§ 21-133 — Tap, meter set, sewer connection fees generally, payment, disposition of tapping fees, cost of material and miscellaneous service charges, fire hydrant construction meters, detector check valves, water meter vaults and water meter accuracy test
Code of Ordinances, City of Plano, Texas (Supp. No. 153: codified through Ordinance No. 2025-10-2, adopted October 13, 2025) · Plano City Code § 21-133
Corpus is an independent public-information project, not the official City of Plano website. Stable reference: corpuslaw.us/code/aa87a685-3e84-418b-928d-7fbf03b53a8d
Sec. 21-133. - Tap, meter set, sewer connection fees generally, payment, disposition of tapping fees, cost of material and miscellaneous service charges, fire hydrant construction meters, detector check valves, water meter vaults and water meter accuracy test.
(a) Water and sewer tap estimates generally. (1) Fees for installation of water and sewer taps, service lines, and laterals shall be based on the estimated costs of making such installation, as determined by the utility operations superintendent. Upon request of such installation, the utility operations superintendent shall issue or cause to be issued an estimate for making the installation, including all labor, materials and equipment necessary to complete the construction. Prior to an estimate being issued, a fee of forty dollars ($40.00), along with an approved set of plans, must be submitted to the city by any person in whose name the permit is to be issued. Upon payment of the estimated amount, the superintendent will schedule the construction. There will be no refunds or additional charges after installation, provided the actual cost is within five (5) percent of the estimate. (2) For the purposes of this section, "installation of water and sewer taps, service lines, and laterals" shall be considered all work necessary to provide service lines to the point where a water meter can be set or the property owner can connect to the sewer system. (b) Water taps and meters generally. (1) Fees for installation of water meters shall apply where the tap, corporation stop, service line, angle stop and meter box or vault are existing. Should any of these components be missing or damaged, the cost of missing or damaged components, plus labor and equipment to install, shall be borne by the customer. Meter boxes or vaults for the above meter shall be placed or constructed by the customer at his own cost and in accordance with city "Standard Construction Detail Specifications," latest revision. (2) Fees for individual meters shall be based on the current contract cost per meter at the time of installation, plus warehouse charges, labor, equipment and materials necessary for city employees to make each installation. Fees may be adjusted as necessary to ensure that the city recovers all cost expended in the performance of each water meter installation. All fees shall be paid in advance of installation of the meter. Total fee shall be established by the city manager. (3) All meters shall remain the property of the city, but the property owner shall be responsible for its protection. The utility operations manager or his designee shall determine the availability of size, type and number of meters and services to be installed or used on any water service to any building or division of space in a building, or property subdivision and the location of same. (4) All meters three (3) inches and above in size shall be installed with the appropriate and necessary required fittings to facilitate field testing and shall be constructed in accordance with city "Standard Construction Detail Specifications," latest revision. (5) Should it be necessary to increase the size of a meter due to a change in the customer's demand for water, the customer will be credited with the current value of the present meter (less the cost necessary to recondition the meter to new meter standards and accuracy), toward the purchase of a new meter. All work necessary for a new tap or service line shall be charged in accordance with subsections (a) and (b) of this section. (c) Sanitary sewer connections generally. (1) The fee for connection to sanitary sewer lines where the sewer lateral outlet has been installed to the property line shall be: 4-inch service .....$ 50.00 6-inch service .....75.00 8-inch service .....125.00 All work necessary for a new tap or service line shall be charged in accordance with subsection (a) of this section. (2) All taps into a city sewer trunk line or tap to connect to any sewer shall be made by employees of the utility operations department of the city; provided however, a sewer tap permit has been issued to said property by the city's code enforcement division. All taps shall be made in accordance with city "Standard Construction Detail Specifications," latest revision. (d) Miscellaneous water and sewer service charge: (1) The following miscellaneous service charges shall be assessed and collected by the city for such as hereinbelow described: a. Flow and/or pressure test on city fire hydrant(s) when performed at the request of any person, minimum charge, seventy-five dollars ($75.00) each hydrant. b. Location of meter boxes, vaults and/or meters; also service lines on private property, minimum charge, twenty-five dollars ($25.00). (e) Fire hydrant meters—Rates effective February 1, 2008: (1) Any person requesting the use of a temporary meter with backflow device on a fire hydrant in the city shall execute an agreement with the city in substantially the same form as that set forth in Exhibit "A", a copy of which is on file in the office of the city secretary, and shall deposit with the city one thousand fifty dollars ($1,050.00) for a stationary meter and backflow device and one thousand fifty dollars ($1,050.00) for a mobile meter and backflow device. Such deposit shall be returned upon payment of all charges for water used, upon return of the meter, fittings, and wrench in their original condition. (2) Stationary meters shall be locked to fire hydrants at all times. An initial installation and set-up fee of fifty dollars ($50.00) will be charged, and a service fee of fifty dollars ($50.00) will be charged each time the meter is moved to a different location at the request of the customer. (3) All stationary fire hydrant meters shall be read monthly at their location in the field by utility operations. All mobile fire hydrant meters are to be brought to Utility Operations, 4120 W. Plano Parkway, Plano, Texas between the first and tenth day of each month to be read. Failure to bring the meter in to be read by the tenth day of the month shall result in an additional charge of one hundred thousand (100,000) gallons plus the minimum charge for service at the rate then in effect. The water charges for fire hydrant services is set forth in subsection 21-147(4). Such charges shall be nonrefundable. (4) All customers using such meters shall comply with the written procedures implemented by the utility operations superintendent with regard to making the meters available to be read by representatives of utility operations. It shall be unlawful for any person to fail to make such meter available to be read by representatives of utility operations, as required by written procedures issued by the utility operations superintendent. (5) Fire hydrants are provided primarily to extinguish fires and are to be used and opened only by the utility operations, the fire department or such person(s) or company as may be given written authority by utility operations as outlined in subsection (e)(1) of this section. To ensure the safety and protection of fire hydrants for fire protection, any person authorized to open fire hydrants shall use only an approved fire hydrant wrench and shall replace the caps on the outlets when the same are not in use; failure to do so shall be sufficient cause to prohibit further use of the hydrants and to refuse to grant subsequent permits for the use of fire hydrants and meters. (f) Fire line detector check valves. (1) The installation of a detector check valve shall be required on all fire line services to buildings which are designed with standpipes (open sprinkler system). (2) At such time as a detector check valve is installed within the city, it shall be placed in a concrete vault within a water or utility easement dedicated to the city, allowing ready access by city personnel. (3) All materials, piping and fittings, including the concrete vault, shall be placed or constructed by the customer at his own cost. (4) All detector check valves installed within the city shall be constructed and installed in accordance with approved plans and specifications as set forth in the city "Standard Construction Detail Specifications," latest revision. (g) Water meter vaults. (1) There is hereby required the installation of a concrete vault on all water meters three (3) inches and larger. (2) At such time as vault is required, it shall be constructed and installed in accordance with approved plans and specifications as set forth in the city "Standard Construction Detail Specifications," latest revision. (h) Water meters generally. (1) All water meters shall be furnished by the utility operations department, shall be set by the employees of the city and shall remain at all times the property of the city. (2) If the meter gets out of order and fails to register, the consumer will be charged at the average daily consumption, as shown by the meter when in order. (3) All meters shall be maintained, repaired, and replaced when necessary by the utility operations department. When replacements, repairs or adjustments of any meter are necessary by any act, neglect or carelessness, any expense caused to the city thereby shall be charged against and collected from the owner or occupant of the premises, and if not paid, service shall be discontinued. (4) When any consumer of water is of the opinion that the meter through which the water is supplied is incorrect for any reason, he may make application to the utility operations department to have the meter examined and tested. (5) The procedure shall be as follows: When the application for test is made, a special deposit of thirty-five dollars ($35.00) shall be made with the application, a test will be arranged for and the complainant shall be notified by the city of the time and place of the test. Whether the complainant appears or not, the test shall be made and witnessed. If the test shows the meter to be more than two (2) percent fast, based on a series of tests over the range of flow recommended by its manufacturer, the meter shall be replaced with an accurate one and the thirty-five-dollar deposit returned, together with a written statement of the test findings. If the test shows the meter to be any less than two (2) percent fast, the thirty-five-dollar deposit shall ipso facto be forfeited to the city, a brief written statement of the test findings will be mailed to the complainant and the incident recorded closed. Provided, however, that field testing of meters one and one-half (1½) inches and two (2) inches, when requested by the user and made by the city, shall cost seventy-five dollars ($75.00). Field testing of meters three (3) inches and larger shall cost a minimum of two hundred fifty dollars ($250.00), or the actual cost, whichever is greater. (i) Electronically read meters. (1) All water meters issued by the city shall be fitted with an electronic transmitter enabling the meter to be read remotely. Fees for the water meters and electronic transmitters shall be set by the city council and published by resolution. Fees may be adjusted as necessary to ensure that the city recovers all cost expended in the implementation of the electronic meter reading program. All fees shall be paid in advance of installation of the water meter. (2) All water meters and electronic transmitters shall remain the property of the city and shall be installed by, or at the direction of the city. The property owner shall be responsible for the protection of this equipment. When replacement, repair or adjustment of any meter or electronic device is required due to the negligence or intentional wrongful acts or omissions of the property owner, the cost for replacing, repairing or adjusting the device shall be charged to and collected from the owner or occupant of the premises. (3) The city reserves the right, without exception, to install any device on any water meter to facilitate the collection of water usage data for any purpose including monitoring and billing for actual usage. The director of the customer utility services department for the city shall determine the type of water meter and electronic transmitter to be installed and the appropriate time to install this equipment. (4) The city reserves the right, without exception, to obtain access to any water meter in the city, without regard to the presence or absence of an electronic transmitter, to ensure accurate billing and collection for any service provided to residents and other customers within the community.
(Ord. No. 82-8-23, § 1, 8-23-82; Ord. No. 82-8-24, § 1, 8-23-82; Ord. No. 82-11-10, § 1, 11-22-82; Ord. No. 83-2-24, § 1, 2-28-83; Ord. No. 85-9-20, § I, 9-23-85; Ord. No. 96-11-5, § I, 11-11-96; Ord. No. 2001-6-22, § I, 6-25-2001; Ord. No. 2003-4-17, §§ I, II, 4-14-03; Ord. No. 2004-1-22, § I, 1-26-04; Ord. No. 2004-9-28, § II, 9-27-04; Ord. No. 2008-1-9, § I, 1-14-08)
Ask a question about Plano law
Corpus searches the Plano sections it holds and shows the ones that match, with their citations. Free, no sign-in.