§ 11-37 — Same—Duties
Code of Ordinances of the City of Waco, Texas (Supp. No. 88: codified through Ordinance No. 2026-250, enacted April 21, 2026) · Waco City Code § 11-37
Corpus is an independent public-information project, not the official City of Waco website. Stable reference: corpuslaw.us/code/24d4cc9e-48e0-4d38-a6c8-868d2699a7b4
Sec. 11-37. - Same—Duties.
The duties and responsibilities of the floodplain administrator under this chapter shall include, but not be limited to, the following: (1) Maintaining and holding open for public inspection all records pertaining to the provisions of this chapter. (2) Reviewing permit applications to determine whether the proposed building sites, including the placement of manufactured homes, will be reasonably safe from flooding. (3) Reviewing, approving, or denying all applications for floodplain development permits required by adoption of this chapter. (4) Reviewing permits for proposed development to assure that all necessary permits have been obtained from those federal, state or local governmental agencies (including Section 404 of the Federal Water Pollution Control Act Amendments of 1972, 33 USC 1334) from which prior approval is required. (5) Where interpretation is needed as to the exact location of the boundaries of the area of special flood hazards (for example, where there appears to be a conflict between a mapped boundary and actual field conditions), the floodplain administrator shall make the necessary interpretation. (6) Notifying, in riverine situations, adjacent communities and the state coordinating agencies which are the Texas Water Development Board (TWDB) and the Texas Commission of Environmental Quality (TCEQ), prior to any alterations or relocation of a watercourse, and submitting evidence of such notification to the Federal Emergency Management Agency. (7) Assuring that the flood-carrying capacity within the altered or relocated portion of any watercourse is maintained. (8) When base flood elevation data has not been provided in accordance with section 11-2(b), the floodplain administrator shall obtain, review and reasonably utilize any base flood elevation data and floodway data available from a federal, state and/or other source, in order to administer the provisions of sections 11-61 through 11-64. (9) When a regulatory floodway has not been designated, the Floodplain Administrator must require that no new construction, substantial improvements or other development (including fill) shall be permitted within Zone AE on the city's FIRM, unless it is demonstrated that the cumulative effect of the proposed development, when combined with all other existing development, will not increase the water surface elevation of the base flood on upstream, downstream, or adjacent properties. (10) Under the provisions of 44 CFR Chapter 1, Section 65.12, of the National Flood Insurance Program regulations, a community may approve certain development in Zones AE and AH on the community's FIRM which increases the water surface elevation of the base flood, provided that the community first completes all of the provisions required by Section 65.12 and there are no adverse impacts on upstream, downstream, or adjacent properties. (11) In any unstudied area or area where the conditions have changed since the last study was done, the floodplain administrator may require a floodplain determination prepared by a licensed professional engineer.
(Ord. No. 2013-486, § 2, 8-20-13; Ord. No. 2025-477, § 3, 6-17-25)
Ask a question about Waco law
Corpus searches the Waco sections it holds and shows the ones that match, with their citations. Free, no sign-in.
