Sec. 11-41. - Variance procedures.
(a) The zoning board of adjustment shall hear and render judgment on requests for variances from the requirements of this chapter. The board shall hear and render judgment on an appeal only when it is alleged there is an error in any requirement, decision or determination made by the floodplain administrator in the enforcement or administration of this chapter. (b) Proceedings before the zoning board of adjustment shall utilize the following procedures: (1) Upon receipt of a determination by the floodplain administrator about an alleged error in a requirement, decision or determination, the permit applicant may appeal such to the zoning board of adjustment by filing a written request with the floodplain administrator. In the request, the requirement, decision or determination being appealed shall be specified and the basis for the appeal shall be clearly stated. (2) The zoning board of adjustment shall hold a public hearing on the appeal. Public notice of such hearing shall be given at least three days in advance of such hearing. The applicant shall be given notice of such hearing at least seven days in advance by personal service or by mail; however, the applicant may waive the requirement of notice to him. (c) Any person aggrieved by the decision of the board may appeal such decision in the courts of competent jurisdiction. (d) The floodplain administrator shall maintain a record of all actions involving an appeal and shall report variances to the Federal Emergency Management Agency upon request. (e) Variances may be issued for the reconstruction, rehabilitation or restoration of structures listed on the National Register of Historic Places or the state inventory of historic places, without regard to the procedures set forth in the remainder of this chapter. (f) Upon consideration of the factors noted above and the intent of this chapter, the board may attach such conditions to the granting of variances, as it deems necessary, to further the purpose and objectives of this chapter. (g) Variances shall not be issued within any designated floodway if any increase in flood levels during the base flood discharge would result. (h) The prerequisites for granting variances under this section shall be as follows: (1) Variances shall only be issued upon a determination that the variance is the minimum necessary, considering the flood hazard, to afford relief. (2) Variances shall only be issued upon: a. Showing a good and sufficient cause. b. A determination that failure to grant the variance would result in exceptional hardship to the applicant. c. A determination that the granting of a variance will not result in increased flood heights, additional threats to public safety, extraordinary public expense, create nuisances, cause fraud on or victimization of the public or conflict with existing local laws or ordinances. (3) Any applicant to whom a variance is granted shall be given written notice that the structure will be permitted to be built with the lowest floor elevation below the base flood elevation and that the cost of flood insurance will be commensurate with the increased risk resulting from the reduced lowest floor elevation. (i) Variances may be issued by the city for new construction and substantial improvements and for other development necessary for the conduct of a functionally dependent use provided that: (1) The criteria outlined in subsections (a)—(h) and (j) of this section are met, and (2) The structure or other development is protected by methods that minimize flood damage during the base flood and create no additional threats to public safety. (j) Variance may be issued for the repair or rehabilitation of historic structures upon a determination that the proposed repair or rehabilitation will not preclude the structure's continued designation as a historic structure and the variance is the minimum necessary to preserve the historic character and design of the structure. (k) In reviewing applications for variances, all technical evaluations, all relevant factors, all other portions of these regulations, and the following shall be considered: (1) The danger that materials and debris may be swept onto other lands resulting in further injury or damage. (2) The danger to life and property due to flooding or erosion damage. (3) The susceptibility of the proposed development, including contents, to flood damage and the effect of such damage on current and future owners. (4) The importance of the services provided by the proposed development to the community. (5) The availability of alternate locations for the proposed development that are not subject to flooding or erosion. (6) The compatibility of the proposed development with existing and anticipated development. (7) The relationship of the proposed development to the comprehensive plan and floodplain management program for that area. (8) The safety of access to the property in times of flood for ordinary and emergency vehicles. (9) The expected heights, velocity, duration, rate of rise and debris and sediment transport of the floodwaters and the effects of wave action, if applicable, expected at the site. (10) The costs of providing governmental services during and after flood conditions, including maintenance and repair of public utilities and facilities such as sewer, gas, electrical and water systems, streets, and bridges. (l) A variance is authorized to be issued for the construction or substantial improvement of at-grade accessory structures provided the requirements of this section and the following are satisfied: (1) A determination that the proposed accessory structure: a. Represents minimal investment and has low damage potential (amount of physical damage, contents damage, and loss of function). b. Is larger than the size limits specified in section 11-62(6). c. Complies with the wet floodproofing construction requirements of paragraph (l)(2) below. (2) Wet floodproofed structures shall: a. Be anchored to resist flotation, collapse, and lateral movement. b. Have flood damage-resistant materials below two feet above the base flood elevation. c. Mechanical, electrical and utility equipment are elevated two feet above the base flood elevation. d. Have flood openings in compliance with section 11-62(3).
(Ord. No. 2013-486, § 2, 8-20-13; Ord. No. 2025-477, § 3, 6-17-25)
Ask a question about Waco law
Corpus searches the Waco sections it holds and shows the ones that match, with their citations. Free, no sign-in.