§ 18-301. - Contents of final site plans.

A. Preparation by licensed professional. Final site plans, together with amendments thereto, shall be prepared by a professional engineer, or land surveyor with a 3(b) license, licensed to practice in the commonwealth of Virginia. B. Technical requirements. 1. Final site plans shall be prepared on such materials and format as the director of development and permits, or designee, may specify, with the number of copies that the director prescribes. 2. The final site plan shall reflect all those elements approved on the preliminary site plan. In addition, it shall include those specific construction plans and other technical information which are specified by the director of development and permits, or designee. All plan information regarding public utilities lines and installations shall conform with the requirements of the public utilities director as well. For condominium and apartment developments, design for on-site pavement, drainage and related improvements shall be based upon soil boring information and design methods approved by the director of development and permits, or designee. C. Environmental site assessments. A phase I environmental site assessment, prepared in compliance with the specifications in the Chesapeake Public Facilities Manual, shall be required for every proposed development that involves any land disturbance for residential, assembly, day care, group home, recreation, school, library, or similar use where exposure to contaminated soil or water would pose a threat to the public health, safety and welfare; provided that the director of development and permits, with the concurrence of the director of public works, may waive this requirement if the following conditions are satisfied: a. The applicant/owner submits documentation, in a form acceptable to the director of development and permits and director of public works, requesting to waive the phase I environmental site assessment and demonstrating that the proposed land disturbance does not pose a significant risk to the environment or the public health and safety; and b. The applicant/owner signs and submits documentation, in a form acceptable to the city attorney, assuming all risk and indemnifying and holding the city harmless for any actions or liability that result from such waiver. Where deemed necessary, the director of public works or designee shall require a phase II environmental site assessment, as specified in the Chesapeake Public Facilities Manual. The phase I and phase II reports shall include recommendations to address any and all environmental conditions of the property that may be adverse to the public health, safety and welfare, including without limitation, contamination of soil, groundwater or surface water. In the event a phase I and/or phase II environmental site assessment has been previously submitted to the city for the same property, such environmental site assessment may suffice if updated in accordance with the standards in the Chesapeake Public Facilities Manual. D. Statements on final plans. In addition to notes, statements and stipulations required to be placed on final site plans by law or as a condition of approval, final site plans for the development of property shall contain the following: 1. For property located partially or wholly within the Fentress Airfield overlay district, the final site plan shall contain a statement as follows: "This development is located partially or wholly within an aircraft noise and/or accident zone and may be subject to above average noise levels or to aircraft accidents." 2. For property which is located in the Chesapeake Bay Preservation Area District, the final site plan shall contain the notes required by the regulations in article X, chapter 26 of the City Code. 3. For any development which requires environmental permits from any federal, or state or local agency, the final site plan shall contain a statement that all such permits will be obtained in a timely manner. E. Certifications. All submittals for final site plan approval shall contain a certification by the owner, applicant or authorized agent that to the best of his knowledge, the application is complete and accurate. This certification shall apply to all plans, environmental reports and attachments accompanying the application. No final site plan shall be considered complete without this certification. False certifications shall be deemed a violation of this ordinance and shall be punishable by civil penalty in accordance with section 20-202 of this ordinance.

(Ord. No. 98-O-158, 10-20-98; Ord. No. 04-O-057, 4-20-04; Ord. No. 05-O-130, 10-18-05; Ord. No. 09-O-051, 5-19-09; Ord. No. 22-O-124, 12-20-22)