§ 18-101 — Development site plans required; exceptions
Code of the City of Chesapeake, Virginia (Supp. No. 148: codified through Ordinance No. 26-O-071, enacted August 11, 2026) · Chesapeake Zoning Ordinance § 18-101
Corpus is an independent public-information project, not the official City of Chesapeake website. Stable reference: corpuslaw.us/code/0797a1fd-b564-46e5-abd3-446e7d45cac3
§ 18-101. - Development site plans required; exceptions.
A. General requirement. A preliminary and final site plan shall be required for any construction, use, change in use or other development in all zoning districts; provided, however, that no such plan shall be required for those instances listed in subsection (B). The directors of planning and development and permits shall consult with the installation commander of any military installation that will be affected by potential development within the city so as to reasonably protect the military installation against any adverse effects that might be caused by the development. B. Exceptions; requirements. A preliminary and final site plan shall not be required in the instances set out in subsection C. below. However, certain plans may be required by the director of development and permits, or designee, as necessary to ensure that applicable development criteria are met; or as part of a building permit application, as described in section 18-600 et seq. of this ordinance. A phase I environmental site assessment, prepared in compliance with the specifications in the Chesapeake Public Facilities Manual, shall be required for every proposed development that involves any land disturbance for residential, assembly, day care, group home, recreation, school, library, or similar use where exposure to contaminated soil or water would pose a threat to the public health, safety and welfare; provided that the director of development and permits, with the concurrence of the director of public works, may waive this requirement if the following conditions are satisfied: a. The applicant/owner submits documentation, in a form acceptable to the director of development and permits and director of public works, requesting to waive the phase I environmental site assessment and demonstrating that the proposed land disturbance does not pose a significant risk to the environment or the public health and safety; and b. The applicant/owner signs and submits documentation, in a form acceptable to the city attorney, assuming all risk and indemnifying and holding the city harmless for any actions or liability that result from such waiver. Where deemed necessary, the director of public works or designee shall require a phase II environmental site assessment, as specified in the Chesapeake Public Facilities Manual. The phase I and phase II reports shall include recommendations to address any and all environmental conditions of the property, including without limitation, contaminated soil, surface water, or groundwater, that may be adverse to the public health, safety and welfare. In the event a phase I and/or phase II environmental site assessment has been previously submitted to the city for the same property, such environmental site assessment may suffice if updated in accordance with applicable standards in the Chesapeake Public Facilities Manual. C. Specific exemptions. The following developments are exempt from the requirement for a complete preliminary and final site plan. 1. The construction or location of any single-family detached dwelling or two-family dwelling on an existing or platted lot not occupied by any other dwelling. 2. Any accessory structure to a single-family or two-family dwelling. 3. Any agricultural activity except as otherwise provided in this zoning ordinance. 4. A change in or expansion of a use on an existing site other than a modification or expansion regulated by section 17-111, unless: a. The sale or storage of gasoline or hazardous materials is involved as part of the use; or b. The zoning administrator or designee determines that such change or expansion gives rise to the need for additional parking or off-street loading under the requirements of this zoning ordinance, in which case the provisions of section 19-402.B shall apply; or c. In the case of an expansion not regulated by section 17-111, the expansion exceeds twenty-five (25) percent of the gross floor area of the existing building or of the area occupied by the use; or d. The director of development and permits, or designee, requires additional ingress/egress, change in ingress/egress or additional public improvements because of the nature of the change in the use; or e. Additional ingress/egress or alteration of existing ingress/egress is proposed. f. The director of public utilities or designee requires the extension of utility service or modification of existing service to support the change in, or expansion of, the use. 5. Deposit and contouring of fill on land, provided that: i) The directors of development and permits and public utilities, or designees, determine that the fill activity will not adversely impact existing public facilities; and ii) All other regulations of the city are met. 6. Any permitted use of a temporary nature for a period not to exceed one (1) year. However, certain temporary uses, such as outdoor sales (covered in article 13), may be subject to regulations of this zoning ordinance or other chapters of the City Code which require the submission of a site plan.
(Ord. No. 95-O-074, 4-18-95; Ord. No. 03-O-029, 3-18-03; Ord. No. 04-O-124, 8-17-04; Ord. No. 05-O-130, 10-18-05; Ord. No. 09-O-051, 5-19-09; Ord. No. 10-O-127, 10-19-10; Ord. No. 13-O-089, 8-13-13; Ord. No. 22-O-124, 12-20-22)
Ask a question about Chesapeake law
Corpus searches the Chesapeake sections it holds and shows the ones that match, with their citations. Free, no sign-in.