For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 9.1-11 — Plan of development process

Code of the City of Portsmouth, Virginia (Codified through Ordinance No. 2026-64, enacted June 23, 2026. (Supp. No. 66)) · Portsmouth City Code § 9.1-11

Corpus is an independent public-information project, not the official City of Portsmouth website. Stable reference: corpuslaw.us/code/09b47b0f-632f-413d-8b65-96f5e2e0a0df

Sec. 9.1-11. - Plan of development process.

Any land disturbance, development or redevelopment exceeding 2,500 square feet of land disturbance shall be accomplished through a plan of development process prior to any clearing or grading of the site or the issuance of any building permit, to assure compliance with all applicable requirements of this chapter. The fee for review of plans of development for compliance with this chapter (exclusive of any other applicable fees for review of the plan of development) shall be as set forth in appendix A to this Code. Notwithstanding the provisions above, no clearing or grading of any lot or parcel shall be permitted without an approved clearing plan. For existing single-family lots, a clearing line shown on the plat plan normally submitted as part of the building permit application shall satisfy clearing plan requirements. No clearing or grading shall occur on existing single-family lots until a complete building permit application is approved. (a) Required information. In addition to the requirements of the zoning ordinance set out in chapter 40.2, or the requirements of chapter 33.1 regarding subdivisions, the plan of development process shall consist of the plans and studies identified below. The following plans or studies shall be submitted, unless otherwise directed: (1) A site plan in accordance with the provisions of the zoning ordinance set out in chapter 40.2 or a subdivision plat in accordance with the provisions of chapter 33.1 ; (2) An environment site assessment; (3) A landscaping plan; (4) An erosion and stormwater management plan in accordance with the provisions of chapter 11.1 (Erosion and Stormwater Management) of the Code and the Virginia Erosion and Stormwater Management Program; (5) A water quality impact assessment as necessary under the requirements of subsection 9.1-11(e). (6) A resiliency assessment as necessary under the requirements of subsection 9.1-11(f). (b) Environmental site assessment. An environmental site assessment shall be submitted in conjunction with a preliminary site plan or preliminary subdivision plan approval for the purposes of determining the site-specific boundaries of the RPA. (1) The environmental site assessment shall be drawn to scale and clearly delineate the following environmental features: a. Tidal wetlands; b. Tidal shores; c. Nontidal wetlands connected by surface flow and contiguous to tidal wetlands or water bodies with perennial flow; d. A 100-foot buffer area located adjacent to and landward of the components listed in subsections (b)(1)a. through (b)(1)c. of this section, and any water bodies with perennial flow; and e. Other sensitive environmental features as determined by the city engineer. (2) Wetlands delineations shall be performed consistent with the procedures specified in the Federal Manual for Identifying and Delineating Jurisdictional Wetlands, 1987. (3) The environmental site assessment shall delineate the site-specific geographic extent of the RPA. (4) The environmental site assessment shall be drawn at the same scale as the preliminary site plan or subdivision plat, and shall be certified as complete and accurate by a professional engineer or a certified land surveyor. This requirement may be waived by the city engineer when the proposed use of development would result in less than 5,000 square feet of disturbed area. (c) Landscaping plan. A landscaping plan shall be submitted in conjunction with site plan approval or as part of subdivision plat approval. No clearing or grading of any lot or parcel shall be permitted without a prior approved landscaping plan. Landscaping plans shall be prepared and certified by design professionals practicing within their areas of competence as prescribed by the Code of Virginia. (1) Contents of the plan. a. The landscaping plan shall be drawn to scale and clearly delineate the location, size, and description of existing and proposed plant material. All existing trees on the site two inches or greater DBH shall be shown on the landscaping plan. Where there are groups of five or more trees, stands may be outlined instead, except for mature trees, which shall be individually identified. The specific number of trees two inches or greater DBH to be preserved outside of the construction footprint shall be indicated on the plan. Trees to be removed shall be clearly delineated on the landscaping plan. The plan shall be consistent with chapter 36, article III of this Code. Mature trees shall be protected during development and only removed where necessary, including to provide for the proposed use or development. b. Any required buffer area shall be clearly delineated and any plant material to be added to establish or supplement the buffer area, as required by this chapter, shall be shown on the landscaping plan. Trees should be used for mitigation and supplementation of the buffer area to the extent practicable and as appropriate to the site conditions and project specifications. Where possible use of native species is preferred. c. Within the buffer area, trees to be removed for sight lines, vistas, access paths, and best management practices, as provided for in this chapter, shall be shown on the plan. Mature trees shall be preserved and trimmed or pruned in lieu of removal as site conditions permit. Any removal of mature trees should be limited to the fewest number of trees feasible. When mature trees are removed to provide for site lines and vistas, access paths, or BMPs, they shall be replaced with trees as appropriate to site conditions. Vegetation required by this chapter to replace any existing trees within the buffer area shall also be shown on the landscaping plan. d. Trees to be removed for shoreline stabilization projects and any replacement vegetation required by this chapter shall be shown on the landscaping plan. e. The plan shall depict grade changes or other work adjacent to trees, which would affect them adversely. Specifications shall be provided as to how grade, drainage, and aeration would be maintained around trees to be preserved. Specifications shall also be provided for the protection of existing trees and vegetation during site work and construction. f. The landscaping plan will include specifications for the protection of existing trees during clearing, grading, and all phases of construction, consistent with such measures as described in the Landscape Planting and Protection Manual, Portsmouth, Virginia. (2) Plant specifications. a. All plant materials necessary to supplement the buffer area or vegetated areas outside the construction footprint shall be installed in accordance with the specifications referred to in subsection 40.2-304(J). b. All supplementary or replacement plant materials shall be living and in a healthy condition. Plant materials shall conform to the standards of the most recent edition of the American Standard for Nursery Stock, published by the American Association of Nurserymen. c. Where areas to be preserved, as designated on an approved landscaping plan, are encroached, replacement of existing trees and other vegetation will be achieved at a ratio of three planted trees to one removed. Replacement trees shall be a minimum of one and one-half inches DBH at the time of planting. (3) Maintenance. The applicant shall be responsible for the maintenance and replacement of all vegetation as may be required by the provisions of this chapter. In buffer areas and areas outside the construction footprint, plant material shall be tended and maintained in a healthy growing condition and free from refuse and debris. Unhealthy, dying, or dead plant materials shall be replaced during the next planting season, as required by the provisions of this chapter. (d) Erosion and stormwater management plan. A stormwater management plan shall be submitted as part of the plan of development process required by this chapter and in conjunction with site plan or subdivision plan approval. (1) Contents of the plan. The stormwater management plan shall contain maps, charts, graphs, tables, photographs, narrative descriptions, explanations, and citations to supporting references as appropriate to communicate the information required by this chapter. At a minimum, the stormwater management plan must contain the following: a. Location and design of all planned stormwater control devices; b. Procedures for implementing nonstructural stormwater control practices and techniques which can be described in narrative form; c. Pre-development and post-development nonpoint source pollutant loadings with supporting documentation of all utilized coefficients and calculation; and d. For facilities, verification of structural soundness, including a professional engineer or class IIIB surveyor certification. (2) Site-specific facilities. Site-specific facilities shall be designed for the ultimate development of the contributing watershed based on zoning, comprehensive plans, local public facility master plans, or other similar planning document. (3) Engineering calculations. All engineering calculations must be performed in accordance with procedures outlined in the current edition of the Virginia Erosion and Stormwater Management Program and the corresponding Virginia Stormwater Management Handbook Version 1.1 or later. (4) Inspection and maintenance schedule. The plan shall establish a long-term schedule for inspection and maintenance of stormwater management facilities that include all maintenance requirements and the identities of persons responsible for performing maintenance. If the designated maintenance responsibility is with a party other than the city, a maintenance agreement shall be executed between the responsible party and the city. (e) Water quality impact assessment. (1) Purpose and intent. The purpose of the water quality impact assessment is to: a. Identify the impacts of proposed development, redevelopment or land disturbance on water quality and lands within RPAs and other environmentally sensitive lands; b. Ensure that, where development, redevelopment, or land disturbance is proposed to take place within RPAs and other sensitive lands, it will be located on those portions of a site and in a manner that will be least disruptive to the natural functions of RPAs and other sensitive lands; c. To protect individuals from investing funds for improvements proposed for location on lands unsuited for such development because of high ground water, erosion, or vulnerability to flood and storm damage; d. Provide for administrative relief from the terms of this chapter when warranted and in accordance with the requirements contained herein; and e. Specify mitigation which will address the water quality impacts of proposed land disturbance, development, or redevelopment. (2) Water quality impact assessment required. A water quality impact assessment is required for: (i) any proposed land disturbance, development, or redevelopment, within an RPA, (ii) any development in a RMA as deemed necessary by the city engineer due to the unique characteristics of the site or intensity of the proposed development. There shall be two levels of water quality impact assessments: a minor assessment and a major assessment. (3) Minor water quality impact assessment. A minor water quality impact assessment pertains only to development within an RPA, which causes no more than 5,000 square feet of land disturbance. Submission of a plan of development that demonstrates through the use of calculations provided for by subsection(d)(1) of this section that the remaining buffer area and necessary best management practices will result in removal of no less than 75 percent of sediments and 40 percent of nutrients from post-development stormwater runoff shall be deemed to have satisfied the requirement for a minor water quality impact assessment. The following elements shall be included in the preparation and submission of a minor water quality assessment: a. Site plan indicating the location of the components of the RPA, including the 100-foot buffer area, and the RMA (or indication that the remainder of the parcel is designated RMA); b. Location and nature of the proposed encroachment into the buffer area, including: type of paving material, limits for areas of clearing or grading, location of any existing and proposed structures, drives for other impervious cover, sewage disposal systems or reserve drainfield sites, and a calculation of area of land disturbance within the RPA; and c. Type and location of proposed vegetative mitigation and other best management practices to mitigate the proposed encroachment. (4) Major water quality impact assessment. A major water quality impact assessment shall be required for any development which: (i) exceeds 5,000 square feet of land disturbance within an RPA; or (ii) is located in a RMA and is deemed necessary by the city engineer. The information required in this section shall be considered a minimum. The following elements shall be included in the preparation and submission of a major water quality assessment: a. All of the information required in a minor water quality impact assessment, as specified in subsection (e)(3) of this section; b. A hydrogeological element that: 1. Describes the existing topography, soils, hydrology and geology of the site and adjacent lands; 2. Describes the impacts of the proposed development on topography, soils, hydrology and geology on the site and adjacent lands; 3. Indicates the disturbance or destruction of wetlands and justification for such action; 4. Indicates the disruptions or reductions in the supply of water to wetlands, streams, lakes, rivers or other water bodies; 5. Indicates the disruptions to existing hydrology including wetland and stream circulation patterns; 6. Indicates the source location and description of proposed fill material; 7. Indicates the location of dredge material and location of dumping area for such material; 8. Indicates the location of and impacts on shellfish beds, submerged aquatic vegetation, and fish spawning areas; and 9. Describes the proposed mitigation measures for the potential hydrogeological impacts which may include: (i) Proposed erosion and sediment control concepts which may include minimizing the extent of the cleared area, perimeter controls, reduction of runoff velocities, measures to stabilize disturbed areas, schedule and personnel for site inspection; (ii) Proposed stormwater management system; (iii) Creation of wetlands to replace those lost; and (iv) Minimizing cut and fill. c. A landscape element that describes the proposed measures for mitigation of the water quality and land impacts within CBPAs. Possible mitigation measures include: 1. Replanting schedule for trees and other significant vegetation removed for construction, in accordance with section 40.2-304(J) of this Code. 2. Demonstration that the design of the plan will preserve to the greatest extent possible any significant trees and vegetation on the site and will provide maximum erosion control and overland flow benefits from such vegetation. 3. Demonstration that indigenous plants are to be used to the greatest extent possible. (5) Evaluation procedure. a. Upon the completed review of a minor water quality impact assessment, the city engineer will determine if the following criteria have been satisfied: 1. The proposed encroachment is necessary due to the inability to place improvements elsewhere on the site to avoid disturbance of the buffer area; 2. Land disturbance and impervious surfaces area is minimized and existing vegetation is preserved to the extent practicable given the site conditions and the proposed use; 3. Proposed vegetative mitigation measures, including the revegetation plan and site design, result in minimal disturbance to all components of the RPA, including the 100-foot buffer area; 4. Additional best management practices proposed, where required, achieve the requisite reductions in pollutant loadings; ; and 5. The development, as proposed, meets the purpose and intent of this chapter. b. Upon the completed review of a major water quality impact assessment, the city engineer will determine if the proposed development is consistent with the purpose and intent of this chapter and that the following criteria have been satisfied: 1. Within any RPA, the proposed development is a water-dependent facility or redevelopment; 2. The disturbance of any wetlands will be minimized and the applicant will provide a statement on the plans that wetland permits will be obtained prior to the issuance of any other permits or approvals; 3. Proposed erosion and sediment control concepts are adequate to achieve the reductions in runoff and prevent off-site sedimentation; 4. Proposed stormwater management concepts are adequate to control the stormwater runoff to achieve the required performance standard for pollutant control; 5. Proposed revegetation of disturbed areas will provide optimum erosion and sediment control benefits and water quality improvements, including retarding runoff, preventing erosion, and filtering nonpoint source pollution; 6. The cumulative impact of the proposed development, when considered in relation to other development in the vicinity, both existing and proposed, will not result in a significant degradation of water quality; and 7. The development, as proposed, is consistent with the purpose and intent of this chapter. c. The city engineer shall require additional mitigation where potential impacts have not been adequately addressed. Evaluation of mitigation measures will be made by the city engineer based on the criteria listed in subsections (e)(5)a. and (e)(5)b. of this section. (f) Resiliency assessment. (1) Purpose and intent. The purpose of the resiliency assessment is to: a. Identify the potential impacts on proposed development of sea-level rise, storm surge, and flooding within the RPA; b. Assess such impacts on the buffer function considering proposed development; and c. Identify alterations, conditions, or adaptation measures where necessary and appropriate. (2) Resiliency assessment required. A resiliency assessment is required for any proposed development within an RPA in addition to all other requirements of this and other local ordinances. A resiliency assessment will be based upon the RPA as delineated at the time of the proposed land development. (3) The following elements shall be included in the preparation and submission of a resiliency assessment: a. A scaled drawing of the proposed development that includes the RPA and RMA boundaries, required setbacks, existing topography, and a graphic depiction of the anticipated impacts of sea level rise, flooding, and storm surge on the parcel and the proposed project, based upon a review of approved models and forecasts, to include the following: 1. For sea-level rise, the 2017 National Oceanographic and Atmospheric Administration (NOAA) Intermediate-High scenario projection curve (or any subsequently updated version thereof) on the project site. Sea level rise data can be accessed on the AdaptVA website, maintained by the Virginia Institute of Marine Science (VIMS). 2. For storm surge, the most up to date NOAA hydrodynamic Sea, Lake, and Overland Surges Hurricanes (SLOSH) model. Storm surge data can be accessed on the AdaptVA website. Category 1 storm surge data should be used. 3. For flooding, the most up to date Special Flood Hazard Area (SFHA) and the Limit of Moderate Wave Action (LIMWA) model according to the Virginia Flood Risk Information System (VFRIS) model in conjunction with the requirements and application of Chapter 14.1 Flood Protection. VFRIS includes the Flood Insurance Rate Maps, flood insurance studies, and associated models produced by the Federal Emergency Management Agency, and is available on the Virginia Department of Conservation and Recreation (DCR) website. This data is also accessible on the AdaptVA website. 4. The anticipated impacts shall be based upon a 30 year timeframe. b. A narrative report that analyzes the results of the data and graphic research, and provides the following information: 1. Identification of any proposed impact directly from proposed impervious cover or structures in the RPA and the extent of such impact. 2. Identification of extent of impact on the current buffer area including impacts to existing vegetation from the landward movement of water and vegetative migration. 3. Describe the extent to which anticipated impacts can be or have been mitigated by altering the location design, size, or orientation of proposed structures or impervious cover, by preserving and/or supplementing existing buffer areas, and/or by considering other limiting site conditions including required setbacks and parcel size, and/or by proposing an adaptation measure. c. The director of planning will review the resiliency assessment along with the water quality impact assessment and determine whether the anticipated impacts necessitate an alteration or conditions to the proposed project or implementation of an adaptation measure for approval. 1. In considering whether a requirement for project alteration or adaptation measure is appropriate, the planning director will ensure that the proposed alteration or adaptation is practical, achievable, and necessary to mitigate the identified impact. 2. Where possible, consideration will be given to modifying the proposed development size or location, such that the extent of land disturbance or impervious cover can be reduced to avoid or minimize the area or areas of the parcel that the assessment indicates will be impacted. 3. Should an impact from sea-level rise, storm surge, or flooding be identified that exceeds available design alterations, approval of the proposed project will be conditioned with the requirement for an adaptation measure pursuant to section 9.1-10(c)(5)f. (g) Final plan. Final plans for property within CBPAs shall be final plats for land to be subdivided or site plans for land not to be subdivided as required in the zoning ordinance. (1) Final plans for all lands within CBPAs shall include the following additional information: a. The depiction of RPA and RMA boundaries; b. Notation on plats of 1) the requirement to retain an undisturbed and vegetated 100-foot wide buffer area and 2) the permissibility of only water-dependent facilities or redevelopment in Resource Protection Areas; c. The delineation of the buildable areas that are allowed on each lot based on the performance criteria specified in section 9.1-10(b) of this chapter, front, site, and rear yard setback requirements, and any other relevant easements or limitations regarding lot coverage; d. All wetlands permits required by law; and e. A maintenance agreement as deemed necessary and appropriate by the city engineer to ensure proper maintenance of best management practices in order to continue their functions. (2) Installation and bonding requirements. a. Where buffer areas, landscaping, stormwater management facilities or other specifications of an approved plan are required, no certificate of occupancy shall be issued until the installation of required plant materials or facilities is completed, in accordance with the approved site plan. b. When the occupancy of a structure is desired prior to the completion of the required vegetative mitigation landscaping, stormwater management facilities, or other specifications of an approved plan, a certificate of occupancy may be issued only if the applicant provides to the city a form of surety satisfactory to the city attorney in an amount equal to the value of the remaining plant materials, related materials, and installation costs of the required landscaping or other specifications or maintenance costs for any required stormwater management facilities. c. All required vegetative mitigation landscaping shall be installed and approved by the first planting season following issuance of a certificate of occupancy or the surety may be forfeited to the city. d. All required stormwater management facilities or other specifications shall be installed and approved within 18 months of project commencement. Should the applicant fail, after proper notice, to initiate, complete or maintain appropriate actions required by the approved plan, the surety may be forfeited to the city. The city may collect from the applicant the amount by which the reasonable cost of required actions exceeds the amount of the surety held. e. After all required actions of the approved site plan have been completed, the applicant must submit a written request for a final inspection. If the requirements of the approved plan have been completed to the satisfaction of the city engineer, such unexpended or unobligated portion of the surety held shall be refunded to the applicant or terminated within 60 days following the receipt of the applicant's request for final inspection. The city engineer may require a certificate of substantial completion from a professional engineer or class IIIB surveyor before making a final inspection. (h) Administrative responsibility. Administration of the plan of development process shall be in accordance with the zoning ordinance set out in chapter 40.2 or chapter 33.1 regarding subdivisions. (i) Denial of plan, appeal of conditions or modifications. In the event the final plan or any component of the plan of development process is disapproved and recommended conditions or modifications are unacceptable to the applicant, the applicant may appeal such administrative decision to the circuit court having jurisdiction over the land in accordance with the procedures set forth in section 33.1-9 of the Code.

(Code 1988, § 9.1-11; Ord. No. 2004-02, § 1, 1-13-2004; Ord. No. 2005-04, § 2, 1-11-2005; Ord. No. 2006-87, § 1, 9-26-2006; Ord. No. 2009-88, § 1, 8-25-2009; Ord. No. 2020-34, § 6, 5-12-2020; Ord. No. 2025-100, § 1(Exh. A), 11-25-2025)

Ask a question about Portsmouth law

Corpus searches the Portsmouth sections it holds and shows the ones that match, with their citations. Free, no sign-in.