§ 7-5-5 — FEE FOR PERMIT
City Code of Ogden City, Utah (2026 S-26: code current through Ord. 2026-7, passed May 5, 2026) · Ogden City Municipal Code § 7-5-5
Corpus is an independent public-information project, not the official City of Ogden website. Stable reference: corpuslaw.us/code/e66f04ac-967b-481e-9254-59ccdb351527
7-5-5: FEE FOR PERMIT:
A. Required: The City shall charge and the permittee shall pay upon issuance of the permit, fees for costs associated with the work performed under the permit as outlined in Title 4, Chapter 6 of this Code. Such costs could include costs for reviewing the project and issuing the permit, inspections of the project, deterioration of the public way or diminution of the useful life of the public way, and other costs to the City associated with the work to be done under the permit. All costs shall be assessed in a nondiscriminatory manner. B. Additional Charges: Additional charges to cover the reasonable cost and expenses of any required engineering review, inspection, and work site restoration associated with each undertaking may be charged by the City to each permittee, in addition to the permit fee. C. Exception: Permit fees shall not be applicable to work performed by or under contract to the City. (1979 Code § 12.10.050; Ord. 97-70, 9-23-1970)
Ask a question about Ogden law
Corpus searches the Ogden sections it holds and shows the ones that match, with their citations. Free, no sign-in.
