For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 33.1-24 — Preapplication conference and submission of conceptual plan

Code of the City of Portsmouth, Virginia (Codified through Ordinance No. 2026-64, enacted June 23, 2026. (Supp. No. 66)) · Portsmouth City Code § 33.1-24

Corpus is an independent public-information project, not the official City of Portsmouth website. Stable reference: corpuslaw.us/code/00e31500-8b81-4d9a-92e0-ad4e0f32c9af

Sec. 33.1-24. - Preapplication conference and submission of conceptual plan.

(a) Before submittal of any preliminary or final subdivision plan for a subdivision, the applicant is advised to confer with the subdivision agent and such other agencies of the state and city as the agent deems advisable concerning the proposed subdivision. (b) Prior to the submission of any major subdivision plan, the applicant or his representative is advised to submit three copies of a conceptual plan for review by the agent; such action does not constitute the submission of a preliminary plan and is not to be construed as an application for approval in computing time limitations in relation thereto. The planning division shall transmit comments to the applicant within 21 calendar days of submittal of a plan which meets all applicable submittal criteria. (c) The conceptual plan may be granted conceptual plan approval with conditions that should be satisfied prior to final plan approval; such action does not constitute final subdivision approval or preliminary plan approval. Submittal of a preliminary plan that does not incorporate the conditions set forth during the conceptual plan review period, shall be reviewed by the agent under the requirements of section 33.1-29. Unless required by the agent , a re-submittal of conceptual plans shall not be necessary. (d) Conceptual plans shall, at a minimum, show: (1) Property lines. (2) Existing and proposed building locations and orientation. (3) Building locations on adjacent properties. (4) Landscape areas/buffers. (5) Entrances/exits/access to the site (vehicular, pedestrian, etc.). (6) Proposed use of site. (7) Building/landscape setbacks per zoning ordinance requirements. (8) Site zoning and zoning of surrounding properties. (9) Location of stormwater management facilities. (10) Graphic scale. (11) Existing and proposed easements (conservation, utility, etc.). (12) Unique natural features (water features, wetlands, RPA, RMA, IDA, floodplain, etc.). (13) List of currently binding proffers or use permit conditions. (14) Location of entry sign(s). (15) Topography of site. (e) If the agent determines that one or more of the above submittal requirements is not applicable to the proposed project, the agent may waive those requirements.

(Ord. No. 2010-06, § 2, 1-26-2010; Ord. No. 2025-83, § 1(Exh. A), 10-28-2025)

Ask a question about Portsmouth law

Corpus searches the Portsmouth sections it holds and shows the ones that match, with their citations. Free, no sign-in.