For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 11-61 — General standards

Code of Ordinances of the City of Waco, Texas (Supp. No. 88: codified through Ordinance No. 2026-250, enacted April 21, 2026) · Waco City Code § 11-61

Corpus is an independent public-information project, not the official City of Waco website. Stable reference: corpuslaw.us/code/9f83946c-3b9a-4505-823d-0f37f38c2cfa

Sec. 11-61. - General standards.

(a) No development or construction of any kind may take place in an area of special flood hazard that will cause any adverse impact on any adjacent, downstream, or upstream property. (b) In all areas of special flood hazard the following provisions are required for all new construction and substantial improvements: (1) All new construction or substantial improvements shall be designed (or modified) and adequately anchored to prevent flotation, collapse or lateral movement of the structure resulting from hydrodynamic and hydrostatic loads, including the effects of buoyancy. (2) All new construction or substantial improvements shall be constructed by methods and practices that minimize flood damage. (3) All new construction or substantial improvement shall be constructed with materials resistant to flood damage. (4) All new construction or substantial improvements shall be constructed with electrical, heating, ventilation, plumbing and air-conditioning equipment and other service facilities that are designed and/or located so as to prevent water from entering or accumulating within the components during conditions of flooding. (5) All new and replacement water supply systems shall be designed to minimize or eliminate infiltration of floodwaters into the system. (6) New and replacement sanitary sewage systems shall be designed to minimize or eliminate infiltration of floodwaters into the system and discharge from the system into floodwaters. (7) On-site waste disposal systems shall be located to avoid impairment to them or contamination from them during flooding. (8) The proposed development shall not, at any time, diminish the storage volume within a special flood hazard area. Applicants shall demonstrate compliance with this requirement by submitting plans that demonstrate one or more of the following: a. Any loss of storage volume, including foundation volume, will be mitigated on-site, such that there is no net fill; b. Any loss of storage volume will be mitigated off-site, including foundation volume, in accordance with rules and regulations promulgated by the Floodplain Administrator; and/or c. Fill mitigation is not required with foundation construction if using elevated floor construction if it complied with section 11-62(3). (9) Storage of material in the floodplain: a. Storage of equipment and material is not allowed in the special flood hazard area; b. Any material stored on the site that is highly volatile, flammable, explosive, toxic or water reactive should be protected to at least the level of the 500-year flood.

(Ord. No. 2013-486, § 2, 8-20-13; Ord. No. 2025-477, § 4, 6-17-25)

Ask a question about Waco law

Corpus searches the Waco sections it holds and shows the ones that match, with their citations. Free, no sign-in.