16-9-5: COMPLETION OF PROJECTS:
A permit for demolition or moving requires that all materials comprising part of the existing structure, including the foundation and footings, must be removed from the site. The depression caused by removal of such debris must be filled back and compacted to the original grade, as approved by the inspection services division, with granular fill. The work must be completed, including filling and leveling back to grade and removal of required pedestrian walkways and fences within the permit period, unless the inspection services division: A. Finds that any part of the foundation of the building will form an integral part of a new structure to be erected on the same site for which plans have already been approved by the inspection services division, in which case it may approve plans for the appropriate adjustment and may impose reasonable conditions, including the posting of a bond, erection of fences, securing, etc., to guarantee the site does not create a hazard. B. Finds that new construction will shortly commence and approves the continuance of the protective pedestrian walkway. C. Finds that the foundation, footings or existing retaining walls are integral to the support of adjacent sidewalks, streets, legal easements, or buildings, in which case the inspection services manager may permit such supporting structures to remain. (1979 Code § 16.37.050; Ord. 88-46, 12-1-1988; amd. Ord. 92-6, 1-9-1992; Ord. 95-25, 5-16-1995; Ord. 98-15, 2-17-1998)
Ask a question about Ogden law
Corpus searches the Ogden sections it holds and shows the ones that match, with their citations. Free, no sign-in.