§ 10-3-69: Method by which water and sanitary sewer mains may be constructed.

Water and sanitary sewer main extensions to serve a real estate subdivision in the city may be accomplished in the following manner: (1) By private contract. (A) Upon approval by the city, a developer of an addition or plat shall design and prepare construction plans of water and sanitary sewer facilities, or either of them, to serve the subdivision, including any access or off-site facilities that may be required. These plans shall conform in all details to the city’s standard as to design, location, and size, and quality of materials and construction. City standards and specifications shall be minimum requirements. (B) The engineer submitting the plans and specifications must be a licensed professional civil engineer in the state, and affix seal and signature to the originals of all plans and specifications in accordance with applicable rules and regulations. (C) Three copies of the preliminary plans for water and sanitary sewer lines shall be submitted to the city’s public works department for approval along with a copy of the preliminary plat. After review of the preliminary plans by the city, one copy, along with a copy of the city’s comments and recommendations, will be returned to the developer’s engineer. (D) Three copies of the completed drawings for water and sanitary sewer plans and specifications shall then be submitted to the director of public works for final approval, accompanied by two copies of the standards and specifications, two copies of the plans and specifications of the storm sewers and street and alley grades as approved by the department of public works and two copies of the plat of the addition that has been recorded in the records of the County of Ector or Midland and has been so stamped. Upon final approval, one copy of the plans will be returned to the developer’s engineer for the purpose of making such corrections or changes as the city may require. The developer’s engineer will then furnish the public works department three sets of corrected plans plus a complete set of reproducible sepias and digital media which will become permanent property of the department of public works. (E) Upon final approval of the plans by the city, the developer may enter into a contract with any individual or may himself construct the system as so planned; provided, however, that the construction and installation of the water mains and sanitary sewer mains, or either of them, shall be inspected by inspectors of the city to see that the installation is made in accordance with the plans and of the city’s standard specifications which, in every instance, shall be a part of said installation contract. The person or company doing the construction work shall meet all of the city requirements as to permits, right-of-way construction bonds, and insurance for right-of-way construction work. (F) When the project is ready for construction, line and grade stakes will be set by the developer’s engineers; but these stakes will not be set until after the developer’s engineer has properly staked on the ground with iron pins all points of curves, all points of tangency, all block corners, and all lot corners within the subdivision. (G) No installation of water or sewer mains will be made at any other location except a dedicated street, alley, or an easement running in favor of the city which has been filed for record with the county clerk of Ector or Midland County, Texas, by the owner of said addition. (H) Any such installation, when made, shall become the property of the city, free and clear of all encumbrances. (I) The city specifically reserves the option to advertise for bids and install all or any portion of extensions of water and sanitary sewer lines over 8" in size where evaluated prices are not specified in section 10-3-70 below. (2) By city contract. (A) The procedure for approval of construction plans shall be as for private contract, subsection (1) above. (B) Upon approval by the city a developer of an addition or plat shall design and prepare construction plans of water and sanitary sewer facilities that may be required. The city will not be obligated to proceed under a city contract for partial construction of a project. Bids for this construction work shall be secured and a contract awarded at a regular meeting of the city council. The developer of the addition or plat shall, prior to award of the contract, deposit with the city the total estimated cost of all extensions required to serve, including the cost of approach or off-site mains fronting property not owned by the developer, if required by the provisions of section 10-3-67(c), plus engineering and inspection fees. The city will inspect the construction of such mains and upon determination of final completion cost, will refund any excess amount deposited or require of such developer additional funds due to defray the entire cost of the entire project. Refundable amounts for off-site costs or oversize cost shall be in accordance with section 10-3-67 preceding and will be determined and refunded on the basis of unit bid prices of the project; provided, however, the city reserves the right to reject any unbalanced or unfavorable bid and may refuse to proceed under this basis if weather or seasonal conditions are likely to cause excessive costs to bid for the work. If the developer desires to proceed under a contract deemed to be unbalanced or unfavorable, refundable amounts for off-site or oversize cost will be determined and refunded on the basis of evaluated cost. If the developer selects the city contract option, he shall stake the subdivision as for private contract, subsection (1) above, prior to a work order being issued by the city and shall properly coordinate after construction contracts so as not to interfere or damage water or sewer mains in place. Any damage, relocation or revisions necessitated by other construction shall be for the developer’s account and the city may withhold water and sewer service until such accounts are settled.

( Ordinance 2018-20 adopted 5/8/18 )