7-5-12: RESTORATION OF PUBLIC PROPERTY:

The permittee shall, at its own expense, complete work site restoration of the surface of any public way to its original condition and replace any removed or damaged pavement with the same type and depth of pavement as that which is adjoining, including the gravel base material. A. All restoration shall conform to the engineering regulations, design standards and specifications promulgated by the city and shall be accomplished within the time limits set forth in the permit, unless additional time is granted in writing by the city engineer. B. Work site restoration includes, but is not limited to: 1. A road patch that extends two feet (2') beyond the limits of any excavation, including undermining, where the excavation is up to four feet (4') in depth; 2. A road patch that extends three feet (3') beyond the limits of any excavation, including undermining, where the excavation is more than four feet (4') in depth; 3. A road patch encompassing all excavation and extending across the entire width of the roadway, and complying with the requirements of subsection C1 or C2 of this section, if multiple road cuts are made as part of the permitted work; and 4. Additional pavement removal and extension of the road patch to the limit of the location indicated if the edge of the patch would terminate within two feet (2') of: a. A painted stripe; b. Lip of gutter; c. A curb; d. An existing pavement patch; e. Another saw cut; or f. Deteriorated asphalt. C. If the public way is under a construction moratorium due to road construction or reconstruction within the past five (5) years or application of a seal coat within the past three (3) years, work site restoration also includes: 1. A fifty foot (50') wide road patch on either side of the excavation with the road patch extending across the entire width of the roadway; and 2. If the roadway is under a chip seal coat moratorium, the permittee shall also reapply the seal coat over the patch. D. When a road patch is required, the patch shall: 1. Match the thickness of the existing aggregate base; and 2. Match the thickness of the existing asphalt plus one inch (1"), provided that the asphalt patch may not have a thickness of less than four inches (4") or more than seven inches (7"). (Ord. 2015-34, 7-7-2015)

Ask a question about Ogden law

Corpus searches the Ogden sections it holds and shows the ones that match, with their citations. Free, no sign-in.