§ 26-56 — Discharge permits for industrial waste

Code of Ordinances of the City of Roanoke, Virginia (Codified through Ordinance No. 43473, enacted September 21, 2026. (Supp. No. 95, Update 1)) · Roanoke Code of Ordinances § 26-56

Corpus is an independent public-information project, not the official City of Roanoke website. Stable reference: corpuslaw.us/code/e34f4c6b-5bea-4906-8a78-0f83bf86a6c0

Sec. 26-56. - Discharge permits for industrial waste.

(a) It shall be unlawful for any significant industrial user or other user as determined by the control authority to discharge industrial waste into the public sanitary sewer system unless an appropriate industrial discharge permit has been issued by the control authority. In order to obtain an industrial discharge permit, such person shall: (1) Submit a complete application at least ninety (90) days prior to the date proposed for initial discharge on forms supplied by the control authority. The control authority will act upon the application within sixty (60) days. (2) Comply with all requirements for the discharge permit including, but not limited to, provisions for payment of charges, installation and operation of pretreatment facilities and sampling and analysis to determine quantity and strength. (3) Provide a sampling point subject to the provisions of this article and approval of the control authority. (4) Comply with the requirements of federal categorical standards, where applicable, including the development of any required compliance schedules or the applicable provisions of this article. (b) An industrial user applying for a new discharge shall meet all conditions of subsection (a) of this section and shall secure a permit prior to discharging any waste. (c) Prior advance notification by the discharger to the control authority of any substantial change in volume or character of the discharge shall be required. Upon such notification, the control authority shall have the legal authority to deny or condition any new or increased discharge or any changes in the nature of the discharge if the discharge does not meet pretreatment standards, requirements or if the discharge would cause the plant to violate its Virginia Pollutant Discharge Elimination System (VPDES) permit. (d) A person not applying for a discharge permit within the allotted time and continuing to discharge an unpermitted discharge shall be deemed to be in violation of this article. (e) A permit issued under this section shall be valid for up to five (5) years from its date of issuance, after which time the industrial user shall be required to obtain a new discharge permit. (f) An industrial user governed by this section may allow any bypass to occur which does not cause pretreatment standards or requirements to be violated, but only if it also is for essential maintenance to assure efficient operation. These bypasses are not subject to the provision of paragraphs (g) and (h). (g) If an industrial user knows in advance of the need for a bypass, it shall submit prior notice to the control authority, at least ten (10) days before the date of the bypass, if possible. An industrial user will immediately notify the POTW of any unanticipated bypass. A written report must be submitted within five (5) days. (h) Bypass is prohibited, and the control authority may take an enforcement action against an industrial user for a bypass, unless: (1) Bypass was unavoidable to prevent loss of life, personal injury, or severe property damage; (2) There were no feasible alternatives to the bypass, such as the use of auxiliary treatment facilities, retention of untreated wastes, or maintenance during normal periods of equipment downtime. This condition is not satisfied if adequate back-up equipment should have been installed in the exercise of reasonable engineering judgment to prevent a bypass which occurred during normal periods of equipment downtime or preventive maintenance; or (3) The industrial user submitted notices as required under paragraph (c) of this section. (i) The control authority may approve an anticipated bypass, after considering its adverse effects, if the control authority determines that it will meet the three (3) conditions listed in paragraph (h) of this section. (j) An upset shall constitute an affirmative defense to an action brought for noncompliance with categorical pretreatment standards if the following requirements are met: (1) An industrial user who wishes to establish the affirmative defense of upset shall demonstrate, through properly signed, contemporaneous operating logs or other relevant evidence that: a. An upset occurred and the industrial user can identify the cause(s) of the upset. b. The facility was at the time being operated in a prudent and workmanlike manner and in compliance with applicable operation and maintenance procedures. c. The industrial user has submitted the following information to the control authority within twenty-four (24) hours of becoming aware of the upset [if this information is provided orally, a written submission must be provided within five (5) days]: 1. A description of the indirect discharge and cause of noncompliance; 2. The period of noncompliance, including exact dates and times, or if not corrected, the anticipated time the noncompliance is expected to continue; and 3. Steps being taken and/or planned to reduce, eliminate, and prevent recurrence of the noncompliance. (2) In any enforcement proceeding, the industrial user seeking to establish the occurrence of an upset shall have the burden of proof. (3) Industrial users will have the opportunity for a judicial determination on any claim of upset only in an enforcement action brought for noncompliance with categorical pretreatment standards. (4) Industrial users shall control production of all discharges to the extent necessary to maintain compliance with categorical pretreatment standards upon reduction, loss, or failure of its treatment facility until the facility is restored or an alternative method of treatment is provided. The requirement applies in the situation where, among other things, the primary source of power of the treatment facility is reduced, lost, or fails. (k) All owners of facilities governed by industrial wastewater permits issued pursuant to this section shall also comply with any applicable reporting requirements, including but not limited to: (1) Baseline monitoring reports. a. Within either one hundred eighty (180) days after the effective date of a categorical pretreatment standard, or the final administrative decision on a category determination under 40 CFR 403.6(a)(4), whichever is later, existing categorical users currently discharging to or scheduled to discharge to the POTW shall submit to the control authority a report which contains the information listed in paragraph (b) below. At least ninety (90) days prior to commencement of their discharge, new sources, and sources that become categorical users subsequent to the promulgation of an applicable categorical standard, shall submit to the control authority a report which contains the information listed in paragraph (b), below. A new source shall report the method of pretreatment it intends to use to meet applicable categorical standards. A new source also shall give estimates of its anticipated flow and quantity of pollutants to be discharged. b. Industrial users described above shall submit the information set forth below: 1. Identifying information. The name and address of the facility, including the name of the operator and owner. 2. Environmental permits. A list of any environmental control permits held by or for the facility. 3. Description of operations. A brief description of the nature, average rate of production, and standard industrial classifications of the operation(s) carried out by such industrial user. This description should include a schematic process diagram which indicates points of discharge to the POTW from regulated processes. 4. Flow measurement. Information showing the measured or estimated average daily and maximum daily flow, in gallons per day, to the POTW from regulated process streams and other streams, as necessary, to allow use of the combined wastestreams formula set out in 40 CFR 403.6(e). 5. Measurement of pollutants. (i) The categorical pretreatment standards applicable to each regulated process. (ii) The results of sampling and analysis identifying the nature and concentration, and/or mass, where required by the standard or by the control authority, of regulated pollutants in the discharge from each regulated process. Instantaneous, daily maximum, and long-term average concentrations, or mass, where required, shall be reported. The sample shall be representative of daily operations and shall be analyzed in accordance with procedures set forth in Section 26-55(b) of this article. (iii) Sampling must be performed in accordance with procedures set forth in Section 26-55 of this article. 6. Certification. A statement, reviewed by the user's authorized representative and certified by a qualified professional, indicating whether pretreatment standards are being met on a consistent basis, and, if not, whether additional operation and maintenance (O&M) and/or additional pretreatment is required to meet the pretreatment standards and requirements. 7. Compliance schedule. If additional pretreatment and/or O&M will be required to meet the pretreatment standards, the shortest schedule by which the industrial user will provide such additional pretreatment and/or O&M. The completion date in this schedule shall not be later than the compliance date established for the applicable pretreatment standard. 8. Signature and certification. All baseline monitoring reports must be signed and certified in accordance with section 26-55(i). (2) Compliance schedule progress reports. The following conditions shall apply to the compliance schedule required by Section 26-56(k)(1)(7) of this article: a. The schedule shall contain progress increments in the form of dates for the commencement and completion of major events leading to the construction and operation of additional pretreatment required for the industrial user to meet the applicable pretreatment standards (such events include, but are not limited to, hiring an engineer, completing preliminary and final plans, executing contracts for major components, commencing and completing construction, and beginning and conducting routine operation). b. No increment referred to above shall exceed nine (9) months. c. The industrial user shall submit a progress report to the control authority no later than fourteen (14) days following each date in the schedule and the final date of compliance including, as a minimum, whether or not it complied with the increment of progress, the reason for any delay, and, if appropriate, the steps being taken by the industrial user to return to the established schedule. d. In no event shall more than nine (9) months elapse between such progress reports to the control authority. (3) Reports on compliance with categorical pretreatment standard deadline. Within ninety (90) days following the date for final compliance with applicable categorical pretreatment standards, or in the case of a new source following commencement of the introduction of wastewater onto the POTW, any industrial user subject to such pretreatment standards and requirements shall submit to the control authority a report containing the information described in section 26-55(k)(1)(b)(4-6). For industrial users subject to equivalent mass or concentration limits established in accordance with the procedures in 40 CFR 403.6(c), this report shall contain a reasonable measure of the industrial user's long-term production rate. For all other industrial users subject to categorical pretreatment standards expressed in terms of allowable pollutant discharge per unit of production (or other measure of operation), this report shall include the industrial user's actual production during the appropriate sampling period. All compliance reports must be signed and certified in accordance with section 26-55(i). (4) Periodic compliance reports. a. All significant industrial users shall, at a frequency determined by the control authority but in no case less than twice per year, submit a report indicating the nature and concentration of pollutants in the discharge which are limited by pretreatment standards and the measured or estimated average and maximum daily flows for the reporting period. All periodic reports must be signed and certified in accordance with section 26-55(i). The control authority may sample and analyze user discharges in lieu of requiring the industrial users to conduct sampling and analysis. b. All wastewater samples must be representative of the industrial user's discharge. Wastewater monitoring and flow measurement facilities shall be properly operated, kept clean, and maintained in good working order at all times. The failure of an industrial user to keep its monitoring facility in good working order shall not be grounds for the industrial user to claim that sample results are unrepresentative of its discharge. c. If an industrial user subject to the reporting requirement in this section monitors any pollutant in accordance with approved procedures more frequently than required by the control authority, the results of this monitoring shall be included in the report. (l) A wastewater discharge permit shall include such conditions as are deemed reasonably necessary by the control authority to prevent pass through or interference, protect the quality of the water body receiving the treatment plant's effluent, protect worker health and safety, facilitate sludge management and disposal, and protect against damage to the POTW. (1) Wastewater discharge permits must contain: a. A statement that indicates wastewater discharge permit duration, which in no event shall exceed five (5) years; b. A statement that the wastewater discharge permit is nontransferable without prior notification to the control authority, and provisions for furnishing the new owner or operator with a copy of the existing wastewater discharge permit; c. Effluent limits based on applicable pretreatment standards; d. Self monitoring, sampling, reporting, notification, and record-keeping requirements. These requirements shall include an identification of pollutants to be monitored, sampling location, sampling frequency, and sample type based on federal, state or local law; and e. A statement of applicable civil and criminal penalties for violation of pretreatment standards and requirements, and any applicable compliance schedule. Such schedule may not extend the time for compliance beyond that required by applicable federal, state or local law. (2) Wastewater discharge permits may contain, but need not be limited to, the following conditions: a. Limits on the average and/or maximum rate of discharge, time of discharge, and/or requirement for flow regulation and equalization; b. Requirements for the installation of pretreatment technology, pollution control, or construction of appropriate containment devices, designed to reduce, eliminate, or prevent the introduction of pollutants into the treatment works; c. Requirements for the development and implementation of spill control plans or other special conditions including management practices necessary to adequately prevent accidental, unanticipated, or nonroutine discharges; d. Development and implementation of waste minimization plans to reduce the amount of pollutants discharged to the POTW; e. The unit charge or schedule of industrial user charges and fees for the management of the wastewater discharged to the POTW; f. Requirements for installation and maintenance of inspection and sampling facilities and equipment; g. A statement that compliance with the wastewater discharge permit does not relieve the permittee of responsibility for compliance with all applicable federal and state pretreatment standards, including those which become effective during the term of the wastewater discharge permit; and h. Other conditions as deemed appropriate by the control authority to ensure compliance with this ordinance, and state and federal laws, rules and regulations.

(Ord. No. 23599, § 15, 5-2-77; Ord. No. 27103, §§ 1, 2, 7-9-84; Ord. No. 29632, § 1, 9-10-89; Ord. No. 29829, § 1, 11-13-89; Ord. No. 31591, § 2, 7-12-93; Ord. No. 35423, § 1, 6-18-01; Ord. No. 35478, § 1, 7-16-01)