§ 33.1-50 — Off-site drainage
Code of the City of Portsmouth, Virginia (Codified through Ordinance No. 2026-64, enacted June 23, 2026. (Supp. No. 66)) · Portsmouth City Code § 33.1-50
Corpus is an independent public-information project, not the official City of Portsmouth website. Stable reference: corpuslaw.us/code/55095343-2823-42b8-a9c8-95be90107f00
Sec. 33.1-50. - Off-site drainage.
(a) New development. (1) A building permit will be issued by the building official for proposed construction of new development only after the city engineer has determined that the additional off-site drainage flow from such proposed construction will not be a danger or hazard to an existing off-site drainage facility or property in the proposed construction sites' drainage basin. (Off-site drainage facilities are those facilities outside the property limits of the proposed construction site necessary to carry drainage flow from construction site to a drainage basin.) New open ditches or modification of existing ditches will not be permitted in areas zoned residential unless included in the city's master drainage plan. (2) The city engineer will determine whether a hazard or danger exists from such additional off-site drainage flow by approved drainage computations furnished to the city engineer by the permit applicant in accordance with the city's master drainage plan, existing field conditions and zoning required by city council. Computations shall be based on a normal storm return period of ten years using U.S. Department of Commerce curves and utilizing applicable existing master drainage plans on file in the office of the city engineer, or as adjusted by the city. Where reasonably necessary to protect public or private property, the city engineer may require calculation of drainage flow and installation of improvements based on a normal storm return period of greater than five years. (3) After the city engineer determines no hazard or danger results from additional offsite drainage flow, the building official will issue a building permit if other requirements are met. (4) When the city engineer determines that a hazard or danger results from additional off-site drainage flow, and all other legal mandates are met, the building permit will be issued only after: a. A plan is submitted by the permit applicant to provide the off-site drainage and is approved by the city engineer, and the permit applicant agrees to construct such approved off-site drainage pursuant to the bonding or other financing procedures set out in section 33.1-49 of this Code. b. The city council, at its discretion, independently or in conjunction with the permit applicant, may agree to construct such approved drainage facilities; provided, that in areas zoned residential the city will construct such facilities using nonlocal funds only. (Nonlocal funds are those received by the city from federal or state grants.) (b) Existing systems. All developments shall provide retention and mass detention facilities to reduce the additional drainage flow to all existing drainage systems where sufficient land exists to permit these facilities and/or where needed to permit proper utilization of existing and proposed drainage facilities. (c) Safe and functional design. Approval by the city engineer will not release the liability of the developer from the requirements of a safe and functional design. (d) Compliance with state law. The city shall comply with the express terms and conditions of Code of Virginia, §§ 15.2-2241 through 15.2-2276.
(Ord. No. 2010-06, § 2, 1-26-2010)
Ask a question about Portsmouth law
Corpus searches the Portsmouth sections it holds and shows the ones that match, with their citations. Free, no sign-in.