§ 37.1-35.4 — Stormwater management plan; contents
Code of Ordinances, City of Newport News, Virginia (Supp. No. 82: codified through Ordinance No. 8209-26, enacted September 22, 2026) · Newport News City Code § 37.1-35.4
Corpus is an independent public-information project, not the official City of Newport News website. Stable reference: corpuslaw.us/code/075253ae-f22b-48f1-8380-61e989f65c06
Sec. 37.1-35.4. - Stormwater management plan; contents.
(a) For an individual residential, commercial, or industrial parcel within larger common plan of development or sale where a stormwater management plan has been approved by the city manager or designee that addresses the water quality and quantity control requirements of that parcel, such parcel, whether developed by the initial owner or a subsequent owner, shall incorporate that approved stormwater management plan by reference and design in accordance with such plan. (b) All methods to meet water quality and quantity control shall be selected and designed in accordance with the Virginia Stormwater Management Handbook and the Virginia Stormwater BMP Clearinghouse to the extent these standards do not conflict with more stringent city requirements or the City's Design Criteria Manual. (c) To protect the quality and quantity of state water from the potential harm of unmanaged stormwater runoff resulting from land-disturbing activities, the city hereby adopts the technical criteria for regulated land-disturbing activities set forth in in Part V of 9VAC25- 875 expressly to include 9VAC25-875-580 [water quality design criteria requirements]; 9VAC25-875-590 [water quality compliance]; 9VAC25-875-600 [water quantity]; 9VAC25-875-610 [offsite compliance options]; 9VAC25-875-620 [design storms and hydrologic methods]; 9VAC25-875-630 [stormwater harvesting]; 9VAC25-875-640 [linear development project]; and 9VAC25-875-650 [stormwater management impoundment structures or facilities], which shall apply to all land-disturbing activities regulated pursuant to this article. (d) New construction of onsite stormwater management facilities in floodplains should be avoided. When this is unavoidable, a special examination to determine adequacy of proposed stormwater management facilities shall be conducted as determined by the city manager, or designee. Such new construction shall be in compliance with all applicable regulations under the National Flood Insurance Program. (e) Land development projects shall comply with the requirements of any regional stormwater management plan for the watershed in which the proposed land development is located.
(Ord. No. 8009-24)
Ask a question about Newport News law
Corpus searches the Newport News sections it holds and shows the ones that match, with their citations. Free, no sign-in.
