§ 5.4 — Approved construction plans and specifications and record drawing plans

Code of Ordinances of the City of Waco, Texas (Supp. No. 88: codified through Ordinance No. 2026-250, enacted April 21, 2026) · Waco City Code, App. B, pt. V, § 5.4

Corpus is an independent public-information project, not the official City of Waco website. Stable reference: corpuslaw.us/code/c4aee456-424b-406f-bac2-e9068fd72b02

Sec. 5.4. - Approved construction plans and specifications and record drawing plans.

5.401. Approved construction plans. The required number of copies of the approved plans and specifications for each required improvement shall be furnished to the city department of public works before construction begins on that improvement. 5.402. Record drawing plans. Upon completion of construction of all improvements, the developer shall furnish record drawing plans in electronic Portable Document Format to the city department of public works for review and approval. These plans shall include a statement by the registered professional engineer responsible for their preparation that the plans reflect changes as reported by the entity responsible for inspection. The record drawing plans shall also have final elevations of wastewater systems and stormwater drainage systems including upstream and downstream flowline elevations, elevations of inverts and manholes, and elevations of top of pipe at an increment not to exceed 500 feet with a statement by the registered professional land surveyor responsible for the survey that the elevations provided are correct.

(Ord. No. 2019-533, § 19, 9-3-19; Ord. No. 2023-484, § 2, 6-20-23; Ord. No. 2023-610, § 2, 8-15-23)