Sec. 26-327. - Pollution control measures.

(a) The responsible party of any construction site within the city shall implement measures necessary to control erosion, sedimentation, debris, and stormwater pollution. The responsible party is responsible for the maintenance and performance of the temporary pollution control measures until permanent measures are in place. The pollution controls are designed to be selected by the developer based on the most cost effective and appropriate means to provide the required controls. (b) Temporary pollution control measures (during construction). This subsection provides examples of temporary pollution control measures that can be used to control erosion and sedimentation. (1) Structural control of soil erosion. a. Stilt fences may be utilized, where necessary, to retain the sediments from disturbed areas within the site and decrease the velocity of sheet flows. b. Straw bales may be utilized, where necessary, to retain sediments from disturbed areas within the site and decrease the velocity of sheet flows. Straw bales are particularly useful in paved areas where silt fences cannot be erected. c. Stabilized construction entrances shall be designed to reduce the amount of soil tracked off the construction site by vehicles leaving the site. A stabilized construction entrance should be utilized, if necessary, to control tracking. The responsible party shall ensure that vehicles entering and leaving the construction site use the stabilized construction entrance. The owner or operator of a vehicle entering or leaving a construction site may not track soil off the construction site. d. Vegetative buffer strips, of appropriate size, should be maintained, where necessary and practical, to aid in reducing the velocity of stormwater and in trapping sediments in the stormwater leaving the site. A vegetative buffer will usually suffice as a structural control until final stabilization is accomplished. e. Inlet protection barriers must be installed around all inlets until the area immediately surrounding the inlet is paved or stabilized. (2) Waste controls. Waste disposal must be accompanied in a manner so that no solid wastes, including building materials, hazardous substances, oil, or packaging leave the site, except for disposal at an appropriate, approved solid waste management facility, in conformance with the Texas Solid Waste Disposal Act. To the extent practicable, no solid waste, including building materials, hazardous substances, or oil may be allowed to enter the city's municipal separate storm sewer system, the city's streets, or the navigable waters of the United States. Building materials include, but are not limited to, uncovered stockpiles of soil, sand, dry cement, lumber, bricks, packaging or other products used in construction. The general contractor and/or builder, who is issued the building permit, is responsible for the conduct of all subcontractors with regards to disposal of wastes generated by the construction activities at the site. (3) Dust control. Reasonable measures shall be taken to control dust, particulate matter, and windblown debris. (4) Hazardous material storage. Chemicals, paints, solvents, fertilizers, and other toxic materials must be stored in waterproof containers. Except during applications, the contents must be kept in trucks or in storage facilities. Runoff containing such materials shall be collected, removed from the site, and disposed of at an approved solid waste or chemical disposal facility. (5) Concrete trucks. The responsible party may not allow the owner or operator of a concrete truck to wash out or discharge surplus concrete or drum wash water at a construction site, unless the surplus concrete or drum wash water in concrete trucks is discharged at a facility on the construction site that will retain all concrete wash waters or leachates, including any wash waters or leachates mixed with storm water. Concrete wash waters and leachates may not be allowed to enter the municipal separate storm sewer system, city streets, the waters of the United States, or ground waters. (6) The responsible party may adopt alternative procedures, such as regularly scheduled street cleaning in the immediate vicinity of the construction site, instead of adopting temporary structural controls for erosion under subsection 26-237(b)(1). If alternative procedures are used, the responsible party shall include those provisions in its NPDES or TPDES stormwater pollution prevention plan, pollution control plan, or the plans submitted for a building permit, if an NPDES or TPDES stormwater pollution prevention plan or pollution control plan is not required. (c) Final pollution control measures (post construction). These measures stabilize construction sites where either of the following conditions are met: (1) All soil disturbing activities at the site have been completed and a uniform (e.g., evenly distributed, without large bare areas) perennial vegetative cover with a density of 70 percent of the native background vegetative cover for the area has been established on all unpaved areas and areas not covered by permanent structures, or equivalent permanent stabilization measures (such as the use of riprap, gabions, or goetextiles) have been employed. (2) For individual lots in a residential construction site by either: a. The homebuilder completing final stabilization as specified in condition (c)(1) above; or b. The homebuilder of single-family homes (zoned R-1, R-2, or R-E) establishing final stabilization for an individual lot by sodding the front yard with a vegetative cover with a minimum of 70 percent density (no bare spots) and installing a perimeter of sod for the remaining portions of the yard to prevent soil erosion, (3) For construction activities on land used for agricultural purposes (e.g., pipelines across crop or range land), final stabilization may be accomplished by returning the disturbed land to its pre-construction agricultural use. Areas disturbed that were not previously used for agricultural activities, such as buffer strips immediately adjacent to surface water and areas which are not being returned to their pre-construction agricultural use must meet the final stabilization conditions of condition (c)(1) above. (4) Acceptance of improvement by the city can occur before the final stabilization coverage requirement is met, if the developer agrees to maintain the stabilization until coverage is achieved and all other permanent measures are complete (i.e., performance bond). (5) Once final stabilization has been achieved, the responsible party shall notify the director of engineering, building official, or designated representative that final stabilization has been achieved. (6) Erosion control structures must be provided where necessary to control erosive velocities in unlined channels or swales leaving the site. (7) Sediment traps must be provided on the site, as necessary, to control sedimentation from concentrated storm water discharges into an environmentally sensitive area. Individual assessments must be made on a site-specific basis. However, a rock rubble low berm must be installed around an outfall that discharges directly into an environmentally sensitive area, unless this requirement is waived by the director of engineering because the responsible party has installed another type of sediment trap that provides equal or better protection. (d) Scheduling of control measures. Pollution control measures must be implemented in a sequence that will provide maximum stormwater pollution control based on the following principles: (1) Down slope and side slopes perimeter controls must be installed before land disturbing activity occurs. (2) The responsible party shall not disturb the site until the responsible party is ready for construction to proceed. (3) Efforts to provide cover or stabilize disturbed areas must occur as soon as possible. (4) Temporary perimeter controls may not be removed until all upstream areas are permanently stabilized.(4) (e) Inspection of pollution control measures. The responsible party shall inspect all pollution control measures every 14 days and within 24 hours following a rainfall of 0.5 inches or greater, at the site, or every seven days regardless of rain events and maintain a record of each inspection. The inspection reports are to be considered part of the contractor's stormwater pollution plan (SWPPP), and as such, are subject to the same record retention schedule and availability requirements of the SWPPP. The inspection reports, as well as, the entire SWPPP shall be made available for inspection by a representative of the city, during normal business hours. (f) Maintenance of pollution control measures. (1) The responsible party shall maintain and ensure adequate performance of the temporary pollution control measures until permanent pollution control measures are in place. (2) Whenever the temporary or permanent pollution control measures do not keep soil, sediment, and debris on the construction site, such as excessive tracking of dirt offsite by vehicles and runoff of sediments from the site over sidewalks and into the streets and gutters, etc., the responsible party shall remove the soil, sediment, and debris from streets, sidewalks, and inlets, as necessary, return the soil and sediment to the areas to be stabilized, and properly dispose of the debris. (3) The responsible party is responsible for the maintenance of any permanent pollution control measures located on the site, unless the owner has dedicated the permanent pollution control measure to the city and has provided the city with any easements necessary to allow access to the permanent pollution control measure and to conduct any required maintenance activities.

(Ord. No. 2008-218, § 1, 4-15-08)

Ask a question about Waco law

Corpus searches the Waco sections it holds and shows the ones that match, with their citations. Free, no sign-in.