For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 9-32 — Administration

Code of the City of Hampton, Virginia (Supp. No. 32: codified through Ordinance No. 26-0009, adopted June 10, 2026) · Hampton Zoning Ordinance § 9-32

Corpus is an independent public-information project, not the official City of Hampton website. Stable reference: corpuslaw.us/code/8f85d88e-1ba2-4252-b6b3-d8ccdf3ff7cb

Sec. 9-32. - Administration.

(1) Designation of the floodplain administrator. The zoning administrator or his designee shall act as floodplain administrator to administer and implement the flood plain regulations. The floodplain administrator may delegate duties and responsibilities to qualified technical personnel, plan examiners, inspectors, and other employees and enter into a written agreements with other communities and private sector entities to administer specific provisions of these regulations. (2) Duties and responsibilities of the floodplain administrator. The duties and responsibilities of the floodplain administrator shall include those set forth in the code of federal regulations, including but not limited to: (a) Review applications for permits to determine whether proposed activities will be located in the Special Flood Hazard Area (SFHA). (b) Interpret floodplain boundaries and provide available base flood elevation and flood hazard information. (c) Review applications to determine whether proposed activities will be reasonably safe from flooding and require new construction and substantial improvements to meet the requirements of these regulations. (d) Review applications to determine whether all necessary permits have been obtained from the federal, state or local agencies from which prior or concurrent approval is required; in particular, permits from state agencies for any construction, reconstruction, repair, or alteration of a dam, reservoir, or waterway obstruction (including bridges, culverts, structures), any alteration of a watercourse, or any change of the course, current, or cross section of a stream or body of water, including any change to the 100-year frequency floodplain of free-flowing non-tidal waters of the State. (e) Require applicants proposing an alteration of a watercourse to provide proof that they have notified adjacent communities, the Department of Conservation and Recreation (Division of Dam Safety and Floodplain Management), and other appropriate agencies (VADEQ, USACE) and have submitted copies of such notifications to FEMA. (f) Advise applicants for new construction or substantial improvement of structures regarding whether or not the proposed development is within an area of the Coastal Barrier Resources System established by the Coastal Barrier Resources Act where Federal flood insurance is not available; areas subject to this limitation are shown on Flood Insurance Rate Maps as Coastal Barrier Resource System Areas (CBRS) or Otherwise Protected Areas (OPA). (g) Review applications to develop in flood hazard areas for compliance with this article. (h) In accordance with chapter 1, administer and enforce the terms of this article, including but not limited to inspections of buildings, structures, and other development subject to this article. (i) Review elevation certificates and require incomplete or deficient certificates to be corrected. (j) Submit to FEMA, or require applicants to submit to FEMA, data and information necessary to maintain FIRMs, including hydrologic and hydraulic engineering analyses prepared by or for the city, within six months after such data and information becomes available if the analyses indicate changes in base flood elevations. (k) Maintain and permanently keep records that are necessary for the administration of these regulations, including: (i) Flood insurance studies, flood insurance rate maps (including historic studies and maps and current effective studies and maps) and Letters of Map Change; and (ii) Documentation supporting issuance and denial of permits, elevation certificates, documentation of the elevation (in relation to the datum on the FIRM) to which structures have been floodproofed, inspection records, other required design certifications, variances, and records of enforcement actions taken to correct violations of these regulations. (l) In accordance with chapter 1, administer and enforce the terms of this article. (m) Upon application for a variance from this article, prepare a staff report to the board of zoning appeals containing an analysis of the variance requirements applicable to this article. (n) Administer the requirements related to proposed work on existing buildings: (i) Make determinations as to whether buildings and structures that are located in flood hazard areas and that are damaged by any cause have been substantially damaged. (ii) Make reasonable efforts to notify owners of substantially damaged structures of the need to obtain a permit to repair, rehabilitate, or reconstruct. Prohibit the non-compliant repair of substantially damaged buildings except for temporary emergency protective measures necessary to secure a property or stabilize a building or structure to prevent additional damage. (o) Undertake, as determined appropriate by the floodplain administrator due to the circumstances, other actions which may include but are not limited to: issuing press releases, public service announcements, and other public information materials related to permit requests and repair of damaged structures; coordinating with other federal, state, and local agencies to assist with substantial damage determinations; providing owners of damaged structures information related to the proper repair of damaged structures in special flood hazard areas; and assisting property owners with documentation necessary to file claims for increased cost of compliance coverage under NFIP flood insurance policies. (p) Notify the Federal Emergency Management Agency when the corporate boundaries of the city have been modified and: (i) Provide a map that clearly delineates the new corporate boundaries or the new area for which the authority to regulate pursuant to these regulations has either been assumed or relinquished through annexation; and (ii) If the FIRM for any annexed area includes special flood hazard areas that have flood zones that have regulatory requirements that are not set forth in these regulations, prepare amendments to these regulations to adopt the FIRM and appropriate requirements, and submit the amendments to the governing body for adoption; such adoption shall take place at the same time as or prior to the date of annexation and a copy of the amended regulations shall be provided to Department of Conservation and Recreation (Division of Dam Safety and Floodplain Management) and FEMA. (q) Upon the request of FEMA, complete and submit a report concerning participation in the NFIP which may request information regarding the number of buildings in the SFHA, number of permits issued for development in the SFHA, and number of variances issued for development in the SFHA. (3) Use and interpretation of FIRMs. The floodplain administrator shall make interpretations, where needed, as to the exact location of special flood hazard areas, floodplain boundaries, and floodway boundaries based upon the applicable FIRM. Should a dispute arise concerning the boundaries of any of the districts, the floodplain administrator's interpretation may be appealed to the board of zoning appeals in accordance with the provisions of chapter 13 of the zoning ordinance. The following shall apply to the use and interpretation of FIRMs and data: (a) Where field surveyed topography indicates that adjacent ground elevations are: (i) Below the base flood elevation, even in areas not delineated as a special flood hazard area on a FIRM, the area shall be considered as special flood hazard area and subject to the requirements of these regulations; (ii) Above the base flood elevation, the area shall be regulated as special flood hazard area unless the applicant obtains a letter of map change that removes the area from the SFHA. (b) In FEMA-identified special flood hazard areas where base flood elevation and floodway data have not been identified and in areas where FEMA has not identified SFHAs, any other flood hazard data available from a Federal, State, or other source shall be reviewed and reasonably used. (c) Base flood elevations and designated floodway boundaries on FIRMs and in FISs shall take precedence over base flood elevations and floodway boundaries by any other sources if such sources show reduced floodway widths and/or lower base flood elevations. (d) Other sources of data shall be reasonably used if such sources show increased base flood elevations and/or larger floodway areas than are shown on FIRMs and in FISs. (e) If a Preliminary Flood Insurance Rate Map and/or a Preliminary Flood Insurance Study has been provided by FEMA, the City will advise applicants for proposed development in a SFHA of the impact of the preliminary map changes. (i) Upon the issuance of a letter of final determination by FEMA, the city will prepare a statement, under FEMA's direction, which will be signed by all parties confirming flood insurance implications regarding any decision to proceed with development based on the current FIRM and FIS. The statement will be used until adoption of the new FIRM and FIS. (4) District boundary changes. The delineation of any of the floodplain districts may be revised by the city where natural or man-made changes have occurred and/or where more detailed studies have been conducted or undertaken by the U.S. Army Corps of Engineers or other qualified agency, or an individual documents the need for such change. However, prior to any such change, approval must be obtained from the Federal Emergency Management Agency as evidenced by a completed LOMR. (5) Submitting model backed technical data. A community's base flood elevations may increase or decrease resulting from physical changes affecting flooding conditions. As soon as practicable, but not later than six months after the date such information becomes available, a community shall notify the Federal Emergency Management Agency of the changes by submitting technical or scientific data. The community may submit data via a LOMR. Such a submission is necessary so that upon confirmation of those physical changes affecting flooding conditions, risk premium rates and flood plain management requirements will be based upon current data. (6) Letters of map revision. When development in the floodplain will cause or causes a change in the base flood elevation, the applicant, including state agencies, must notify FEMA by applying for a Conditional Letter of Map Revision (CLOMR) and then a Letter of Map Revision (LOMR). Example cases: (a) Any development that causes a rise in the base flood elevations within the floodway. (b) Any development occurring in Zones A1-30 and AE without a designated floodway, which will cause a rise of more than one foot in the base flood elevation. (c) Alteration or relocation of a stream (including but not limited to installing culverts and bridges) 44 Code of Federal Regulations §65.3 and §65.6(a)(12).

(Ord. No. Z16-03, 4-13-2016)

Ask a question about Hampton law

Corpus searches the Hampton sections it holds and shows the ones that match, with their citations. Free, no sign-in.