Sec. 5.2. - Permanent improvements.

5.201. Utilities: A) Water facilities. 1) Public water lines shall be installed to serve each lot in all subdivisions. New water lines shall be installed in accordance with the most recently adopted guiding documents. 2) Before the city plan commission approves a final plat for a subdivision located outside of or beyond areas served with water utilities, the subdivider may be required to furnish the city plan commission satisfactory evidence including, but not limited to, statements from officials of the water districts) serving the area to be subdivided that they will make water available to the proposed subdivision. B) Sanitary Sewer Facilities. Public sanitary sewer lines shall be installed to serve each lot in all subdivisions within the city limits of Waco and Waco's Extraterritorial Jurisdiction if required by 5.201(2) in accordance with the most recently adopted guiding documents. 1) Waco's Extraterritorial Jurisdiction: a) Sanitary sewer lines shall be immediately installed and connected to a public sewer line, at the expense of the subdivider of the property, if the lot is within 500 feet of a public sewer line. b) Sanitary sewer lines shall be immediately installed and connected to a public sewer line, at the expense of the subdivider of the property, if the lot is less than one acre in size. c) All lots not immediately connected to the sanitary sewer system shall use an on-site sewage facility (OSSF). Lots shall be a minimum of one acre in size if effluent disposal is to be by subsurface soil absorption or surface irrigation and this type of effluent disposal meets regulations and standards set forth by the Waco-McLennan County Health District, the State Health Department, and the Texas Commission on Environmental Quality (TCEQ), as well as any additional regulations and standards set forth herein. Existing lots or tracts of land being platted as of September 1, 2020 under one acre in size may effluent disposal by subsurface soil absorption or surface irrigation subject to meeting regulations and standards set forth by the Waco-McLennan County Health District, the State Health Department, and Texas Commission on Environmental Quality (TCEQ). d) Before the plan commission approves a final plat for any lots that are not immediately served by public sanitary sewer, and have received variance approval for the lots to be under one acre in size, the subdivider shall be required to furnish the plan commission, satisfactory evidence including, but not limited to, the results of soil tests and borings, and statements from the Waco-McLennan County Health District and/or State Health authorities, environmental engineers and other proper officials, that soil conditions are such that satisfactory sewage disposal can be provided by the use of an approved on-site sewerage facility (OSSF). All on-site sewerage facilities shall be designed, installed and operated in accordance with the rules, regulations, and standards prepared by the Waco-McLennan County Health District, the State Health Department and the Texas Commission on Environmental Quality (TCEQ). Test locations and soil test results shall be submitted for approval to the Waco-McLennan County Health District, OSSF Program Office. The required evidence shall serve as the basis for approval of the certification as referred to in Section 3.303(A)(18). The following statement shall be placed on the final plat: "The following statement certifies that an engineering suitability report prepared by ___________, on the ________ day of _____, _______, has been submitted and accepted for this subdivision plat. Individual On-Site Sewage Facility designs must be submitted for approval for each lot, and built to Texas Commission on Environmental Quality (TCEQ) regulations prior to occupation of the residence. This subdivision plat approved and accepted by City of Waco Utility Services for the Waco-McLennan County Health District on this the day of ___________." ___________ (Signature, Environmental Coordinator Waco-McLennan Public County Health District) The statement shall be signed by the appropriate official of the Waco-McLennan County Public Health District or designee. e) All design work done in connection with sewage disposal systems shall be performed by persons qualified under State of Texas law to do such work. 5.202. Land drainage facilities: A) In any subdivision, adequate drainage facilities shall be installed or financially guaranteed by the developer before the plat is given final approval by the city plan commission and filed for record. B) Drainage easements. The developer shall furnish any drainage easements across adjacent tracts of land necessitated by the subdivision and development of the property. C) All drainage facilities shall conform to the most recently adopted guiding documents. 5.203. Parks, playgrounds and recreational areas: The city plan commission may require the dedication of up to five percent of the area of a subdivision for recreational purposes. Acceptance of formal offers of dedication of park land shall be by ordinance; the approval of a subdivision plat by the city plan commission shall not be deemed to constitute the acceptance by the city of any public area or park offered for dedication on the plat. No plat offering such dedication shall be filed for record unless and until the Waco City Council has accepted the dedication by ordinance. 5.204. Alleys: A) In residential blocks. Alleys may be required in residential blocks only where necessary to provide access to an existing alley in an adjacent subdivision. B) In nonresidential areas. Alleys or loading areas may be required in blocks used for commercial purposes. C) Alley construction standards. Alleys shall be designed and constructed in accordance with the most recently adopted guiding documents. 5.205. Streets: The developer shall provide the subdivision with adequate streets. The arrangement, character, extent, width, grade and location of proposed streets shall conform to the master thoroughfare plan of the City of Waco in accordance with Sec. 212.010.(c) of the Texas Local Government Code. All streets shall be designed in accordance with the most recently adopted guiding documents, and with consideration for topography, public safety and convenience, the proposed use(s) of the land to be served, recommendations of any associated Traffic Impact Analysis, and other streets existing and planned. If any part of an arterial street or freeway shown on the major street plan, lies in or adjacent to the proposed subdivision, that part of the street shall be platted and dedicated to the width and at the location shown on the plan in accordance with Sec. 212.010.(c) of the Texas Local Government Code. A) Street names and signs. New streets shall be named so as to provide continuity with the names of existing, connecting streets. Names identical or similar to names of existing streets shall not be approved. The developer shall confirm all proposed street names with McLennan County Emergency Assistance District (911) so as to avoid duplication. The city plan commission shall have the final authority to designate the name of a proposed street. The developer shall provide and install street name signs at the cost of the developer, in accordance with City standards and specifications. Within the City corporate limits, the City of Waco shall be responsible for the maintenance and replacement of the street name signs upon acceptance of the subdivision by the City of Waco. B) Street layout. The subdivision street layout shall be designed with consideration for its probable effect on existing neighborhoods and on the future development of adjacent areas. Local streets shall be configured to accommodate traffic within the subdivision, such as with curvilinear streets; collector streets shall accommodate through traffic and provide connections to arterial streets; and, unless otherwise required by the city plan commission, existing arterial streets shall be extended through the subdivision in accordance with Sec. 212.010.(c) of the Texas Local Government Code. C) Relation of new streets to adjacent streets and property. Streets provided for the subdivision shall, unless determined otherwise by the city traffic engineer and the city plan commission, connect with and be at least as wide as existing streets in adjacent subdivisions, or shall be the reasonable projection of streets in the nearest subdivided tracts. Streets shall be continued to the boundaries of the tract being subdivided to provide points of connection for streets in subsequently developed areas. If a subdivision includes one or more lots of sufficient size to allow further subdivision, the city plan commission may require ingress/egress access easements to provide for the opening of new streets and/or the extension of adjacent streets. D) Intersections. All intersections shall be designed and constructed in accordance with the most recently adopted guiding documents. E) Street grade. All street grades shall be designed and constructed in accordance with the most recently adopted guiding documents. F) Street and alley cross sections. 1) All street cross sections shall comply with the most recently adopted guiding documents. 2) All alley cross sections shall comply with the most recently adopted guiding documents. G) Curve requirements. 1) All streets and alleys shall comply with curve requirements of the most recently adopted guiding documents. H) Street right-of-way and paving width requirements. The right-of-way widths outlined in the most recently adopted guiding documents represent minimum requirements for dedicated right-of-way widths. These minimums may be increased or decreased by the city engineer where conditions warrant. Determinations of street classification shall be made by the city engineer and the city plan commission and shall be based on the needs of the subdivision, the comprehensive plan, the existing street classification system map and the master thoroughfare plan. 1) Extraterritorial jurisdiction (ETJ). Minimum dedicated right-of-way widths, or permanent ingress/egress access easement widths, shall comply with the most recently adopted guiding documents for all subdivisions platted within the City of Waco's extraterritorial jurisdiction (ETJ). Permanent ingress/egress access/or roadway easements for private use recorded prior to March 4, 1997 will not be required to conform to City of Waco construction standards. The acceptance of the subdivision plat will not constitute any legal duty or responsibility to maintain this roadway by the City of Waco or McLennan County. The maintenance of the street will be the duty and responsibility of the property owner. New permanent ingress/egress access/or roadway easements for public or private use recorded after March 4, 1997 will be required to meet the minimum requirements for streets provided for by this ordinance unless exempted by the city engineer. Existing public streets and unrecorded permanent ingress/egress access easements will be required to meet these minimum requirements unless exempted by the city engineer. Additional right-of-way or ingress/egress access easements may be required by the city engineer where the conditions warrant such. It is further provided that as to subdivision plats in Waco's extraterritorial jurisdiction (ETJ), that the developer/owner may subdivide property as required herein by dedicating permanent ingress/egress access easements which connect to a dedicated right-of-way. The dedication shall reflect that the permanent ingress/egress access easement is in lieu of a public dedicated right-of-way. The dedication shall also place the purchaser on notice that no governmental entity shall ever be responsible to repair, maintain or reconstruct said permanent ingress/egress access easements. The dedication shall state that the expenses for the repair, maintenance, or reconstruction of the permanent ingress/egress access easements will be the responsibility of the homeowners association (name shown on the plat), organization or individual homeowners. 2) City of Waco. Minimum dedicated right-of-way widths shall comply with the most recently adopted guiding documents for all subdivisions platted within the City of Waco. Permanent ingress/egress access easements will only be allowed within a planned unit development in the City of Waco and will be required to meet the minimum requirements for streets in this ordinance unless exempted by the city engineer. Existing streets and permanent ingress/egress access easements will be required to meet the requirements outlined within the guiding documents unless exempted by the city engineer. Additional right-of-way may be required by the city engineer where the conditions warrant such. 3) Extraterritorial jurisdiction. Paving widths by street classification in the extraterritorial jurisdiction shall be in accordance with the most recently adopted guiding documents. 4) City of Waco. Paving widths by street classification in the City of Waco shall be in accordance with the most recently adopted guiding documents. I) Special purpose streets. 1) Marginal access streets. Marginal access streets shall be in accordance with the most recently adopted guiding documents. 2) Cul-de-sacs. A local street with only one outlet and having a terminal for safe, convenient reversal of direction. A street terminating in a cul-de-sac may be no more than 600 feet in length. The cul-de-sac street shall be in accordance with the most recently adopted guiding documents. 3) Dead-end streets. Dead-end streets shall be avoided unless future extensions of the street is planned. When a street extension into an undeveloped area is planned, the developer may be required to build the street and construct a temporary paved surface, turnaround at the end with proper barricading and warning signs, provide proper barricading in the absence of a turnaround, or post a security bond in accordance with Section 5.209 of this Ordinance. It will be the responsibility of the developer to secure adequate easement or right-of-way for any temporary turnarounds. Dead-end streets shall not exceed 1,000 feet in length. 3A) In Waco's Extraterritorial Jurisdiction, where an existing street terminates at a cul-de-sac that provides access to no more than 3 properties and where no street extension is planned, such cul-de-sac may be constructed to the same standard as the existing street. 3B) The types of cul-de-sac styles may be hammerhead, knuckle, L-shaped or standard. The style and dimension of the cul-de-sac must be approved by the city engineer and shall be in accordance with the most recently adopted guiding documents. 4) Service road. A lesser classified functioning street which is usually parallel and adjacent to a limited access freeway and functions as an integral part of that system. It provides protection from through traffic to abutting properties and is situated within the right-of-way of that higher classified system. Right-of-way and paving widths to be determined by the Texas Department of Transportation. J) Street construction standards within the corporate limits. Streets within the corporate limits shall be constructed in accordance with the most recently adopted guiding documents. Permanent ingress/egress access easements will be required to meet the minimum requirements for streets in this ordinance unless exempted by the city engineer. K) Street construction standards for Waco's extraterritorial jurisdiction. Streets and ingress/egress access easements (except as provided in Section 205(H)(1)) which provide primary access to lots in Waco's extraterritorial jurisdiction shall be constructed in accordance with the most recently adopted guiding documents with the following exceptions: 1) Boundary streets already constructed to county standards shall not require reconstruction. 2) Except as provided in Section 205(H)(1), permanent ingress/egress access easements will be required to meet the minimum requirements for streets in accordance with the most recently adopted guiding documents, unless exempted by the city engineer. L) Participating aid policy. Street construction in new subdivisions shall be paid for on the following basis: 1) The developer shall pay all construction costs for streets no wider than 40 feet from face of curb to face of curb. 2) Dedication of streets wider than 40 feet from face of curb to face of curb may be required of the developer, but the city shall assume responsibility for any costs above those of constructing the street to a width of 40 feet. M) Traffic control devices. The developer shall provide and install traffic control devices (excluding any traffic signal system, unless such system is required to mitigate the impact of traffic resulting from the subdivision) at the cost of the developer. The traffic control devices shall be installed in accordance with the current version of the Texas Manual on Uniform Traffic Control Devices or as determined by the city traffic engineer. Within the city corporate limits, the City of Waco shall be responsible for the maintenance and replacement of the traffic control devices upon acceptance of the subdivision by the City of Waco. 5.206. Curb and gutter: A) Requirement conditions. 1) Within the corporate limits, curb and gutter shall be constructed (or bonded for future construction, in accordance with Section 5.209 of this ordinance, along all streets except those in subdivisions where all lots are at least one acre in area, have at least 150 feet of street frontage and are intended for single-family residential use only. 2) Within Waco's extraterritorial jurisdiction, curb and gutter shall be provided along all streets except existing boundary streets constructed to county standards and accepted by the county, or streets in subdivisions where all lots are at least one acre in area, have at least 150 feet of street frontage, and are intended for single-family residential use only. B) Construction standards. 1) Curb and gutter shall be constructed in accordance with the most recently adopted guidance documents. 5.207. Sidewalks: A) Sidewalks shall be installed as follows: 1) On the subdivision side of all arterial and collector streets adjacent to the subdivision. 2) On the subdivision side of all streets within the area designated as the central business district. 3) On all subdivisions and developments that have significant pedestrian activity, as deemed necessary by the city plan commission and city engineer. 4) In new subdivisions, as determined by the layout of streets on the preliminary plat and by zoning density or projected land use. 5) Should the preliminary plat be modified so that sidewalks are called for in a development phase completed after January 1, 2009, but before the modification of the preliminary plat, sidewalks must be constructed in that previously completed development phase before subsequent phases can be platted. 6) Such additional sidewalks as the subdivider may desire. B) Construction standards. Sidewalks shall be constructed in accordance with the most recently adopted Guidance Documents. C) Other requirements. 1) Sidewalks required in new subdivisions will extend to logical termination points, such as street intersections. Sidewalk widths shall be in accordance with the guiding documents. 2) Sidewalks will be constructed as part of the subdivision infrastructure. Repairs will be made as necessary as improvements are placed on lots. D) Other law; infill area requirements. 1) The conditions and requirements set forth in this subsection 5.207 shall be in addition to, and shall not waive, the conditions and requirements set forth or Chapter 22, Article III "Sidewalks, Curbs, Gutters, Driveways" of the Code of Ordinances, City of Waco, Texas. 2) In the event of a conflict between this subsection 5.207 and Chapter 22, Article III, "Sidewalks, Curbs, Gutters, Driveways" of the Code of Ordinances, City of Waco, Texas, Chapter 22, Article III shall govern. 5.208. Cost of improvements: All required improvements shall be furnished by the developer at his/her expense, without reimbursement by the city, except through special refund policies established by the Waco City Council. 5.209. Assurance of completion and maintenance of improvements: Before a plat is approved by the city plan commission and filed with the county clerk, the developer shall be required either to complete all required improvements or to submit a performance guarantee in an amount sufficient to pay for the construction and installation of required improvements. A) Completion of improvements without performance guarantee. If the developer chooses to complete improvements without submitting a performance guarantee the following requirements must be met before the plat is approved by the city plan commission and filed for record: 1) All required improvements shall be completed to City of Waco Guiding Documents. 2) A final inspection of completed improvements shall be performed by the city engineer or his representative, and work must be approved and/or accepted by the City of Waco. The developer shall maintain all improvements until improvements have been accepted by the City of Waco. 3) The general contractor shall submit a letter to the city engineer certifying that all construction bills have been paid, and materials and workmanship are guaranteed for one year. 4) Complete record drawing plans of required improvements have been submitted to and approved by the city engineer. B) Performance guarantee. If the developer wishes to have a subdivision plat approved by the city plan commission and filed for record before required improvements are completed and accepted for maintenance by the City of Waco, the developer shall submit to the city a guarantee of performance to be approved by the city attorney and the city engineer. 1) Types of performance guarantee. The developer may choose to provide the funds to guarantee construction (cash, cashiers check, cash bond, surety bond or other type of depositary agreement), or to contract with an approved financial institution to guarantee satisfactory completion of improvements (letter of credit or subdivision performance bond). 2) Duration of performance guarantee. The duration of the performance guarantee shall equal the length of time estimated to be necessary for the completion of all required improvements and shall be agreed upon in writing by the developer, the city engineer, the city attorney, and a legal representative of the financial institution involved (if any). If required improvements are not complete by the expiration date of the guarantee, the city may require cash payment by the developer or surety company, or may require an extension of the guarantee for a specific period of time. 3) Amount of performance guarantee. a) When required improvements are to be constructed by the developer, the amount of the performance guarantee shall be based on estimate of construction costs, with a stamped or embossed seal by a professional engineer registered in the State of Texas. The amount shall be 125% of the engineer's cost estimate, sufficient to insure satisfactory construction and installation of required improvements, and shall be approved by the city engineer, director of planning, and the city attorney. b) Where required improvements are to be made by the City of Waco, the city engineer shall determine the construction cost and the amount of the performance guarantee. 4) Release of performance guarantee. The performance guarantee shall be unconditionally released by the City of Waco when: a) An inspection fee in the amount designated in section 5.210, and b) All improvements have been completed, and c) A final inspection of completed improvements has been performed by the city engineer or an official representative and the work has been approved and/or accepted for maintenance by the City of Waco, and d) A letter has been submitted to the city engineer by the developer's general contractor stating that all construction bills have been paid and all improvements are free of all liens and encumbrances, and e) Complete record drawing plans of required improvements have been submitted to and approved by the city engineer. 5.210. Inspection fee: Inspection fees shall be set by the city council as part of the annual budget or by minute entry and paid to the City of Waco.

(Ord. No. 1997-6, § 1, 3-4-97; Ord. No. 1999-2, § 1, 2-16-99; Ord. No. 2002-0489, § 3, 8-20-02; Ord. No. 2003-0091, § 1, 2-4-03; Ord. No. 2008-606, § 3, 11-4-08; Ord. No. 2013-484, § 3, 8-20-13; Ord. No. 2017-980, § 4, 11-7-17; Ord. No. 2019-533, § 18, 9-3-19; Ord. No. 2020-607, § 1, 9-1-20; Ord. No. 2023-484, § 2, 6-20-23; Ord. No. 2023-610, § 2, 8-15-23; Ord. No. 2025-477, § 19, 6-17-25)