§ 33.1-49 — Utility and street improvements
Code of the City of Portsmouth, Virginia (Codified through Ordinance No. 2026-64, enacted June 23, 2026. (Supp. No. 66)) · Portsmouth City Code § 33.1-49
Corpus is an independent public-information project, not the official City of Portsmouth website. Stable reference: corpuslaw.us/code/f8b1fae2-9846-40f9-a8a8-9d0c602c74d0
Sec. 33.1-49. - Utility and street improvements.
(a) In subdivisions, or parts of subdivisions, improvements shall be provided by the subdivider as follows: (1) Streets shall be graded to the full width and shall be designed in accordance to the approved cross-sections and profiles and the Traditional Neighborhood Design provisions contained within the Virginia Department of Transportation's Subdivision Street Design Guide, as last amended, and the City of Portsmouth Master Transportation Plan. (2) The pavement base and surface of streets shall be appropriate to the type of development and type of use contemplated and shall be installed in accordance with standards and specifications of the city. The thickness of base and pavement shall be determined by actual soil bearing tests of the California Bearing Ratio type or its equivalent (performed at the expense of the subdivider by an approved testing laboratory at locations specified by the city engineer) and by anticipated traffic loading methods developed by the Asphalt Institute or the Portland Cement Association. (3) A drainage system shall be provided to ensure adequate drainage of both natural and stormwater. The system shall be constructed and installed in accordance with plans and specifications approved by the city engineer. The subdivider shall be required to install necessary drainage facilities outside the property limits of the land owned or controlled by the subdivider but necessitated, at least in part, by the construction or improvement of the subdivision. (4) Curbs and gutters shall be installed in accordance with the plans and specifications approved by the city engineer and shall be designed in accordance with the Traditional Neighborhood Design provisions contained within the Virginia Department of Transportation's Subdivision Street Design Guide, as last amended, and the City of Portsmouth Master Transportation Plan. The use of valley gutters shall be avoided. (5) Water lines shall be installed by the subdivider in accordance with plans and specifications approved by the director of public utilities. The subdivider shall be required to install necessary water facilities outside the property limits of the land owned or controlled by the subdivider but necessitated, at least in part, by the construction or improvement of the subdivision. (6) Sanitary sewerage shall be installed by the subdivider in accordance with plans and specifications approved by the director of public utilities. The subdivider shall be required to install necessary sanitary sewage facilities outside the property limits of the land owned or controlled by the subdivider but necessitated, at least in part, by the construction or improvement of the subdivision. (7) Sidewalks, at least five feet in width, shall be installed on both sides of all arterial and collector streets. Sidewalks, at least five feet in width, shall be installed along all street frontage planned for apartments or townhouses. Sidewalks, at least five feet in width, shall be required along one side of all minor and cul-de-sac streets; however, the agent may reduce or eliminate the requirements on any minor street, as defined in section 33.1-2 of the City Code, or cul-de-sac. The agent must find that such reduction will not create a pedestrian safety hazard. Sidewalks shall be installed in accordance with plans and specifications of the city and must include ramps for wheelchair access at all intersections in accordance with the requirements of the Americans with Disabilities Act and in accordance with any revisions approved by the Federal Highway Administration. (8) Standard city street signs shall be installed at all street intersections. (9) Necessary traffic-control devices, including, but not limited to, traffic signals or traffic signs which are required within the subdivision or adjacent thereto and which are approved by the traffic engineer, shall be installed. (10) Street lights shall be installed by the subdivider in accordance with the standards and specifications approved by the traffic engineer. The subdivider shall pay the cost of installation thereof and all costs to be incurred for the operation and maintenance thereof during the first year following the completion of installation. (11) Bridge widths shall be designed to the ultimate right-of-way width. Sidewalks shall be provided on both sides of bridges unless waived by the city engineer. Timber construction, including timber pilings, shall not be permitted. Bridges shall be designed for H-20 loading (minimum). Architectural and ornamental work on bridges shall be compatible with the area in which the bridge is located and approved by the city engineer. (12) Culverts shall be designed in accordance with the Virginia Department of Transportation design standards and details. Endwalls shall be provided as required by the city engineer and shall conform to Virginia Department of Transportation standards or city standards. The developer shall provide for soil bearing investigations to determine foundation requirements. Pilings for culvert support shall be provided if needed. Ample waterway shall be provided for in culvert design, based on five-year storm recurrence and the drainage area served by the culverts. When requested by the city engineer, the developer shall provide calculations for major culverts and bridge crossings which shall be based on a 25-year frequency to ensure that no flood hazard will result to the public rights-of-way or to residences or other structures. (13) For the purpose of creating residential lots on existing streets, the planning director may modify or waive the street grading, pavement base, surface and curb and gutter requirements on an existing street constructed without such required improvements if: a. The city has no plans to install such improvements on the street within the next ten years; b. The street is currently improved or will be improved to a standard equivalent to similar streets in the neighborhood; c. After consultation with the city engineer, a determination is made that the street will provide adequate and safe access and drainage to existing and future residents in accordance with the purposes of the subdivision ordinance; and d. The real property for which the waiver or modification is sought contains no more than five new, adjacent lots. Any such waiver or modification shall not apply to required drainage improvements except for curbs and gutters. (b) All engineering calculations, including soil test results, shall be furnished to the city engineer with required submittals. Approval by the city engineer shall not release the developer from the requirements for a safe and functional design. (c) The developer shall be required to furnish all other data pertaining to bridges and culverts which shall be deemed necessary by the city engineer. (d) The cost of all physical improvements required by the provisions of this section shall be paid by the subdivider. If the actual installation of improvements is not completed prior to the application made for final plat approval, the subdivider shall execute and file with the city engineer an agreement and bond in an amount equal to the estimated costs (as established by the city) of such improvements, plus ten percent, guaranteeing that the required improvements will be properly and satisfactorily installed within a reasonable length of time, but, in no event, more than two years. An irrevocable letter of credit issued by a bank in a form approved by the city attorney or a deposit of funds in escrow may be accepted in lieu of bond under the same terms and conditions applicable to bonds. The bond, letter of credit or deposit may be released by the city when specific improvements covered by the bond have been completed and approved by the city engineer as being in accordance with city standards and specifications. (e) Upon written request by the subdivider to the city engineer, periodic partial releases of the bond, letter of credit, escrow or other performance guarantee may be made in an accumulative amount equal to no less than 80 percent of the original amount of such bond, letter of credit, escrow or other performance guarantee. Periodic partial releases shall be based upon the percentage of facilities completed and accepted by the city engineer. Periodic partial releases may not occur before the completion of at least 30 percent of the facilities. The city engineer shall not be required to approve more than three periodic partial releases in any 12-month period. Within 30 days after receipt of a written notice from the subdivider for a periodic partial release or a final complete release of any bond, escrow, letter of credit, or other performance guarantee, the city engineer shall notify the subdivider of approval or nonapproval of such requests or of any specific defects or deficiencies in construction and suggested corrective measures. If no such notice is provided to the subdivider within the two-year period, the periodic partial release shall be deemed approved. No final release shall be granted until after expiration of said two-year period and there is an additional request in writing sent by certified mail, return receipt, to the city manager. If no action is taken within ten days from the receipt of this request, then the final release of the bond, letter of credit, escrow or other performance guarantee shall be deemed approved. (f) Upon acceptance of improvements, the subdivider shall execute and file with the city engineer a maintenance bond equal to ten percent of the total cost of the public improvements installed for the subdivision. The subdivider shall be responsible for all maintenance or repairs for the public improvements as required by the city engineer for a period of one year after acceptance of such improvements. (g) In those instances in which any of the improvements as required by this section could be more conveniently installed by the city or its agent, the city may, in its discretion, accept payment of the total cost of such improvements in lieu of actual construction or bond as required above. Such payment will be set forth in an agreement approved by the city attorney, which agreement will set forth the conditions of payment and a time limit upon the use of such payment by the city, such time limit in no instance to exceed ten years. If such payment is not utilized by the city within the agreed time limit, it will revert to the subdivider. (h) If a subdivider makes an advance of payments for or construction of reasonable and necessary road improvements located outside the property limits of the land owned or controlled by the subdivider, the need for which is substantially generated and reasonably required by the construction or improvement of the subdivision or development, and such advance is accepted, the city may agree to reimburse the subdivider from such funds as the city may make available for such purpose from time to time for the cost of such advance together with interest, which shall be excludable from gross income for federal income tax purposes, at a rate equal to the rate of interest on bonds most recently issued by the city on the following terms and conditions: (1) The city shall determine or confirm that the road improvements were substantially generated and reasonably required by the construction or improvement of the subdivision or development, and shall determine or confirm the cost thereof on the basis of a study conducted by qualified traffic engineers and approved and accepted by the subdivider. (2) The city shall prepare, or cause to be prepared, a report, accepted and approved by the subdivider indicating the governmental services required to be furnished to the subdivision or development and an estimate of the annual cost thereof for the period during which the reimbursement is to be made to the subdivider. (3) The city may make annual reimbursements to the subdivider from funds made available for such purpose from time to time, including, but not limited to, real estate taxes assessed and collected against the land and improvements on the property included in the subdivision in amounts equal to the amount by which such real estate taxes exceed the annual cost of providing reasonable and necessary governmental services to such subdivision or development. (i) No certificate of occupancy shall be issued for the occupancy of any structure or building to be located in such subdivision unless and until the improvements required herein which are directly necessary to the use and enjoyment of such structure have been installed and accepted by the city, except that final roadway surface need not be applied prior to issuance of such certificate if a suitable base and interim sealing agent acceptable to the city have been laid. (j) A subdivider or developer of land shall pay to the city the pro rata share of the cost of providing reasonable and necessary sewerage, water and drainage facilities located outside the property limits of the land owned or controlled by the subdivider or developer but necessitated or required, at least in part, by the construction or improvement of the subdivision or development, subject to the following: (1) No such payment shall be required until such time as the city shall establish a general sewer, water and drainage improvement program for an area having related and common sewer, water and drainage conditions and within which the land owned or controlled by the subdivider or developer is located. (2) Such share shall be limited to the proportion of such total estimated cost which the increased sewage flow, water flow and/or increased volume and velocity of stormwater runoff to be actually caused by the subdivision or development bears to total estimated volume and velocity of such sewage, water and/or runoff from the applicable area having an established general improvement plan as required by subsection (j)(1) of this section. (3) In lieu of any such payment, the subdivider or developer shall execute and file with the city engineer an agreement and bond with surety, satisfactory to the city attorney, equal to the estimated costs, as established by the city engineer, of such improvements conditioned upon payment at the commencement of construction of the facilities. An irrevocable letter of credit issued by a bank in a form approved by the city attorney may also be accepted under the same terms and conditions applicable to bonds. (4) Any payments received shall be kept in a separate account for each of the individually established improvement programs until such time as they are expended for the improvement program.
(Ord. No. 2010-06, § 2, 1-26-2010; Ord. No. 2025-83, § 1(Exh. A), 10-28-2025)
Ask a question about Portsmouth law
Corpus searches the Portsmouth sections it holds and shows the ones that match, with their citations. Free, no sign-in.