Sec. 26-326. - Planning requirements for site construction.

(a) The stormwater pollution prevention plan (SWPPP) shall describe and ensure the implementation of practices that will be used to reduce the pollutants in stormwater discharges associated with construction activity at the construction site and assure compliance with the terms and conditions of a TCEQ or EPA stormwater permit. (b) Except as provided in subsection (2), a site specific storm water pollution prevention plan is required for all residential, commercial, and industrial developments that disturbs one acre or more, and on sites that disturbs less than 1.0 acre when the site is part of a larger development. (1) For the purpose of this section, the area of the development must include all land of a common plan of development, regardless of the amount of land that will be affected by the specific development activity. (2) A stormwater pollution prevention plan is not required when a portion of a previously developed tract of land is redeveloped, unless the redevelopment will result in the conversion of more than one acre from a porous surface to an impervious surface. (c) The stormwater pollution prevention plan must be prepared at the time of submission of the NOI or construction site notice. (d) The stormwater pollution prevention plan must identify the location of the outfall from the city's municipal separate storm sewer system into the receiving water and any environmentally sensitive areas that will receive any pollutants carried by stormwater pollution from the site. (e) The stormwater pollution prevention plan must state whether the plan or an erosion control plan will be submitted to the director of engineering under this section. (f) Development of sites one acre or more. (1) An NPDES or TPDES stormwater pollution prevention plan is currently required by EPA or TCEQ for all construction projects where one or more acres will be disturbed during development. Developments of sites that disturb one acre or more within the city's jurisdiction must prepare an NPDES or TPDES stormwater pollution prevention plan that satisfies EPA or TCEQ regulations and the NPDES or TPDES construction general permit. a. A copy of the NPDES or TPDES stormwater pollution prevention plan must be provided to the city's director of engineering, building official, or the appropriate city designee and/or inspectors upon request. b. A copy of the notice of intent (NOI) (sites > five acres) and/or construction site notice (sites one to five acres) provided to EPA or TCEQ must be provided to the director of engineering or the building official, as applicable. Approval of the elements of the NPDES or TPDES stormwater pollution prevention plan is not required. However, the director of engineering or building official, inspector or designated city representative may require correction of any observed deficiencies in the NPDES or TPDES stormwater pollution prevention plan, and may require additional measures in order to meet the requirements of section 26-327, pollution control measures. c. A copy of the notice of termination (NOT) if the current measures are insufficient (sites > five acres) submitted to EPA or TCEQ must be provided to the director of engineering or building official, as applicable. (2) Minimum requirement of a stormwater pollution prevention plan (SWPPP) can be found in the TPDES General Stormwater Requirements for Construction Activities dated March 05, 2003, or the most recent version as the regulations are updated. (g) Development of sites less than one acre, if part of a larger development. (1) All projects under this category must meet the requirements in section 26-327(a). (2) The area of the development will be based upon any or all of the following: platted lot(s), site plan of the development, phased-in name of the development and/or ownership of the property or, if not platted, based upon the area of the tract owned by the developer, including all contiguous property owned by the same person. Disturbance of a partial area of a tract is not a condition that will cause a change of the category in development size. (h) Development of sites less than one acre, if not part of a larger development. (1) An erosion control plan, as defined in section 26-325, is required for commercial construction, industrial construction, multi-family residential construction, and development of a residential subdivision within the city's jurisdictional area where less than one acre will be disturbed, when the site is not part of a larger development of an acre or more. The area of the development will be based upon platted lot(s), site plan of the development, phased-in name of the development, and/or ownership of the property or, if not platted, based upon the area of the tract owned by the developer, including all contiguous property owned by the same person. (2) Contractors are required to implement an erosion control plan that establishes erosion control measures. (3) The erosion control plan may include any measures as required to comply with pollution control measures specified in section 26-327. (i) Development of sites general requirements. (1) Implementation of the pollution control measures detailed in the plan is required. Inspection of the status of the pollution control measures will be performed by city personnel, during normal construction inspections, and at other times when construction activities may be conducted. (2) A certificate of occupancy may not be issued until the building official is satisfied that all temporary and permanent measures specified by the plan are complete. (3) The director of engineering will not accept any improvements required by the city's platting ordinance until the director of engineering is satisfied that all temporary and permanent measures specified by the plan are complete. (4) A pollution control plan is not required when a portion of a previously developed tract of land is redeveloped, unless the redevelopment will result in the disturbance of more than one acre of land.

(Ord. No. 2008-218, § 1, 4-15-08)