For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 8-30 — Standards for Areas of Shallow Flooding (AO/AH Zones)

Code of Ordinances of the City of Sugar Land, Texas (Supp. No. 56: codified through Ordinance No. 2403, adopted June 16, 2026) · Sugar Land Development Code § 8-30

Corpus is an independent public-information project, not the official City of Sugar Land website. Stable reference: corpuslaw.us/code/2df2954e-740a-4b85-8680-c5ee2a6f5566

Sec. 8-30. - Standards for Areas of Shallow Flooding (AO/AH Zones).

Located within the areas of special flood hazard are areas designated as shallow flooding. These areas have special flood hazards associated with base flood depths of 1 to 3 feet where a clearly defined channel does not exist and where the path of flooding is unpredictable and where velocity flow may be evident. Such flooding is characterized by ponding or sheet flow; therefore, the following provisions apply: A. All new construction and substantial improvements of residential structures must have the lowest floor (including basement) elevated above the highest adjacent grade of at least 1 foot higher than the depth number specified in feet on the community's FIRM (at least 3 feet if no depth number is specified). B. All new construction and substantial improvements of non-residential structures: 1. Have the lowest floor (including basement) elevated to at least 1 foot above the BFE or the highest adjacent grade of at least 1 foot higher than the depth number specified in feet on the community's FIRM (at least 3 feet if no depth number is specified), or 2. Together with attendant utility and sanitary facilities or any structure that is 1 foot above and below the BFE must be designed and constructed so that they are watertight with walls substantially impermeable to the passage of water and with structural components having the capability of resisting hydrostatic and hydrodynamic loads including the effects of buoyancy from at least 1 foot above the BFE to the depth of the facility (see Figure 1) in an AH Zone. The same requirement applies in an AO Zone, with at least 1 foot above the specified flood depth to the depth of the facility (see Figure 1). C. A registered professional engineer or architect shall submit a certification to the Floodplain Administrator that the standards of this Section are satisfied. D. Require within Zones AH or AO adequate drainage paths around structures on slopes to guide flood waters around and away from proposed structures.

(Ord. No. 1979, § 2, 12-2-14; Ord. No. 2248, § 9, 11-2-21)

Ask a question about Sugar Land law

Corpus searches the Sugar Land sections it holds and shows the ones that match, with their citations. Free, no sign-in.