§ 21-137 — Standard and nonstandard cooling tower meters

Code of Ordinances, City of Plano, Texas (Supp. No. 153: codified through Ordinance No. 2025-10-2, adopted October 13, 2025) · Plano City Code § 21-137

Corpus is an independent public-information project, not the official City of Plano website. Stable reference: corpuslaw.us/code/bcbe8776-0ec7-4fac-afd1-52a499093cbe

Sec. 21-137. - Standard and nonstandard cooling tower meters.

(a) A standard evaporative cooling tower shall be defined as an installation which receives supply water from a meter installed in accordance with the city specifications applicable to the installation of water meters. A nonstandard evaporative cooling tower shall be defined as an installation which does not receive supply water from a meter installed in accordance with normal and customary methods, but which does receive metered supply water through a source which has been previously metered according to normal and customary methods. (b) Sewer charges for standard and nonstandard evaporative cooling towers shall be calculated on the following basis: (1) Installation requirements. a. A meter will be installed in the water supply line (make-up meter) and a meter will be installed on the discharge portion of the supply line (blowdown meter) for the evaporative cooling tower in a location approved, in advance, by the city. These meters must be purchased from the city. The customer will be responsible for the installation of the make-up meter, blowdown meter and all piping. The piping must be installed in accordance with the standard city specifications applicable to the installation of water meters. b. The customer shall pay the minimum plumbing permit fee based upon the current fee structure in place at the time of installation. No impact fee shall be levied for an evaporative cooling tower meter installed in accordance with this section. c. The city reserves the right to inspect, remove and/or replace the meter for cause, with proper notice. d. No additional deposit will be required for either the evaporative cooling tower make-up meter or blowdown meter. (2) Reading of meters, remote. Cooling tower customers shall, at their sole expense, purchase from the city a remote reading device capable of transmitting a reading of consumption for each meter. The city shall read the make-up and blowdown meters electronically once per month. (3) Billing. a. A standard cooling tower will receive a minimum charge based on meter size for both the make-up meter and blowdown meter. A nonstandard cooling tower will receive no minimum charges for either the make-up or blowdown meter. b. Both the make-up and blowdown meters will be read remotely each month and the consumption from each meter will be billed in accordance with sections 21-136 and 21-147. Water charges for cooling tower consumption will be billed based on the meter readings taken from the make-up meter. Sewer charges for cooling tower consumption will be billed based on the meter readings taken from the blowdown meter. In order for customers using water for cooling purposes to remain eligible for sewer charges based on their blowdown meter, they must operate their cooling tower system within an acceptable range of cycles of concentration indicated by the ratio of make-up water to blowdown water from submeter readings. The acceptable range for system cycles of concentration will be set by the customer and utility services division based on known industry standards. Should the city water quality change, which change affects the acceptable range, the city will notify the customer of the change. c. A customer may file a request for a variance with the customer and utility services division requesting higher cycles of concentration. A variance request form will be supplied by the city to be completed by the customer. Upon submission of the variance request form, the customer and utility services division will review in order to determine the validity of the variance request based on known industry standards in water treatment technology. The city review of the variance request may require a site visit to the facility. d. The system will be evaluated each billing period for compliance. The customer will be notified if the system is not within cycle of concentration range of compliance. The customer shall be billed sewer based on the meter readings taken from the make-up meter for any billing period the system is out of compliance. e. The customer shall be billed sewer based on the meter readings taken from the make-up meter for a period of one (1) year if any of the following occurs: 1. A customer knowingly represents that the facility for which a meter is installed does not discharge waste into the city's sanitary sewer when, in fact, it does; 2. A facility is subsequently connected to the city's sanitary sewer system without notifying the customer and utility services division; 3. Evidence of tampering or otherwise inhibiting the proper functioning of any meter is discovered; or 4. The customer fails to comply with the terms and conditions under which the evaporative cooling tower make-up meter or blowdown meter is installed in accordance with this section. (4) Annual testing of meters. Make-up meters will follow the city's normal change-out schedule for testing. Blowdown meters may be pulled and tested or replaced, at no charge to the customer, no less frequently than once every twelve (12) months by city staff to determine the following: a. Accuracy of the meters; and b. That no water is being discharged into the sanitary sewers of the city except that water which is measured by the blowdown meter.

(Ord. No. 90-9-4, § I, 9-10-90; Ord. No. 2004-9-28, § III, 9-27-04; Ord. No. 2016-6-28, § I, 6-28-16)