before final platting, owners of the tract or subdivision shall submit to the director of public works, for his approval, a plan showing the location and size of water and sanitary sewer mains, and valves and fire hydrants as detailed in section 10-3-69 to follow, which will be required to insure adequate service and fire protection to the lots specified in such proposed tract or subdivision. Should the developer desire to plat more lots than he will construct utilities to serve, the city council may, in its discretion, accept in lieu of such finished work or accomplished contract a bond or bank letter of credit in such sum as it may deem sufficient as a guarantee that such water and sanitary sewer mains, valves and fire hydrants will be installed and completed within such time as it may designate, and the developer shall furnish a covenant running with the land agreeing to construct such utilities and the city council may accept and approve such plans before the actual installation of water and sanitary sewer mains, valves or fire hydrants. (4) Any owner of two or more lots in a subdivision in which water and sanitary sewer mains, valves and fire hydrants have not been installed, who builds improvements on such lots for resale or rental and desires to connect such property to city water or sanitary sewer shall be considered to be a developer for purposes of this section. Such owner shall comply with all requirements imposed by this section upon developers for obtaining city water or sanitary sewer. Requirements may include installation of separate water and sewer laterals for each lot created by dividing a previously serviced lot. (b) Basis of extension outside city limits. Water and sanitary sewer facilities may be extended outside the city to certain eligible property subject to listed conditions. (1) Eligibility. If property is not within the city limits, city shall not extend its water or sewer services (collectively referred to as “city services”) to such property unless such property is eligible by reason of one or more of the following conditions: (A) City services at the time of the adoption of this division. However, if based on an industrial district contract, or other contract, such industrial district contract, or other contract, must continue. (B) Subject to a current industrial district contract. (An industrial district contract is required in order for property to receive city utility services if such property is authorized for the creation of an industrial district in the extraterritorial jurisdiction of the city as provided in section 42.044, Texas Local Government Code. The statute provides that “industrial district” has the meaning customarily given to the term but also includes any area in which tourist-related businesses and facilities are located. Attorney General Opinion No. JM-189 states that an industrial plant is a factory, business or concern which is engaged primarily in the manufacture or assembly of goods or the processing of raw materials, or both.) (C) Subject to a water contract approved by a water control and improvement district and the city. (D) Included within an area designated by the state or federal government, or both, as a superfund impacted service area, where the capital expense of installing the water works is to be funded by the state or federal government, or both, by contract approved by the city. (E) Is owned by a government entity and water service is used for purposes of irrigation of government property pursuant to a contract with the city. (F) When the right-of-way, design and construction are funded by another governmental entity pursuant to a contract or contracts approved by the city council. (G) Sewer services can be extended by contract to other entities remediating contaminated groundwater necessary to protect the water in the affected aquifer. The city may also provide water service to the residential property owners whose groundwater has been contaminated and is being remediated by the entity. The entity shall pay all right-of-way, design, construction, and all remediation monitoring, operation and maintenance costs. (H) The property to be served immediately abuts or fronts an existing and authorized city water distribution line, if water service is requested, and a city sewer collection line, if sewer service is requested. This policy shall also apply to a sewer collection line of Gulf Coast Authority provided such use is authorized by contract between Gulf Coast Authority and the city. This section shall not apply, however, if city does not have authority to use the line. This subsection shall also not apply if, because of special circumstances, the proposed use would be cost prohibitive or create a special operational problem as determined by the city manager, or his/her designee. This subsection shall not apply if it is for an industrial use and an industrial district contract is required. This subsection does not apply to land that is intended to be subdivided or developed. (I) The facilities to be constructed and/or the right-of-way to be granted to the city are considered beneficial to the city, as determined by the city council, taking into consideration the total city system. However, if it is an industrial use, an industrial district contract shall be required. (J) In the event that the property of the applicant for water or sewer service is not eligible for designation as an industrial district, but the city manager determines that the proposed use should be approved for purposes of economic development and the creation of jobs, and that it will not have a negative effect on the health and safety of the community, the city manager is authorized to approve a contract for city utility services, as an exception to the requirement in subsection (b)(1)(H) that, “the property to be served immediately abuts or fronts an existing and authorized city water distribution line, if water is requested, and a city sewer collection line, if sewer service is requested.” (K) In addition to the above listed eligibility requirements, the city manager shall use the following criteria in determining if water or sewer service will be provided: (i) Availability of utility lines to the area. (ii) Impact of the utility service on the city’s system. (iii) Availability of water resources to support a customer base outside the city limits. (iv) Other criteria as deemed appropriate. (2) Conditions for utility services outside city. In the event that property is eligible for an extension of services as provided in subsection (b)(1), such extension of services shall require compliance with the following conditions: (A) Water and sewer service from the city shall not be available to any lot, tract or plot of land, or any part thereof, unless an approved plat or replat of such property is filed of record with the county clerk of Midland or Ector County. (B) City must own or be granted, clear of any claims, liens, or charges, all utility easements, right-of-way easements, necessary approvals of other governmental or private entity, mainline extensions, pipes, valves, necessary appurtenances and meters necessary to deliver water or sewer to the property of the owner without any cost to the city. Any water meters shall be unobstructed by fences, gates and other visual impediments. (C) The owners must agree to sign a contract, approved by the city manager, setting forth all of the terms and conditions and agree that the contract can be filed in the deed records so as to bind subsequent purchasers of the property purchasing water or sewer service from the city. (D) No connections will be allowed into a large transmission main or interceptor. (E) Rates will be assessed at 1.5 times the comparable service rate in the city; and in the event that the rate is ever reduced or modified by law or by a higher regulatory authority, the city shall have the right to terminate the service. If in an industrial district, the rate shall be 1.0 times the comparable service rate in the city. (F) The owner shall comply with any applicable state or federal law, the city’s plumbing ordinance, quality standards for sewage as specified in article 13-2, division 4 of the city code, and all other ordinances regulating and specifying requirements for water and sewer use in the city, as now or hereinafter adopted, or as hereinafter amended, including the right to connect or disconnect users. If the owner’s plumbing does not meet the city’s plumbing code, the owner will be required to install a backflow assembly approved by the city. The assembly must be tested by a backflow prevention assembly tester registered with the city upon installation and annually thereafter. (G) Cross connections to the public water supply shall be prohibited and an air gap or backflow assembly approved by the city may be required. If required, the owner shall be responsible for the cost of installation for initial and annual testing as well as ongoing maintenance of the assembly. (H) The city reserves the right to annex the property pursuant to law unless subject to an industrial district contract. The fees to be charged by city for utility services are not to be interpreted as payments in lieu of annexation. (I) The provision of water service shall also be subject to any requirements imposed by the Colorado River Municipal Water District, the supplier of water to the city. (J) The quantities of water to be delivered to owner shall be limited as follows: (i) to those quantities available for sale and delivery after first satisfying the demand and needs of all city and city customers uses within the city limits of Odessa, at the time of delivery, and (ii) committed by contract to other persons or private or public entities, located outside the city limits, prior to the approval of the contract. In the event of curtailment, city and customer uses in the city shall have the highest priority. Exceptions may be made for purposes of economic development. (K) Use of water must comply with the city water conservation and drought contingency plan. (L) Other conditions considered reasonable and necessary by the city manager, or the city manager’s designee. (M) The owner must be willing to pay all costs for the construction of the water or sewer lines. These costs shall include design, right-of-way/easement, and construction costs as well as city costs required to evaluate the feasibility of the project and to inspect the installation. All constructed lines must be approved and accepted by the city pursuant to city’s permitting and construction requirements. (N) The owner must pay, before the city will process a request for service outside the city limits, the outside city utility service application fee of $50.00 for the initial lot and an additional $10.00 for each additional lot. If service is approved, the owner must pay all filing fees for the contract. (O) Requirements may include installation of separate water and sewer laterals and taps for each lot created by dividing a previously serviced lot. (c) Extensions within property to be developed. (1) Developers of such property will defray the entire cost of water and sanitary sewer systems within their subdivision except that the city will refund the oversize cost of any water main or sanitary sewer main larger than 8" in size, unless a larger size is required to serve the subdivision in question. The city engineer shall determine the size of mains for adequate service. The city will make refunds of oversize cost, upon acceptance of the systems (exhibits K and L). Exhibit K. [image] Exhibit L. [image] (2) Mains lying along one or more sides of a subdivided tract: (A) For side mains 8" and smaller the developer will be refunded one half the evaluated cost of the size main constructed as set forth in section 10-3-70 below, such refunds will be made upon acceptance of the system by the city. (B) For side mains larger than 8" in size the developer will be refunded the difference between the evaluated cost of such water and/or sanitary sewer main and one-half the evaluated cost of an 8" main or such larger sizes as are required to serve the subdivision for which extensions are required, provided the developer has advanced the total cost of such mains. Where such mains are laid by city contract in conjunction with the development, the developer will pay the city one-half the evaluated cost of an 8" water or sanitary sewer main, or such sizes as are required to serve the subdivision. Upon acceptance of the system by the city, any refunds due will then be made (exhibit M). Exhibit M. [image] (d) Off-site extensions. Off-site extensions required to serve property development: where water and/or sanitary sewer facilities are not available to a tract to be developed the city will extend such facilities to the nearest subdivision property line within the following limitations: (1) Water transmission mains or trunk sewers for which funds have been specifically programmed and for which funds are available, will be extended to serve property to be developed, provided the total cost of such off-site water and/or sanitary sewer facilities, including city inspection and engineering costs, is determined by the city, in its sole discretion, to be reasonable based on proximity to existing facilities, potential for development, and the ability to provide appropriate water and sewer service. Where programmed items of construction will extend through the area to be subdivided, and such construction is accomplished by city contract, the developer will pay to the city, the pro-rata price of an 8" water and/or sanitary sewer main or such sizes as are required to serve the subdivisions for which extension is required. (2) Off-site water and sanitary sewer mains for which funds have not been specifically programmed will be constructed at the expense of the developer requiring such extensions; provided, however, that the city will refund the cost of such mains offsite, as by the pro-rata costs established in section 10-3-63, as adjacent development occurs to the installed line. In no instance will more than the total evaluated cost of off-site facilities be refunded. The developer will not be eligible for any refunds after five (5) calendar years from date of acceptance of the improvements by the city.

( Ordinance 2018-20 adopted 5/8/18 )

Ask a question about Odessa law

Corpus searches the Odessa sections it holds and shows the ones that match, with their citations. Free, no sign-in.