§ 3-9-3 — Site plan required
Code of Ordinances, City of Odessa, Texas (Includes legislation through Ord. No. 2026-22 adopted August 11, 2026) · Odessa City Code § 3-9-3
Corpus is an independent public-information project, not the official City of Odessa website. Stable reference: corpuslaw.us/code/d7ccfb46-3cde-4604-b13f-a740c2a7ee43
§ 3-9-3: Site plan required.
A building permit application for a wind energy conversion system shall be accompanied by a site plan drawn in sufficient detail to clearly describe the following: (1) Property lines and physical dimensions of the site; (2) Location, approximate dimensions, and types of major existing structures and uses on-site; (3) Locations and elevation of the proposed WECS; (4) Location of all aboveground utility lines on-site or within one radius of the total height of the WECS; (5) The zoning designation of immediate and adjacent sites as set forth in the zoning ordinances of the city.
( Ordinance 86-05 , sec. 1, adopted 1/14/86 ; 1957 Code, sec. 4A-54 )
Ask a question about Odessa law
Corpus searches the Odessa sections it holds and shows the ones that match, with their citations. Free, no sign-in.
