§ 16-9-4 — GENERAL REQUIREMENTS
City Code of Ogden City, Utah (2026 S-26: code current through Ord. 2026-7, passed May 5, 2026) · Ogden City Municipal Code § 16-9-4
Corpus is an independent public-information project, not the official City of Ogden website. Stable reference: corpuslaw.us/code/4dfa8631-e7ec-43eb-89e6-4616c2da0524
16-9-4: GENERAL REQUIREMENTS:
All permittees shall comply with the following requirements: A. Water Line Disconnect Fee: A water line disconnection fee must be paid to water utility prior to making an application for permit. B. Permit Required: A demolition or moving permit must be obtained by a licensed contractor or special restricted permittee before the work is begun. C. Bond Posted: A surety bond, cashier's check, or a cash bond must be posted with the inspection services division. This bond is to secure compliance with the terms of this chapter. Special circumstances may require special bonds. Otherwise, the following bond schedule will apply: Floor Area Of Structure Amount Up to 2,000 square feet $ 2,000.00 2,001 to 10,000 square feet 10,000.00 Over 10,000 square feet 20,000.00 D. Release Of Bond: The bond will be released within ten (10) days after certification, by the inspection services division, of the successful completion of the demolition or moving project. E. Safe Condition Maintained: All buildings and structures shall be secured and maintained in a safe condition, both prior to and during demolition or moving. F. Protection Of Pedestrian Traffic: During the course of the demolition or moving, all precautions must be taken to protect pedestrian traffic, adjacent property and structures. Covered walkways will be constructed when required by the inspection services division for pedestrian protection. G. Dust Control: All demolition projects must have means of controlling dust on the job site. H. Removal Of Debris: The building being demolished and the foundation of the building being moved must be removed from the job site. This includes the basement floor and footings. No debris from the building will be allowed to be buried in any basement or cellar space. I. Sewer Lateral Uncovered: 1. The sewer lateral must be uncovered by the contractor/owner at the property line. Upon notification, the sewer division will cap the exposed line at no additional fee. If the sewer division is not contacted to cap the line, the contractor/owner will be required to show that the lateral has been properly capped before the bond will be released. 2. The sewer lateral must be uncovered and properly capped by the contractor/owner within five feet (5') of the property line. This cap must remain exposed until inspected and approved by the sewer division or inspection services division and inspection approval is required before the bond may be released. (1979 Code § 16.37.040; Ord. 88-46, 12-1-1988; amd. Ord. 92-6, 1-9-1992; Ord. 95-25, 5-16-1995; Ord. 98-15, 2-17-1998)
Ask a question about Ogden law
Corpus searches the Ogden sections it holds and shows the ones that match, with their citations. Free, no sign-in.