§ 26-55 — Measurement, sampling, etc., and report of discharges
Code of Ordinances of the City of Roanoke, Virginia (Codified through Ordinance No. 43473, enacted September 21, 2026. (Supp. No. 95, Update 1)) · Roanoke Code of Ordinances § 26-55
Corpus is an independent public-information project, not the official City of Roanoke website. Stable reference: corpuslaw.us/code/fd06181e-92e1-4a2d-b2c2-0cd72312fe5e
Sec. 26-55. - Measurement, sampling, etc., and report of discharges.
(a) The owner of each facility discharging other than normal wastewater or discharging Group A wastewater shall upon the written request of the control authority submit monthly, or at other frequency as may be required by the control authority, to the WVWA, on forms supplied by the WVWA, a certified statement of the quantities of its wastes discharged into the sewers and sewage works of the WVWA or into any sewer connected therewith. Copies of pertinent water bills may be required to be submitted with the above statement. Such documents shall be filed with the WVWA not later than the tenth day of the following month. A separate statement shall be filed for each industrial plant. The total quantities of wastes to be measured and certified by the person so discharging shall be established by the control authority and shall, as a minimum, include: (1) Liquid in gallons. (2) Five-day BOD in pounds. (3) Suspended solids in pounds, on a dry solids basis. (4) Total phosphorus in pounds. (5) Total Kjeldahl nitrogen in pounds. (6) COD in pounds. (b) Unless otherwise provided, each measurement, test, sampling, or analysis required to be made hereunder shall be made in accordance with 40 C.F.R. Part 136, as amended. (c) In order to provide for accurate sampling and measurement of industrial wastes, each person discharging Group A wastewater, or other regulated wastewater, if deemed necessary by the control authority, shall provide and maintain, on each of its industrial waste outlet sewers, a large manhole or sampling chamber to be located outside or near its plant boundary line, where feasible. If inside the plant fence, there shall be a gate near the sampling chamber with a key furnished to the WVWA. There shall be ample room provided in each sampling chamber to enable convenient inspection and sampling by the WVWA and/or the city. (d) Each sampling chamber shall contain a Parshall flume, accurate weir or similar device, with a recording and totalizing register for measurement of the liquid quantity; or the metered water supply to the industrial plant may be used as the liquid quantity, where it is substantiated that the metered water supply and waste quantities are approximately the same, or where a measurable adjustment can be made in the metered supply to determine the liquid quantity. (e) Composite samples shall consist of samples taken at least every hour for the time period required by the facility's permit using flow proportional or time composite sample collection methods. Such samples shall be properly refrigerated. For oil and grease, pH, phenols, cyanide, volatile toxic organics and other appropriate pollutants, proper grab sampling shall be performed. Such sampling shall be repeated on as many days as necessary to insure representative quantities for the entire reporting period. Industrial plants with wide fluctuations in quantities of wastes shall provide an automatic sampler paced automatically by the flow-measuring device. (f) Minimum requirements for representative quantities under the section shall include a re-evaluation during each twelve-month period. The frequency of sampling, sampling chamber, metering device, sampling methods and analyses of samples shall be subject, at any time to inspection and verification by the city. Sampling and measuring facilities shall be such as to provide access for authorized personnel of the city for making such inspection and verification. (g) Plans for sampling chambers, with their location shown on a site plan, shall be submitted to the city. (h) All owners of facilities governed by this section shall also comply with any applicable monitoring requirements and regulations established by the control authority which are hereby incorporated by reference. (i) All owners of facilities governed by this article shall comply with the applicable requirements of 40 C.F.R. 403.12, as amended, which is incorporated by reference herein, including, without limitation, the signatory, certification and record keeping requirements of 40 C.F.R. 403.12(c), (d) and (1). All records shall be retained for a minimum of three (3) years and this retention period shall be extended during litigation or upon request of the control authority.
(Ord. No. 23599, § 14, 5-2-77; Ord. No. 27103, § 2, 7-9-84; Ord. No. 29632, §§ 1, 2, 7-10-84; Ord. No. 31591, § 2, 7-12-93; Ord. No. 36147, § 1, 12-2-02; Ord. No. 36739, § 1, 6-21-04)
Ask a question about Roanoke law
Corpus searches the Roanoke sections it holds and shows the ones that match, with their citations. Free, no sign-in.