For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 9-34 — District provisions

Code of the City of Hampton, Virginia (Supp. No. 32: codified through Ordinance No. 26-0009, adopted June 10, 2026) · Hampton Zoning Ordinance § 9-34

Corpus is an independent public-information project, not the official City of Hampton website. Stable reference: corpuslaw.us/code/dd1b0362-142c-4b28-a34a-64187ed3067d

Sec. 9-34. - District provisions.

(1) Permit and application requirements. (a) Permit requirement. All uses, activities, and development occurring within any special flood hazard area and other flood areas, including placement of manufactured homes, shall be undertaken only upon the issuance of a zoning permit, land disturbance permit, or building permit when such a permit is required. Such development shall be undertaken only in strict compliance with the provisions of this article, all other applicable codes and ordinances, as amended, such as the Virginia Uniform Statewide Building Code (VA USBC). Prior to the issuance of any such permit, the floodplain administrator shall require all applications to include compliance with all applicable state and federal laws. (b) Site plans and building permit applications. All site plan and building permit applications within any special flood hazard area or other flood areas shall incorporate the following information: (i) The elevation of the base flood at the site, or the elevation of the highest adjacent grade in other flood areas where no base flood elevation is provided. (ii) The elevation of the lowest floor (including basement) or, in V zones, the lowest horizontal structural member. (iii) For structures to be flood-proofed (non-residential only), the elevation to which the structure will be flood-proofed. (iv) Topographic information showing existing and proposed ground elevations. (c) Small projects considered compliant with flood zone requirements. (i) Individual permits shall not be required for activities, uses, and development (collectively "Small Projects") which have been reviewed, assessed, and documented by the City of Hampton and approved by FEMA in accordance with federal regulations as having low-to-no impact on the flood plain. A list of Small Projects meeting this criteria entitled, "City Review of Development in Flood Zones - Permit Requirements," is hereby adopted by reference as part of this article as if fully set forth herein, shall be kept on file in the office of the department of community development, and may be administratively amended as deemed necessary by the floodplain administrator in accordance with all federal requirements. (ii) Notwithstanding the foregoing section 9-34(c)(i), Small Projects which constitute a substantial improvement as defined in this article shall require submission of a zoning permit or building permit, as applicable, prior to commencement of construction or land disturbance. The floodplain administrator may require submittal of all plans, documents, and information deemed necessary to determine whether the Small Project is a substantial improvement and otherwise complies with this article. (2) General standards. In all special flood hazard areas the following provisions shall apply: (a) The freeboard shall be three (3) feet. The freeboard, in addition to the base flood elevation, shall constitute the design flood elevation. (b) New construction and substantial improvements shall be built according to this ordinance and the VA USBC, and anchored to prevent flotation, collapse or lateral movement of the structure. (c) Manufactured homes shall be anchored to prevent flotation, collapse, or lateral movement. Methods of anchoring may include, but are not limited to, use of over-the-top or frame ties to ground anchors. This standard shall be in addition to and consistent with applicable state anchoring requirements for resisting wind forces. (d) New construction and substantial improvements shall be constructed with materials and utility equipment resistant to flood damage. (e) New construction or substantial improvements shall be constructed by methods and practices that minimize flood damage. (f) Electrical, heating, ventilation, plumbing, air conditioning equipment and other service facilities, including duct work, shall be: (i) Elevated and installed at or above the design flood elevation; or (ii) Designed and/or located so as to prevent water from entering or accumulating within the components during conditions of flooding. (g) New and replacement water supply systems shall be designed to minimize or eliminate infiltration of flood waters into the system. (h) New and replacement sanitary sewage systems shall be designed to minimize or eliminate infiltration of flood waters into the systems and discharges from the systems into flood waters. (i) On-site waste disposal systems shall be located and constructed to avoid impairment to them or contamination from them during flooding. (j) Any alteration, repair, reconstruction or improvements to a building that is in compliance with the provisions of this article shall meet the requirements of "new construction" as contained in this article. (k) Any alteration, repair, reconstruction or improvements to a building that is not in compliance with the provisions of this article, shall be undertaken only if said non-conformity is not furthered, extended, or replaced. (l) Prior to any proposed alteration or relocation of any channels or of any watercourse, stream, etc., within this jurisdiction a permit shall be obtained from the U. S. Corps of Engineers, the Virginia Department of Environmental Quality, and the Virginia Marine Resources Commission (a joint permit application is available from any of these organizations). Furthermore, in riverine areas, notification of the proposal shall be given by the applicant to all affected adjacent jurisdictions, the Department of Conservation and Recreation (Division of Dam Safety and Floodplain Management), other required agencies, and the Federal Emergency Management Agency. (m) The flood carrying capacity within an altered or relocated portion of any watercourse shall be maintained. (n) For residential construction, the lowest floor shall not be below grade on all sides. (3) Elevation and construction standards. In all special flood hazard areas where base flood elevations have been provided in the FIS or generated by a certified professional in accordance with Section 9-33(1)(d), the following provisions shall apply: (a) Residential construction. (i) New construction or substantial improvement of any residential structure (including manufactured homes) in Zones A1-30, AE, AH and A with detailed base flood elevations shall have the lowest floor, including basement, elevated to or above the design flood elevation. See sections 9-33(1)(f) and 9-33(1)(g) for requirements in the Coastal A and VE zones. (b) Non-residential construction. (i) New construction or substantial improvement of any commercial, industrial, or non-residential building (or manufactured home) shall have the lowest floor, including basement, elevated to or above the design flood elevation. See sections 9-33(1)(f) and 9-33(1)(g) for requirements in the Coastal A and VE zones. (ii) Non-residential buildings located in all A1-30, AE, and AH zones may be flood-proofed in lieu of being elevated provided that all areas of the building components below the design flood elevation are water tight with walls substantially impermeable to the passage of water, and use structural components having the capability of resisting hydrostatic and hydrodynamic loads and the effect of buoyancy. A registered professional engineer or architect shall certify that the standards of this subsection are satisfied. Such certification, including the specific elevation (in relation to the datum specified on the effective FIRM) to which such structures are floodproofed, shall be maintained by the Floodplain Administrator. (c) Space below the lowest floor. In zones A, AE, AH, AO, and A1-A30, fully enclosed areas, of new construction or substantially improved structures, which are below the regulatory flood protection elevation shall: (i) Not be designed or used for human habitation, but shall be used solely for parking of vehicles, building access, or limited storage of maintenance equipment used in connection with the premises. Access to the enclosed area shall be the minimum necessary to allow for parking of vehicles (garage door) or limited storage of maintenance equipment (standard exterior door), or entry to the living area (stairway or elevator). (ii) Be constructed entirely of flood resistant materials below the design flood elevation; (iii) Include measures to automatically equalize hydrostatic flood forces on walls by allowing for the entry and exit of floodwaters. To meet this requirement, the openings must either be certified by a professional engineer or architect or meet the following minimum design criteria: (aa) Provide a minimum of two (2) openings on different sides of each enclosed area subject to flooding. (bb) The total net area of all openings must be at least one (1) square inch for each square foot of enclosed area subject to flooding or the flood openings shall be engineered flood openings that are designed and certified by a licensed professional engineer to automatically allow entry and exit of floodwaters; the certification requirement may be satisfied by an individual certification or issuance of an evaluation report by the ICC Evaluation Service, Inc. (cc) If a building has more than one (1) enclosed area, each area must have openings to allow floodwaters to automatically enter and exit. (dd) The bottom of all required openings shall be no higher than one (1) foot above the adjacent grade. (ee) Openings may be equipped with screens, louvers, or other opening coverings or devices, provided they permit the automatic flow of floodwaters in both directions. (ff) Foundation enclosures made of flexible skirting are not considered enclosures for regulatory purposes, and, therefore, do not require openings. Masonry or wood underpinning, regardless of structural status, is considered an enclosure and requires openings as outlined above. (d) Standards for manufactured homes and recreational vehicles. (i) In zones A, AE, AH, and AO, all manufactured homes placed, or substantially improved, on individual lots or parcels, in expansions to existing manufactured home parks or subdivisions, in a new manufactured home park or subdivision, or in an existing manufactured home park or subdivision on which a manufactured home has incurred substantial damage as the result of a flood, must meet all the requirements for new construction, including the elevation and anchoring requirements in sections 9-34(2) and 9-34(3). (ii) All manufactured homes placed or substantially improved in an existing manufactured home park or subdivision in which a manufactured home has not incurred substantial damage as the result of a flood shall be elevated so that: (aa) The lowest floor of the manufactured home is elevated no lower than design flood elevation; and (bb) The manufactured home must be securely anchored to the adequately anchored foundation system to resist flotation, collapse and lateral movement. (iii) All recreational vehicles placed on sites must either: (aa) Be on the site for fewer than 180 consecutive days, be fully licensed and ready for highway use (a recreational vehicle is ready for highway use if it is on its wheels or jacking system, is attached to the site only by quick disconnect type utilities and security devices and has no permanently attached additions); or (bb) Meet all the requirements for manufactured homes in Section 9-34(3)(d)(i). (4) Standards for subdivision proposals. (a) All subdivision proposals shall be consistent with the need to minimize flood damage; (b) All subdivision proposals shall have public utilities and facilities such as sewer, gas, electrical and water systems located and constructed to minimize flood damage; (c) All subdivision proposals shall have adequate drainage provided to reduce exposure to flood hazards, and (d) Base flood elevation data shall be obtained from other sources or developed using detailed methodologies, hydraulic and hydrologic analysis, comparable to those contained in a flood insurance study for subdivision proposals and other proposed development proposals (including manufactured home parks and subdivisions) that exceed five lots or five acres, whichever is the lesser.

(Ord. No. Z16-03, 4-13-2016; Ord. No. Z18-9, 7-11-2018)

Ask a question about Hampton law

Corpus searches the Hampton sections it holds and shows the ones that match, with their citations. Free, no sign-in.