§ 3-9-4 — General conditions

Code of Ordinances, City of Odessa, Texas (Includes legislation through Ord. No. 2026-22 adopted August 11, 2026) · Odessa City Code § 3-9-4

Corpus is an independent public-information project, not the official City of Odessa website. Stable reference: corpuslaw.us/code/1231e3c4-2aee-42dc-8955-691aed5563f6

§ 3-9-4: General conditions.

Installation of all wind energy conversion systems shall comply with the following requirements: (1) Water pumpers. Nonelectrical windmills used for pumping water will be exempted from the provisions of subsections (3) through (12). (2) Compliance with building code. The building permit application shall be accompanied by standard drawings of the structural components of the wind energy conversion system, including support structures, tower, base and footings, in sufficient detail to allow for a determination that the structure conforms to the building code of the city. Drawings and any necessary calculations shall be certified to in writing by a registered professional engineer and shall affirmatively state that the proposed system will comply with the building code. Where the structural components or installation varies from the standard design or specification, the proposed modifications shall be certified by a registered professional engineer for compliance with the seismic and structural design provisions of the building code. (3) Compliance with zoning ordinance. Wind energy conversion systems shall only be constructed and used pursuant to and in compliance with the city zoning ordinance. (4) Compliance with National Electrical Code. Building permit applications shall be accompanied by a line drawing identifying the electrical components of the wind system to be installed in sufficient detail to allow for a determination that the manner of installation conforms to the National Electrical Code. The application shall include a statement from a registered professional engineer indicating that the electrical system conforms with good engineering practices and complies with the National Electrical Code. All equipment and materials shall be used or installed in accordance with such drawings and diagrams. (5) Rotor safety. Each wind energy conversion system must be equipped with both manual and automatic controls to limit the rotational speed of the blade below the design limits of the rotor. The application must include a statement by a registered professional engineer certifying that the rotor and overspeed controls have been designed and fabricated for the proposed use in accordance with good engineering practices. (6) Guy wire. Anchor points for guy wires for the WECS tower shall be located within property lines and not on or across any aboveground electric transmission or distribution line. (7) Tower access. Towers shall have either: (A) Tower-climbing apparatus located no closer than twelve (12) feet from the ground; (B) A locked anti-climb device installed on the tower; or (C) The tower shall be completely enclosed by a locked protective fence at least six (6) feet high. (8) Noise. The WECS shall meet the requirements of the performance standards which pertain to noise level as set forth in the city zoning ordinance. (9) Sign. At least one sign shall be posted at the base of the tower warning of electrical shock or high voltage. Sign size shall not exceed two (2) square feet. (10) Setbacks. The following setback requirements shall apply: WECS shall be set in from any and all property lines a distance equal to the height of the tower plus the furthest vertical extension of the blade, rotor or propeller assembly, except as noted in subsection (11) where an additional five-foot setback is required for separation from overhead utility lines. (11) Additional locational requirements. The WECS shall be located a sufficient distance from any overhead utility lines, excluding service drops, such that a structural failure of any portion of the WECS or its supporting structure would not cause any portion of it to fall within five (5) feet of the lines. (12) Utility notifications (for those WECS which will be interconnected to a utility grid). No WECS shall be installed until evidence has been given that the utility company has been notified in writing.

( Ordinance 86-05 , sec. 1, adopted 1/14/86 ; 1957 Code, sec. 4A-55 )