§ 37.1-33 — Virginia Erosion and Stormwater Management Program Permit (VESMP permit) Requirements
Code of Ordinances, City of Newport News, Virginia (Supp. No. 82: codified through Ordinance No. 8209-26, enacted September 22, 2026) · Newport News City Code § 37.1-33
Corpus is an independent public-information project, not the official City of Newport News website. Stable reference: corpuslaw.us/code/38a2dbd5-8aba-4f2d-a12f-40d615f6b830
Sec. 37.1-33. - Virginia Erosion and Stormwater Management Program Permit (VESMP permit) Requirements.
(a) Any person who engages in any regulated land-disturbing activity regulated by this article without first obtaining a VESMP permit for such activity shall be in violation of this article. Any person who violates any condition of any permit for land-disturbing activity or exceeds the scope of approval of any such activity shall be in violation of this article. Issuance of a land disturbance (VESMP) permit is contingent on satisfying all of the following: (1) Compliance with the general plan preparation in section 37.1-34 and general criteria provided in section 37.1-35.1; (2) An erosion and sediment control plan in compliance with section 37.1-35.2 and a designated Responsible Land Disturber that holds a certificate of competence, pursuant to § 62.1-44.15:30 of the Code of Virginia, who will be responsible for ensuring the plan for the land-disturbing activity; (3) A stormwater management plan in compliance with section 37.1-35.3 and 37.1-35.4, including a recorded maintenance agreement if required; (4) All required bonds in compliance with section 37.1-37.1 and fees in compliance with section 37.1-37.2 must be paid; (5) A VPDES Construction General Permit Registration Statement, when required; and (6) Documentation of an individual VPDES permit authorizing discharge of construction stormwater or coverage under the VPDES General Permit for Discharges of Stormwater from Construction Activities. (b) Regulated Land Disturbing Activities; criteria (§ 62.1-44:15.34 of the Code of Virginia). (1) Land disturbance activity that (i) disturbs one (1) acre or more; or (ii) disturbs less than one (1) acre and is part of a larger common plan of development or sale that results in one (1) acre or greater of land disturbance, shall comply with the following: a. VESMP general plan preparation in section 37.1-34 and general criteria in section 37.1-35.1; b. Erosion and sediment control requirements in section 37.1-35.2; c. Stormwater management requirements in section 37.1-35.3 and 37.1-35.4; d. Stormwater pollution prevention plan requirements in section 37.1-38.1; e. Pollution prevention plan requirements in section 37.1-38.2; and f. VPDES permit coverage requirements in section 37.1-33(a), unless otherwise required by the City Code or state or federal law. (2) Land disturbance activity, within a Chesapeake Bay Preservation Area, that disturbs two thousand five hundred (2,500) square feet or greater and less than one (1) acre, shall comply with the following: a. VESMP general plan preparation in section 37.1-34 and general criteria in section 37.1-35.1; b. Erosion and sediment control requirements in section 37.1-35.2; and c. Stormwater management requirements in section 37.1-35.3 and 37.1-35.4, unless otherwise required by the City Code or state or federal law. (3) Land disturbance activity occurring in an area not designated as a Chesapeake Bay Preservation Area that disturbs ten thousand (10,000) square feet or greater and less than one (1) acre, shall comply with the following: a. VESMP general plan preparation in section 37.1-34 and general criteria in section 37.1-35.1; b. Erosion and sediment control requirements in section 37.1-35.2; and c. Stormwater quantity requirements in section 37.1-35.3 and 37.1-35.4, unless otherwise required by the City Code or state or federal law. (4) Land disturbance for single-family detached residential structures and farm houses/structures. a. Land disturbing activity for sites (1) within a Chesapeake Bay Preservation Area that disturb equal to or greater than two thousand five hundred (2,500) square feet and less than one (1) acre; or (2) not within a Chesapeake Bay Preservation Area that disturbs equal to or greater than ten thousand (10,000) square feet and less than one (1) acre, or (3) sites with disturbance less than one (1) acre within a common plan of development or sale, shall comply with the following: 1. VESMP general plan preparation in section 37.1-34 and general criteria in section 37.1-35.1; 2. Erosion and sediment control requirements in section 37.1-35.2; and 3. Stormwater quantity requirements in section 37.1-35.3 and 37.1-35.4, unless otherwise required by the City Code or state or federal law. b. An agreement in lieu of a plan may be used to satisfy the requirements of item (4)a. of this sub-subsection. For farm building or structures, an agreement in lieu of a plan may be used only if the total impervious cover percentage on the parcel, including the farm building or structure, is less than five (5) percent. c. Land disturbing activity greater than one (1) acre and less than five (5) acres. 1. A single-family detached home must meet the requirements of items (1)a. through (1)e. of this subsection. 2. A farm house or structure must meet all the requirements of item (1) of this subsection. d. Land-disturbing activity greater than five (5) acres must meet all the requirements of item (1) of this subsection. e. Multiple single-family detached homes under construction contiguously, no matter the individual lot land disturbance, that result in total land disturbance equal to or greater than ten thousand (10,000) square feet, must obtain a land disturbance permit and meet the requirements of section 37.1-35.2 (erosion and sediment control). (5) Land disturbance associated with routine maintenance. Routine maintenance that is performed to maintain the original line and grade, hydraulic capacity, or original construction of a project shall comply with: a. VESMP general plan preparation in section 37.1-34 and general criteria in section 37.1-35.1; and b. Erosion and sediment control requirements in section 37.1-35.2. c. Such land disturbances are not required to comply with section 37.1-35.3 [and] 37.1-35.4 unless otherwise required by the City Code or state or federal law. d. The paving of existing road with a compacted or impervious surface and re-establishment of existing associated ditches and shoulders shall be deemed routine maintenance if performed in accordance with this subsection. Work to exposed subgrade or below is not considered maintenance. (6) Land disturbing activities under a state or federal reclamation program. Activities under a state or federal reclamation program to return an abandoned property to an agricultural or open land use shall comply with: a. VESMP general plan preparation in section 37.1-34 and general criteria in section 37.1-35.1; and b. Erosion and sediment control plan requirements in section 37.1-35.2. c. Such land disturbances are not required to comply with section 37.1-35.3 [and] 37.1-35.4 unless otherwise required by the City Code or state or federal law. (7) A state agency shall not undertake a project involving a land-disturbing activity unless in accordance with § 62.1-44.15:31: a. The state agency has submitted specifications for its conduct of land-disturbing activities which have been reviewed and approved by the Virginia Department of Environmental Quality as being consistent with the state program; or b. The state agency has submitted a conservation plan for the project which has been reviewed and approved by the Virginia Department of Environmental Quality. (8) Where land-disturbing activities involve lands under the jurisdiction of more than one (1) local control program, it shall be the applicant's responsibility to comply with the program of the jurisdiction wherein any portion of the land is located. However, an erosion and sediment control and stormwater management plan may, at the option of the applicant, be submitted to the board for review and approval rather than to each jurisdiction concerned. Regardless of the procedure followed by the applicant for plan approval, land-disturbing activity which takes place within the municipal boundaries of the city shall be inspected by an inspector employed by the city and the charge set forth in this article for a land-disturbing permit shall be paid to the city before any land-disturbing activities will be allowed to commence. (c) Exemptions. The following activities are exempt from this article: (1) Land disturbances less than two thousand five hundred (2,500) square feet in Chesapeake Bay Preservation Areas or less than ten thousand (10,000) square feet in all other areas of the city and are not part of a common plan of development or sale that disturbs one (1) acre or more in its entirety, unless otherwise required by state or federal law or regulation. (2) Minor land-disturbing activities, including home gardens and individual home landscaping, repairs, and maintenance work; (3) Installation, maintenance, or repair of any individual service connection; (4) Installation, maintenance, or repair of any underground utility line when such activity occurs on an existing hard surfaced road, street, or sidewalk, provided the land-disturbing activity is confined to the area of the road, street, or sidewalk that is hard surfaced; (5) Installation, maintenance, or repair of any septic tank line or drainage field unless included in an overall plan for land-disturbing activity relating to construction of the building to be served by the septic tank system; (6) Permitted surface or deep mining operations and projects, or oil and gas operations and projects conducted under the provisions of Title § 45.2 of the Code of Virginia. (7) Clearing of lands specifically for agricultural purposes and the management, tilling, planting, or harvesting of agricultural, horticultural, or forest crops, livestock feedlot operations, or as additionally set forth by the Board in regulations, including engineering operations as follows: construction of terraces, terrace outlets, check dams, desilting basins, dikes, ponds, ditches, strip cropping, lister furrowing, contour cultivating, contour furrowing, land drainage, and land irrigation; however, this exception shall not apply to harvesting of forest crops unless the area on which harvesting occurs is reforested artificially or naturally in accordance with the provisions of Chapter 11 (§ 10.1-1100 et seq. of the Code of Virginia) or is converted to bona fide agricultural or improved pasture use as described in subsection B of § 10.1-1163 of the Code of Virginia; (8) Installation of fence and signposts or telephone and electric poles and other kinds of posts or poles; (9) Shoreline erosion control projects on tidal waters when all of the land-disturbing activities are within the regulatory authority of and approved by the local wetlands board, the Marine Resources Commission, or the United States Army Corps of Engineers; however, any associated land that is disturbed outside of this exempted area shall remain subject to the VESMA and the regulations adopted pursuant thereto; (10) Repair or rebuilding of the tracks, rights-of-way, bridges, communication facilities, and other related structures and facilities of a railroad company; (11) Conducting land-disturbing activities in response to a public emergency where the related work requires immediate authorization to avoid imminent endangerment to human health or the environment. In such situations, the city shall be advised of the disturbance within seven (7) days of commencing the land-disturbing activity and compliance with the administrative requirements of this article are required within thirty (30) days of commencing the land-disturbing activity.
(Ord. No. 8009-24)
Ask a question about Newport News law
Corpus searches the Newport News sections it holds and shows the ones that match, with their citations. Free, no sign-in.
