Sec. 19-13. Extensions in development having private streets.

The extension of water or sewer system lines for domestic service or fire protection within residential developments having private street(s) shall be in accordance with the following: a. Off-site mains required to serve developments under this section may be constructed under either section 19-10 or section 19-14. b. Developer will prepare a contract having the following stipulations : 1. Developer shall award the contracts for construction of water or sewer facilities, including off-site mains and service connections. 2. Developer shall pay all of the cost of all water or sewer facilities, including off-site mains and service connections without participation or refund by City. 3. Design, development of construction plans, specifications and contract documents, and construction staking for the water or sewer facilities to be constructed shall be performed by a professional engineer registered in Texas and shall conform to the same design guidelines and other criteria which govern contracts let by City, including providing as-built plans following completion of construction. The developer shall provide to the Director six (6) sets of construction plans, specifications and contract documents prior to issuance of project work order. The developer shall follow and adhere to all applicable provisions and specifications of the Tyler Unified Development Code in Chapter 10 of the City of Tyler Code of Ordinances. 4. Before a developer may award a contract to any prospective contractor for construction of water or sewer facilities, it must be established that the contractor has been approved by the Director. 5. The issuance of an order to commence work shall be approved by the Director and all water and sewer construction shall be subject to inspection and control at any and all times by the City utility inspector. In no case shall any water or sewer facility be installed unless the responsible City inspector is present and gives consent to proceed. Laboratory tests of materials being used shall be made, at Developer’s expense, if required by the Director. 6. No final payments to contractors shall be made until after approval and preliminary acceptance by the Director. This approval pertains to the satisfactory completion of the work for which payment is made and shall not constitute approval of the quantities on which the payment is based. 7. Connections of buildings to service connections are prohibited until the water or sewer facilities to which they connect have been declared available for service and had preliminary acceptance by the Director. 8. Title and ownership of all sanitary sewers and water mains constructed under the terms of this option, exclusive of service connections, shall be vested in the City upon final acceptance. 9. Prior to the award of any construction contract, the developer shall convey easements acceptable to the Director covering all land which will be occupied by the proposed lines and water or sewer facilities. The easements shall contain sufficient space to ensure that maintenance or repair of the facility can be accomplished with usual excavation practices. 10. Choices for Developers to Provide Assurance. Prior to commencing work, the developer shall have plans approved by the City. In addition, prior to final acceptance of the work by the City, the developer shall meet the requirements set forth in either subsection a. OR subsection b below. a. Choice 1.-If developer chooses to furnish bonds, the following requirement shall be met: (i.) Submission of a one hundred percent (100%) payment bond in the name of the City, covering construction of the facility to be built; and (ii.) Submission of a guarantee or maintenance bond for one hundred percent (100%) of the cost of improvements in the name of the City covering the facility against defects in materials and/or workmanship for a period of one year after completion and acceptance of the facility by the Director. (iii.) All required improvements shall be completed to the City of Tyler standards and specifications; and (iv.) A final inspection of completed improvements shall be performed by the City Engineer or authorized representative, and work must be approved and/or accepted by the City of Tyler. The developer shall maintain all improvements until improvements have been accepted by the City of Tyler; and (v.) Complete record drawings of required improvements have been submitted to and approved by the City Engineer. b. Choice 2.- If developer does not choose to furnish bonds per subsection a., then before a plat is filed with the county clerk, the following requirements shall be met: (i.) All required improvements shall be completed to the City of Tyler standards and specifications; and (ii.) A final inspection of completed improvements shall be performed by the City Engineer or authorized representative, and work must be approved and/or accepted by the City of Tyler. The developer shall maintain all improvements until improvements have been accepted by the City of Tyler; and (iii.) The general contractor shall submit an Affidavit of All Bills Paid to the City Engineer certifying that all construction bills have been paid, and materials and workmanship are guaranteed for one year; and (iv.) Complete record drawings of required improvements have been submitted to and approved by the City Engineer. (v.) Submission of a guarantee or maintenance bond for one hundred percent (100%) of the cost of improvements in the name of the City covering the facility against defects in materials and/or workmanship for a period of one year after completion and acceptance of the facility by the Director. 11. Water or sewer facilities constructed under this option will not receive final acceptance by City until all developmental improvements are completed and accepted by the Engineer and Director. Maintenance and reconstruction of the facilities during the period between preliminary and final acceptance will be the responsibility of the developer. c. All costs of extensions or improvements to the water and sewer systems under this section shall be borne by the developer with no portion of said costs eligible for refund by City. (Ord. No. O-96-54, 6-26-96) (Ord. No. 0-99-80, 10/20/99) (Ord. No. 2009-7, 2/11/09) (Ord. No. O-2019-63, 08/14/2019

Ask a question about Tyler law

Corpus searches the Tyler sections it holds and shows the ones that match, with their citations. Free, no sign-in.