§ 9.1-10 — Performance standards
Code of the City of Portsmouth, Virginia (Codified through Ordinance No. 2026-64, enacted June 23, 2026. (Supp. No. 66)) · Portsmouth City Code § 9.1-10
Corpus is an independent public-information project, not the official City of Portsmouth website. Stable reference: corpuslaw.us/code/da67ddfc-2d0c-4daa-a55c-4c76074f0c1e
Sec. 9.1-10. - Performance standards.
(a) Purpose and intent. The performance standards establish the means to minimize erosion and sedimentation potential, reduce land application of nutrients and toxics, and maximize rainwater infiltration. Natural groundcover, especially woody vegetation, is most effective in holding soil in place and preventing site erosion. Indigenous vegetation, with its adaptability to local conditions without the use of harmful fertilizers or pesticides, filters stormwater runoff. Minimizing impervious cover enhances rainwater infiltration and effectively reduces stormwater runoff potential. The purpose and intent of these requirements are also to implement the following objectives: prevent a net increase in nonpoint source pollution from new development; achieve a ten percent reduction in nonpoint source pollution from development on previously developed land where the runoff was not treated by one or more water quality best management practices; and achieve a 40 percent reduction in nonpoint source pollution from agricultural uses. (b) General performance standards for development and redevelopment. (1) Land development, redevelopment, or disturbance shall be limited to the minimum area necessary to provide for the proposed use or development. a. The submitted site plan shall indicate the limits of the proposed land disturbance, including areas for clearing or grading and shall be limited to the minimum area necessary to provide for the construction footprint. These limits shall be clearly shown on submitted plan and physically marked on the development site. b. Ingress and egress during construction shall be limited to one access point. (2) Indigenous vegetation shall be preserved to the maximum extent practicable consistent with the use or development proposed and in accordance with the Virginia Stormwater Management Handbook (Version 1.1 and subsequent updates). a. Mature trees shall be protected during development and only removed where necessary, including to provide for the proposed use or development. b. Existing trees over two inches in diameter at breast height (DBH) and other woody vegetation shall be preserved outside the construction footprint. c. Diseased trees or trees weakened by age, storm, fire, or other injury, as documented in writing to the director of planning by a landscape architect or a certified arborist who holds a current membership in either the International Society of Arboriculture (ISA), the Tree Care Industry Association, or the American Society of Consulting Arborists (ASCA), may be removed. d. Clearing shall be allowed only to provide necessary access, positive site drainage, water quality BMPs, and the installation of utilities. e. Prior to clearing or grading, suitable protective barriers, such as fencing of a type detailed in the Landscape Planting and Protection Manual, Portsmouth, Virginia shall be erected five feet outside of the dripline of any tree or stand of trees to be preserved. These protective barriers shall remain so erected throughout all phases of construction. The storage of equipment, materials, debris, or fill shall not be allowed within the area protected by the barrier. (3) Land development, redevelopment or land disturbance which adds impervious cover shall minimize impervious cover to promote infiltration of stormwater into the ground consistent with the proposed use or development. Pervious surfaces where soil conditions and/or water table permit shall be used for any parking area, maneuvering aisle, or other low traffic driveway. During the design phase of development, use of the following means of minimizing impervious cover are encouraged: a. Placement of parking areas under multi-family, office, or commercial buildings. b. Use of shared parking where possible in mixed use developments. c. Construction of no more than the minimum number of parking spaces required by the zoning ordinance, chapter 40.2. d. Use of modular grid pavers on private property and in low-traffic zones. (4) Notwithstanding any other provisions of this chapter or exceptions or exemptions thereto, any land disturbing activity exceeding 2,500 square feet, including construction of all single-family houses, septic tanks, and drainfields, shall also comply with the requirements of chapter 11,1 of this Code (Erosion and Stormwater Management). Enforcement for noncompliance with the erosion and sediment control requirements referenced in this criterion shall be conducted under the provisions of the Virginia Erosion and Stormwater Management Act and attendant regulations. (5) Where the best management practices require regular or periodic maintenance in order to continue their functions, such maintenance shall be ensured through a maintenance agreement between the owner or developer and the city or some other mechanism that achieves an equivalent objective. (6) All on-site sewage disposal systems not requiring a VPDES permit shall be pumped out at least once every five years, in accordance with the provisions of section 38-312. (7) For new construction, a reserve sewage disposal site with a capacity at least equal to that of the primary sewage disposal site shall be provided, in accordance with section 38-313. This requirement shall not apply to any lot or parcel recorded prior to October 1, 1989, if such lot or parcel is not sufficient in capacity to accommodate a reserve sewage disposal site, as determined by the local health department. Building or construction of any impervious surface shall be prohibited on the area of all sewage disposal sites or on an on-site sewage treatment system, which operates under a permit issued by the state water control board, until the structure is served by public sewer. (8) Any land disturbing activity as defined by Code of Virginia, § 62.1-44.15:24 occurring within designated Chesapeake Bay Preservation Areas shall comply with the requirements of 9VAC25-875-80, 9VAC25-875-260, and 9VAC25-875-740 of the Virginia Erosion and Stormwater Management Regulations. (9) Prior to authorizing grading or other on-site activities on any portion of a lot or parcel, all required federal, state, and local permits shall be obtained and evidence of such submitted to the city engineer, in accordance with section 9.1-11. (c) Criteria for development within RPAs. In addition to the performance standards set forth in subsection 9.1-10(b), the criteria in this section are applicable in Resource Protection Areas. A water quality impact assessment in conformance with subsection 9.1-11(e) and a resiliency assessment in conformance with subsection 9.1-11(f) shall be submitted for all proposed land disturbances in the RPA. (1) Allowable land uses in the RPA. Land disturbances may be allowed in the RPA subject to approval by the city only if one or more of the following conditions exist: a. It is a new or expanded water-dependent facility, which meets the following: 1. It does not conflict with the comprehensive plan; 2. It complies with the performance standards section of this chapter; 3. Any nonwater-dependent component is located outside of the RPA; and 4. Access to the water-dependent facility will be provided with the minimum disturbance necessary. Where practicable, a single point of access will be provided. b. It constitutes redevelopment sited outside the IDA, and meets the following criteria: 1. Will result in a no net increase in the amount of impervious cover; 2. Will result in no further encroachment into the RPA; and 3. Will conform to chapter 11.1 (Erosion and Stormwater Management) of this Code and the Virginia Erosion and Stormwater Management Regulations, as well as all applicable stormwater management requirements of other state and federal agencies. c. It constitutes development or redevelopment within a designated Intensely Developed Area. d. It is a new use according to subsection (c)(4) of this section (permitted encroachments into the buffer area). e. It is a road or driveway crossing not exempt under subsection 9.1-12(b)(1) and meets the following conditions: 1. The city finds that there exists no reasonable alternative to aligning the road or driveway in or across the RPA; 2. The alignment and design of the road or driveway are optimized, consistent with other applicable requirements, to minimize encroachments in the RPA and adverse effects to water quality; 3. The design and construction of the road or driveway satisfy all applicable criteria of this chapter; including the submission of a water quality impact assessment; and 4. The proposal is reviewed in coordination with the site plan, subdivision and plan of development review processes. f. It is a flood control or stormwater management facility that drains or treats water from multiple development projects or from a significant portion of a watershed, which meets the following: 1. The location of the facility has been found to be the optimum location by the city; 2. The size of the facility is the minimum necessary to provide the necessary flood control, stormwater treatment or both; 3. The facility is consistent with a comprehensive stormwater management plan developed and approved in accordance with chapter 11.1 (Erosion and Stormwater Management) of this Code and the Virginia Erosion and Stormwater Management Regulations; 4. All applicable permits for work in and around state and federal waters have been obtained and received prior to construction; 5. Approval must be received from the city prior to construction; and 6. Routine maintenance may be performed on such facilities to assure that they continue to function as designed. (2) Exemptions in RPAs. The following land disturbances in the Resource Protection Area may be considered exempt: a. Water wells; passive recreational facilities such as boardwalks, trails and pathways; and historic preservation and archaeological activities, provided that they comply with the following: 1. The land disturbance undergoes an administrative review, pursuant to subsection 9.1-10(c), prior to approval; and 2. Any land disturbance exceeding an area of 2,500 square feet shall comply with chapter 11.1 (Erosion and Stormwater Management) of this Code and the Virginia Erosion and Stormwater Management Regulations. b. A living shoreline as defined by Code of Virginia, § 28.2-104.1 may be exempt from additional performance criteria requirements, including a water quality impact assessment in accordance with subsection 9.1-11(e), provide the project minimizes land disturbance, maintains or establishes a vegetative buffer inland of the living shoreline, and complies with the fill conditions in subsection 9.1-10(c)(5)f.4. (3) Buffer area requirements. To minimize the adverse effects of human activities on the other components of Resource Protection Areas, state waters, and aquatic life, a 100-foot buffer area of vegetation that is effective in retarding runoff, preventing erosion, and filtering nonpoint source pollution from runoff shall be retained if present and established where it does not exist. Where such buffer must be established, the planting of trees shall be incorporated as appropriate to site conditions and in such a manner to maximize the buffer function. Inclusion of native species in tree planting is preferred. The buffer area shall be located adjacent to and landward of other RPA components and along both sides of any water bodies with perennial flow. The full buffer area shall be designated as the landward component of the RPA, in accordance with sections 9.1-4 and 9.1-11. Notwithstanding permitted uses, encroachments, and vegetation clearing as set forth in this section, the 100-foot wide buffer area is not reduced in width. The 100-foot buffer area shall be deemed to achieve a 75 percent reduction of sediments and a 40 percent reduction of nutrients. (4) Permitted encroachments into the buffer area. a. When the application of the buffer area would result in the loss of a buildable area on a lot or parcel recorded prior to October 1, 1989, the director of planning, after consulting with the city engineer, may allow encroachments into the buffer in accordance with the following criteria: 1. Encroachments into the buffer areas shall be the minimum necessary to achieve a reasonable buildable area for a principal structure and necessary utilities; 2. Where practicable, a vegetated area that will maximize water quality protection, mitigate the effects of the buffer encroachment, and is equal to the area of encroachment into the buffer area shall be established elsewhere on the lot or parcel. Where such buffer must be established, the planting of trees shall be incorporated as appropriate to site conditions and in such a manner to maximize the buffer function. Inclusion of native species in tree planting is preferred; and 3. The encroachment may not exceed into the seaward 50 feet of the buffer area. b. When the application of the buffer area would result in the loss of a buildable area on a lot or parcel recorded between October 1, 1989, and March 1, 2002, encroachments may be allowed through the exception process described in subsection 9.1-12(c) in accordance with the following criteria: 1. The lot or parcel was created as a result of a legal process conducted in conformance with chapter 33.1 (Subdivisions) of this Code; 2. Conditions or mitigation measures imposed through a previously approved exception shall be met; 3. If the use of a best management practice (BMP) was previously required, the BMP shall be evaluated to determine if it continues to function effectively and, if necessary, the BMP shall be reestablished or repaired and maintained, as required; and 4. The requirements set forth in subsections (4)a.1.—(4)a.3. of this section have been met. (5) Permitted modifications of the buffer area. In order to achieve the functional value of the buffer, existing vegetation may be removed, subject to approval by the city planning director, only to provide for reasonable sight lines, access paths, general woodlot management, and best management practices, including those that prevent upland erosion and concentrated flows of stormwater, as follows: a. In general, where the removal of trees within the buffer area is proposed, mature trees shall be preserved and trimmed or pruned in lieu of removal as site conditions permit and removal should be limited to the fewest number of trees feasible. Where tree planting for mitigation, conservation landscaping, or for buffer establishment is proposed, inclusion of native species in tree planting is preferred. b. Trees may be pruned or thinned as necessary to provide for reasonable sight lines, vistas, and access paths, provided that, where removed, they shall be replaced with other vegetation that is equally effective in retarding runoff, preventing erosion, and filtering nonpoint source pollution from runoff. When trees are proposed for removal, they shall be replaced with trees as appropriate to site conditions and in such a manner as to maximize the buffer function and to protect the quality of state waters. c. Any path shall be constructed and surfaced as to effectively control erosion. d Dead, diseased, or dying trees or shrubbery and noxious weeds such as Johnson grass, kudzu and multiflora rose may be removed and thinning of trees may be allowed, pursuant to sound horticulture practice. e. For shoreline erosion projects, trees and woody vegetation may be removed, necessary control techniques employed, and appropriate vegetation established to protect or stabilize the shoreline in accordance with the best available technical advice and applicable permit conditions or requirements. Mature trees shall be removed only as necessary for the installation and maintenance of the project consistent with the best available technical advice, project plans, and applicable permit conditions or requirements. Trees shall be utilized in the project when vegetation is being established as appropriate to the site conditions and project specifications. Inclusion of native species in tree planting is preferred. f. Adaptation measures proposed for location within the Resource Protection Area shall meet the following conditions: 1. The selected adaptation measure shall be a nature-based solution that uses environmental processes, natural systems, or natural features identified as being appropriate for existing site conditions. 2. An identified adaptation measure shall be selected from one of the following sources: Chesapeake Bay program approved BMP list, the Virginia Stormwater BMP Clearinghouse, the VMRC Tidal Wetlands Guidelines, or be a project that is eligible for funding by the Virginia Community Flood Preparedness Fund Grant. Adaptation measures should consist of trees, vegetation, or stone, or enhance existing natural elements. 3. Adaptation measures approved for use in the RPA shall be designed, installed, and maintained in accordance with the applicable specifications for the selected adaptation measure. 4. The use of fill as a component of an adaptation measure may be permitted, provided it meets the following conditions: a. The grading and slope created by the use of fill shall be no greater than necessary based upon the project specifications and implemented in a manner that minimizes the impact of run-off. b. Fill shall have the necessary biogeochemical characteristics, including sufficient organic content, to support the growth of vegetation and adequate permeability to allow infiltration consistent with project specifications. c. The use of full shall not exacerbate stormwater run-off and lateral flow onto adjacent properties shall be controlled. d. Any impacts on the management of stormwater upland of the Resource Protection Area created by the use of fill shall be mitigated as necessary. e. The use of fill shall be consistent with chapter 14.1 (Flood Protection). 5. The preservation of existing natural vegetation, including mature trees, shall be maximized and land disturbance consistent with design specifications shall be minimized. 6. Adaptation measures shall comply with all federal, state, and local requirements, including the need for a water quality impact assessment. 7. Nothing in these provisions shall be construed to authorize approval or allowance of an adaptation measure in contravention of floodplain management requirements, including chapter 14.1 (Flood Protection). (6) Buffer area requirements for Intensely Developed Areas. In the Intensely Developed Area the director of planning may, after consulting with the city engineer, exercise discretion regarding whether to require the establishment of vegetation in the 100-foot-wide buffer area. However, while the immediate establishment of vegetation in the buffer area may be impractical, consideration to implementing measures that would establish vegetation in the buffer in these areas over time shall be considered in order to maximize water quality protection, pollutant removal and water resource conservation. Where practicable, the planting of trees, including native species, as a component of such buffer reestablishment measures shall be encouraged.
(Code 1988, § 9.1-10; Ord. No. 2004-02, § 1, 1-13-2004; Ord. No. 2005-04, § 2, 1-11-2005; Ord. No. 2009-88, § 1, 8-25-2009; Ord. No. 2025-100, § 1(Exh. A), 11-25-2025)
Ask a question about Portsmouth law
Corpus searches the Portsmouth sections it holds and shows the ones that match, with their citations. Free, no sign-in.
